Nowadays, the decoration industry covers a wider and wider range of fields, including hotel decoration, office decoration, entertainment club decoration, restaurant decoration, kindergarten decoration and so on, and therefore gave birth to a lot of decoration companies. Well, as a Wuhan local construction company, Hubei Tuoyuan Construction Engineering Co., Ltd. has participated in large and small thousands of engineering and decoration projects, it is necessary to give all consumers to popularize the work of the company in the process of design and decoration of the main business.
One, the design program and construction drawings
The project will be laid out at the beginning of the project's floor plan, according to which the floor plan to submit a number of conceptual images, selected color tone style and preliminary materials, etc.. Then communicate with the A party, to be selected in the general direction of the style, it enters the deepening stage of the program. Determine the color of each wall material pattern and various wall decorations to be used in the proportion of the line, and then communicate with the effect of the Department of people, so that they are based on the conceptual drawings, floor plans and materials to go out of the effect of the drawings. Entering the stage of construction drawings, all the floor plan elevation drawings and sample drawings. Construction drawings are for workers to see, stone how to spell, how to hang the ceiling, each soft package hard package and glass splicing ratio and so on, these will have data in the construction drawings.
Two, fire engineering
Fire engineering is the whole project is the most important, about safety issues, must have the relevant qualifications of the company is qualified to implement, because it is important, so relatively complex, including a wide range of projects, including: the construction of automatic fire alarm system, automatic fire suppression system construction, smoke evacuation system, fire separation, indoor hydrant system, emergency lighting and evacuation indicator signs, fire prevention and fire blocking, etc.. Evacuation signs, fire prevention and blocking, etc.
Three, central air conditioning
In the process of renovation of engineering and public **** facilities, taking into account each space to save a certain number of central air conditioning vents and air return, renovation and transformation before the central air conditioning renovation plan must be handed over to the property review. After the completion of the project, the property also requires the production of a central air-conditioning project as-built drawings.
Four, strong and weak power integrated wiring
Decoration works to find professional qualified integrated wiring unit, by professional technicians to the site for the actual measurement of the strong and weak power of the reserved switches, sockets, and a variety of lines to all performance planning to the drawings, and then handed over to the property review.
Fifth, office furniture
In the decoration before the furniture, because most offices need office high partition, many lines, sockets are connected to the partition, so the furniture must have a close connection with the electrical engineers, the drawings are best to be determined by the two parties *** with the completion of the property review before you get.
In fact, the entire project is a complete and complex system, you must have qualified, professional engineering company to carry out decoration and construction, so that there will be quality assurance.