Current location - Recipe Complete Network - Catering franchise - Format template of evaluation report
Format template of evaluation report

evaluation report format template

evaluation report format template, evaluation is a very important part of self-learning work, in life, it is often necessary to write an evaluation report in order to successfully complete something. The following is a sample template for the format of the evaluation report. The format of the assessment report model template 1

According to the spirit of (F.B.F. [21 _] No.121), we now report the completion of the objectives and tasks of our bureau from October to September in 2111 as follows:

1. Completion of the objectives of key projects

Objectives and tasks: Zhongba Reservoir in the county has completed an investment of 41 million yuan and strives to start construction before the end of the year.

completion: from October to September, the investment was 13 million yuan (preliminary investment such as survey and design); All preliminary work such as feasibility study, initial design, environmental assessment and project establishment of the project has been completed before October 11, and the information has been submitted to the provincial and municipal tobacco bureaus, which has won the support of the executive vice governor of Zhong Mian and Li Dengju.

problems: due to the investment adjustment of the State Tobacco Bureau and the adjustment of the relevant leaders of the General Administration, all projects have been suspended, so the investment plan of this project has not been issued so far. Please give full consideration to objective factors in the assessment.

Second, the completion of the people's livelihood project objectives

(1) Objectives and tasks: the effective irrigation area for small-scale farmers will be increased by 1.2 million mu, and the water-saving irrigation area will be increased by 1.8 million mu.

completion: from October to September, the newly-increased irrigation area was 1.3 million mu, which was 1.18% of the target task; The newly-increased water-saving irrigation area was 1.99 million mu, and 117 and 6% of the target tasks were completed.

(2) objectives and tasks: to implement 1 small and medium-sized river regulation projects and comprehensively regulate rivers for 3 or 5 kilometers.

completion: from October to September, 2 small and medium-sized river regulation projects have been completed, with 5 or 3 kilometers of comprehensive river regulation (including 3 or 5 kilometers of flood control levees in Zhenhe and 1 or 8 kilometers of flood control levees in Zhongdu Town), and 151% of the target tasks have been completed.

(3) objective and task: to solve the drinking water safety problem of 1 million rural population.

completion status: from October to September, 51,111 people have been completed, accounting for 1.51% of the target tasks. It is estimated that 29,911 people will be completed before the end of the year.

iii. completion of investment attraction target

target and task: to complete the agreed investment attraction of RMB 1,111,111, with 51,111,111 yuan in place and 5 packaging projects.

Completion:

(1) The agreed investment was RMB 83 million from October to September, accounting for 1.83% of the target tasks. Among them, the agreement for the State Tobacco Bureau to invest 29 million yuan in Zhongba Reservoir has not been put in place, and other projects have already put in place 54 million yuan.

(2) From October to September, the actually paid-in fund was 54 million yuan, accounting for 1.18% of the target task (of which, the investment in safe drinking water was 16 million yuan; The investment in soil and water conservation slope farmland management is 11 million yuan; Small-scale farmland water conservancy investment is 14 million yuan; Jiang, sand mining owners invested 14 million yuan).

(3) 5 packaging projects from October to September, and 111% of the target tasks were completed. They are: comprehensive control project of soil erosion on sloping farmland from 21__ to 2116; Flood dike project for small and medium-sized rivers in townships; New county water supply project; New county sewage treatment plant; Jinjiang characteristic breeding project.

work measures in the fourth and fourth quarters

(1) further strengthen responsibilities around objectives. Further clarify the responsibilities of bureau leaders and stock rooms, and strictly implement target rewards and punishments.

(2) identify the gaps and further strengthen measures. Further strengthen the reporting and striving for the report, further strengthen cooperation and cooperation, and ensure the completion of the objectives and tasks throughout the year. The format of the evaluation report model template 2

I. General situation of the project

Many newcomers will copy the contents of the engineering data directly into the report, which actually makes the first mistake. Although they are all "engineering profiles", the information used in different places is different. In the project data, the general situation of the project is often introduced in detail, but in the safety assessment report, the focus is on safety issues. So how should the information be reflected?

firstly, the volume of the project and the construction method of the project. This information can judge the safety category of the project and is convenient for evaluation. Secondly, some basic data, such as the number of building floors, wheelbase, elevation and other information, can reflect the common quality problems that are easy to occur in such projects. Finally, the information of some contractors and supervision units is convenient for estimating the construction quality.

II. Basis for engineering safety assessment

Here are usually some industry standards. It should be noted that the industry standards should be updated in time, that is, the latest standards should be listed. If the standards are not updated in time, the safety of engineering construction cannot be reflected. At the same time, it should be considered that the standard should cover the scope of engineering design.

III. Risk analysis

Risk analysis should consider people, machines, materials, methods, environment and other aspects, and consider the influence of risk-causing factors on engineering risks. People who may be injured usually include operators, other people in the same working face and people around them, and the causes of accidents usually include mechanical equipment failure, human error and natural disasters.

IV. Scope of safety risk assessment

The scope of safety assessment of a project is not a general whole scope, but a targeted one, that is, select a section or scope where there may be safety risks in the project for assessment, otherwise some problems will be easily overlooked. However, the scope of assessment should also be prevented from generalizing and ignoring other possible security risks.

V. Safety risk assessment methods

Professional assessment methods should be used in professional projects. Usually, it is necessary to introduce the concept and implementation steps of risk assessment methods for operating conditions in detail; Then, the implementation steps of the risk assessment method are explained, and the calculation part of the design formula should explain the meaning of the formula and each letter, and if necessary, the data table should be cited; Finally, the special risk assessment.

VI. Requirements for safety risk levels

Here, the requirements for treatment measures corresponding to risk levels can be listed, which can be embodied in forms such as tables. The contents of other reports should be avoided here, and should be compiled according to the engineering characteristics.

VII. Determining the safety risk level

Here, it is necessary to list the risk occurrence probability level and judgment standard, and then introduce the risk loss level and judgment standard.

VIII. Comprehensive evaluation opinions on project safety production

According to the overall analysis of the evaluation report, comprehensive evaluation opinions on project safety production are given. This opinion needs to be refined to the details of each sub-project and analyzed in a targeted manner, and finally an objective safety evaluation is given. It should be noted that the rating opinions should not be stereotyped, and the safety problems of different projects should be objectively evaluated, and the existing risks and problems should be directly pointed out, which is very important for the subsequent project construction. The format of the evaluation report model template 3

1. Exercising the administrative authority entrusted by law.

the town * * insists on exercising its administrative power without being absent, offside and in a good position, and earnestly guarantees the effectiveness of administration according to law *. The members of the team actively use the rule of law to adjust the relationship between * and the market, enterprises and society, and do their best to ensure that the people in * area participate in market competition fairly and are equally protected by law.

second, standardize administrative decision-making behavior and ensure scientific decision-making.

define the administrative decision-making authority, scope and rules of each department. Establish and improve the system of project establishment theory, risk assessment, cost-benefit analysis, implementation follow-up feedback and accountability. All decisions involving the vital interests of the masses and major public interests have been made in advance by social stability risk assessment and public consultation, and the results have been announced to the public.

third, improve the administrative law enforcement mechanism and effectively strengthen law enforcement.

In the convenience service center, a specific law enforcement process with clear deadlines and responsibilities was put on the wall, and the law enforcement authority of each department was clarified. At the same time, strengthen the promotion of relatively centralized comprehensive law enforcement work according to law. At the beginning of the year, we signed a letter of responsibility for administrative objectives according to law with law enforcement officers of various departments, and implemented the professional ethics of administrative law enforcement, and incorporated administration according to law into the annual target management, and strictly enforced the assessment at the end of the year.

Fourth, standardize administrative law enforcement.

strengthen the inspection and supervision of administrative inaction, slow action and abuse. Full implementation of administrative law enforcement procedures such as openness, openness, notification, hearing, explanation and avoidance. Strictly implement the standards and norms of administrative discretion.

five, the action group is efficient and convenient.

seriously implement the "three systems": the first inquiry responsibility system, the time-limited completion system and the accountability system. In accordance with the requirements of "simple administration and decentralization", the authority to accept and handle is clearly defined according to law. * batch into the town convenience service center, project specification, process optimization, clear time limit, timely completion rate of 111%.

VI. Information shall be made public according to law.

except for statutory reasons, the information has been disclosed to the public in a timely, accurate and concrete manner, which is convenient for the public to inquire and obtain. Contents involving public interests or social affairs shall be published within 24 hours after decision-making, and * documents shall be published within 3 working days after issuance. The application for publicity shall be completed within the statutory time limit. * Effective operation of the interactive platform for communication with the public.

VII. The mobility is restricted and supervised.

online operation is open and transparent. I accepted the supervision of the NPC and CPPCC in accordance with the law, carefully handled the suggestions of NPC deputies and CPPCC proposals, accepted the hierarchical supervision of higher administrative organs, accepted the supervision of the masses and all sectors of society, and promptly corrected illegal and improper administrative acts.

VIII. Enhance the awareness and ability of the rule of law.

The system of * conference learning, special legal lectures and centralized training has been established and improved. Vigorously improve the leading cadres' enthusiasm in learning, understanding and using the law, and earnestly urge every working cadre to learn.

IX. Implementing safeguard measures.

Administration according to law has been incorporated into the work assessment and performance management of the town *, and the assessment will be hard at the end of the year. Implemented the requirements of the mayor as the first responsible person in our town to promote administration according to law. Every year, the Party Committee, the Standing Committee of the National People's Congress and the county * * reported on the promotion of administration according to law.