Several Provisions on Construction Site Management of Nanning Construction Project "Full Text

Nanning City, construction project construction site management provisions "full text"

Nanning City Government Decree No. 14, "Nanning City, construction project construction site management provisions" has been considered and adopted by the Municipal People's Government Executive Meeting on December 5, 2007, is hereby promulgated, since May 1, 2008 shall come into force. Below, I provide you with Nanning City, construction project construction site management of a number of provisions, the full text is as follows:

Chapter I General

The first in order to strengthen the city's construction project construction site management, to create a beautiful urban environment, improve the quality of engineering, safety and civilization of the construction level of management, according to "The Chinese People's Republic of China", the "construction project construction site management", the "construction site management", the "construction site management", the "construction site management", the "construction site management". Chinese People's Republic of China *** and the State Construction Law", "Construction Quality Management Regulations", "Construction Safety Management Regulations" and other relevant laws and regulations, combined with the actual situation in the city, the formulation of these provisions.

Article 2 The city's administrative area of the construction project construction site management, the application of these provisions.

The provisions of the construction project construction site, including housing construction, structures and their ancillary facilities, municipal infrastructure and supporting works, renovation works, building (structures) demolition, equipment installation, pipeline laying, landscaping and other construction activities and temporary construction of the site occupied.

Article III of the city, county (district) construction administrative departments in accordance with the responsibilities of the construction project within the jurisdiction of the construction site management to implement unified supervision and coordination. Construction administrative departments are specifically responsible for the construction of buildings, structures and their appurtenances, renovation works, municipal infrastructure and its supporting works, building (structures) demolition, equipment installation and other construction projects construction site supervision and management, construction quality, safety supervision and management organization is responsible for the specific implementation of the aforementioned work.

The administrative department of urban management in the city has been delivered to the use of urban roads for excavation, temporary construction occupation and other engineering construction site supervision and management.

Landscaping administrative departments of the landscaping project construction site supervision and management.

Water resources, safety supervision, labor security, health, quality and technical supervision, environmental protection, public security and other departments in accordance with their respective responsibilities to do a good job with the construction project construction site related management.

Article IV temporary construction project construction site supervision and management by the competent administrative department of construction.

The administrative department of planning shall, within three days from the date of issuance of planning permission documents for temporary construction works, inform the municipal or county administrative department of construction in writing of the construction unit of the temporary construction, the location and scope of temporary land and other related matters.

Article 5 The administrative department in charge of construction shall, in due course, organize city management, gardening, safety supervision, labor security, health, quality and technical supervision, environmental protection and other departments to carry out joint law enforcement inspections and special law enforcement inspections of the construction site of the construction project.

Article 6 The municipal administrative department of construction shall establish a credit file based on the construction industry integrity evaluation information system.

The municipal administrative department of construction shall regularly organize the relevant departments of construction, construction, supervision and other units and relevant practitioners to implement the construction project construction site management work evaluation, and the evaluation results into the credit file.

Construction, construction, supervision and other units in violation of laws, rules and regulations and the provisions of this regulation on the construction site of construction projects, by the relevant departments found to have illegal behavior or be imposed administrative penalties, the relevant departments shall promptly notify the municipal administrative department of construction, the municipal administrative department of construction shall be recorded in the credit file of the bad behavior, and regularly announced to the community.

Chapter II General Provisions

Article 7 The construction site shall not exceed the approved construction land, temporary occupation of roads, temporary land area.

Article VIII of the construction project construction site safety, environment and health management by the construction unit is responsible for.

Construction, supervision units in accordance with their respective responsibilities to manage the construction site.

Article IX of the construction project to implement the construction of general contracting, the general contractor is responsible for the construction of the construction site of the unified coordination and management, supervision and inspection of subcontracting units of the construction site activities.

The subcontracting unit shall be under the unified management of the general contractor, within the scope of its subcontracting to establish the construction works construction site management responsibility.

Construction projects to implement professional subcontracting, the construction unit should be unified to coordinate the management of the construction unit in accordance with the scope of the contract were responsible for the corresponding construction project construction site management.

Article 10 The construction unit in the preparation of project estimates, shall determine the construction safety, civilized construction measures. The cost shall be used for the construction of safety and protective gear and facilities purchase, safety conditions to improve production, safety and civilized construction, environmental protection measures and other expenses related to the construction site of the construction project.

Construction projects subject to bidding, the cost of the preceding paragraph should be listed as non-competitive costs.

Article 11 The administrative department in charge of construction through bidding and other ways to determine the funds to monitor the bank, the construction project safety protection, civilized construction measures to monitor the cost.

The construction unit should be with the administrative department of construction, the funds monitoring bank signed a tripartite monitoring agreement, and in accordance with the agreement will be the construction project safety protection, civilized construction measures into the funds monitoring bank set up a special account to ensure that the funds are used exclusively.

Article XII of the construction unit before applying for a construction permit or commencement report, shall, in accordance with the law, safety construction measures for the record, construction quality supervision procedures and safety supervision procedures.

Article XIII of the construction safety supervision procedures should provide the following information:

(a) safety construction measures program;

(b) construction safety protection, civilization and construction measures deposited into a special account of the valid voucher;

(c) construction unit determined by law, according to the relevant provisions of the construction unit for employees for workers compensation insurance, construction accident insurance valid vouchers;

(c) construction unit according to the relevant provisions of the construction unit for the employees for work injury insurance, construction accident insurance;

(d) construction unit of the construction unit for the workers to obtain the safety of the construction unit. (C) the construction unit determined in accordance with the relevant provisions of the construction unit for workers' compensation insurance, construction accident insurance valid certificate;

(D) according to the laws, regulations, rules and relevant provisions of the construction site to determine the list of persons in charge;

(E) other information that should be provided in accordance with the law.

Article 14 of the construction project construction site management gradually promote and apply modern information technology, the implementation of remote video monitoring. Municipal construction administrative department is responsible for the construction of construction projects in the city construction site remote video monitoring system construction work. Construction units to install the use of the system required costs, from the construction project safety protection, civilized construction measures in the cost.

The government's key construction projects, more than ten floors of high-rise buildings or single project construction area of more than 10,000 square meters of engineering projects, should be installed to use the construction engineering construction site remote video monitoring system.

Article 15 The construction unit shall, in accordance with relevant laws, regulations, rules and relevant provisions, in the relevant contract to specify the survey, design, construction, supervision and other units of production safety, civilized construction, project quality and construction site management responsibilities and responsible persons.

The construction process shall not replace the person in charge of the construction site. Need to replace, should be reported within three days from the date of replacement of the original project safety supervision procedures for the ` department for the record.

Article 16 The supervision unit shall include construction site management of construction projects in the scope of supervision. Found that does not meet the state, autonomous regions and the city of construction project construction site management requirements, shall require the construction unit timely rectification; the situation is serious, shall require the construction unit to temporarily stop construction, and timely report to the construction unit. Construction unit refuses to rectify or not stop construction, supervision unit shall promptly report to the relevant administrative departments.

Article 17 The construction project superintendent engineer is the construction quality, safety and civilized construction supervision of the implementation of the first person responsible for its duties include:

(a) timely organization of deep foundation pits, pile foundation, foundation, high templates, the main structure, important structural parts of the project and other items, acceptance of the branch and perform the related quality and safety supervision responsibilities;

(b) the use of unqualified construction materials, components and equipment in the project as well as violations of mandatory standards for construction, should be issued in a timely manner rectification notice, and is responsible for supervising the rectification;

(c) the construction unit, testing organizations and other illegal acts in the process of participation in the construction of engineering construction and construction engineering quality, safety supervision bodies reported to the relevant administrative departments and quality, safety supervision bodies;

(D) as required to sign the relevant quality, safety and other acceptance documents;

(E) other duties that should be performed according to law.

Article 18 The project manager is the construction unit on behalf of the construction unit is fully responsible for the project construction quality, safety and civilized construction of the first person responsible for its duties include:

(a) according to the record of the construction drawings and design documents and mandatory standards for engineering and construction construction of the construction organization;

(b) in the deep pit, pile foundation, foundation, high templates, main structure, important structural parts and other sub-items, sub-divisions;

(d) signing the relevant quality and safety acceptance documents as required;

(e) other duties that should be performed by law. (B) in the deep foundation, pile foundation, large templates, main structure, important structural parts of the project acceptance and completion of acceptance and acceptance of the project to be present and perform the supervision and management of the relevant quality and safety responsibilities;

(C) as required to sign the relevant quality, safety and other acceptance documents;

(D) other duties that should be fulfilled according to law.

Article 19 The construction unit shall collect and organize technical files and construction management information in a timely manner, data collection should be synchronized with the construction progress. Construction, supervision and other units at all levels of technical management personnel shall fill out the information in accordance with the relevant requirements, check, validate, organize, and sign to confirm.

Article 20 The construction unit shall be equipped with full-time production safety management personnel in accordance with relevant regulations. Mainly responsible for supervising and inspecting the implementation of construction site safety measures as well as operators to comply with the production safety system. Found hidden safety accidents, should be promptly reported to the project manager; on illegal command, illegal operation, should be immediately stopped, and timely elimination of hidden safety hazards.

Each construction team should be equipped with a safety inspector, responsible for production safety inspections within the team, and promptly stop the behavior of operators working against the rules.

Article 21 production equipment operators should be in accordance with the relevant provisions of the state and autonomous regions to obtain professional qualifications before work.

Chapter III construction site management specifications

Article 22 The construction site safety measures must comply with the relevant national norms and requirements of the relevant industry management:

(a) scaffolding frame must be taken to tightly closed measures, the frame should meet the requirements of the provisions of the knot, the floor-standing type of external scaffolding foundation should be hardened, and the scaffolding should be used for the construction of a scaffold. Scaffolding foundation should be hardened, and set up to meet the requirements of the mat and base;

(ii) the site use of steel pipe, fasteners should be tested in accordance with the provisions of the qualified;

(iii) unloading platforms, edges, holes in the protective facilities should be stereotypes, tooling, standardization;

(d) for the greater danger of the division, sub-projects, the construction unit should be compiled Special safety construction program, to meet certain conditions, but also should organize experts to demonstrate the program, construction should be strictly in accordance with the supervision unit to review and approve the program construction;

(e) construction equipment should have intact safety guards;

(f) tower cranes, material hoists and elevators should be configured to ensure that the normal use of the safety insurance device;

(h) tower crane, material hoist and elevator safety should be configured to ensure that normal use;

(i) tower crane, material hoist and elevator safety insurance device should be configured to ensure that normal use;< /p>

(g) temporary electricity must comply with the three power distribution system, TN?S zero protection system and two leakage protection system, each power equipment should have a special switch box, the implementation of? A machine, a gate, a leakage box? )

(h) safety protection gear, machinery and equipment, construction equipment and accessories in the construction project before entering the construction site, should be checked and qualified to be put into use;

(ix) construction cranes and overall lifting scaffolding, templates and other self-erecting erection facilities to be used after acceptance;

(x) construction units should be entrusted with the appropriate qualifications of the unit Undertake the construction site construction machinery and overall lifting scaffolding, templates and other self-erecting erection facilities, installation and dismantling work;

(k) to take effective measures to protect the construction site surrounding the green, power supply, lighting, and other public **** facilities, underground pipelines and underground facilities of the safety of the construction site;

(xii) scaffolding should be used in accordance with the provisions of the state and the relevant departments of the scaffolding of buildings. Provisions of the mesh safety net, safety net must be regularly rinsed to keep clean. Safety nets must be tested before use, does not meet the requirements shall not be used;

(xiii) construction site operators should be required to wear helmets and the use of safety belts correctly;

(xiv) elevator shaft handover elevator installation unit before entering the construction site, the construction unit should be organized to supervise the supervision, construction and installation of the elevator shaft protective facilities and work surface acceptance, and handle the relevant transfer procedures. Relevant handover procedures.

Article 23 of the urban area of the city construction unit shall be closed to the construction site of the construction project fencing.

The construction site of the building and its appurtenant facilities, renovation works, construction (structures) works, temporary construction and demolition, equipment installation works should be set up enclosure.

Municipal infrastructure and its supporting works, pipeline laying and landscaping works of the construction site, you can set up a continuous fence, you can also set up a fence in sections according to the progress of the project. Excavation area and due to special circumstances can not be fenced, warning signs and night warning lights should be set up, in the engineering danger should also take effective protective measures.

Article 24 of the enclosure should be strong and safe, inside and outside to keep clean, the main streets of the city's construction works construction site enclosure should be in accordance with the standard requirements of urban appearance landscaping, regular updates.

Housing construction and its ancillary facilities projects, decoration projects, building (structures) engineering, temporary construction and demolition, equipment installation project construction site enclosure materials should be used neat, beautiful, firm, uniform form of assembly activity sheet, shall not use asbestos tiles, plastic sheeting, geotextiles, textile cloth, bamboo string sheet panels, safety nets and other deformable materials, shall not be used in place of the warning band Enclosure.

The standards of enclosure set by the municipal construction administrative department in conjunction with urban management, gardening and other relevant departments to develop and publicize to the community.

Article 25 The entrance and exit of the construction site of the housing construction project shall be set up gates. In the case of site license, municipal infrastructure projects should be set up at the entrance and exit gates.

The gate set the standard by the municipal construction administrative department to develop and publicize to the community.

Article 26 The construction site shall be set up in a conspicuous position in the project profile card, the site of the main management staff list and supervisory telephone number card, fire protection card, safety card, civilized construction card, labor wage monitoring system card and other public notices and construction site plan. Single project construction area of 10,000 square meters or more, should be set up building facade effect.

Excavation and temporary construction in the city roads occupied, should be set up at the construction site signage, publicizing the project name, construction units, supervision units, construction units, contact phone number, start and promise to repair the completion date and temporary occupation (excavation) permit documents.

Article 27 The construction site shall comply with the following provisions of health and prevention of environmental pollution:

(a) maintain good drainage system, control sewage discharge.

1. construction site should be buried around the reasonable diameter of the drain, the use of brick masonry drainage ditch, the top of the ditch should be set up cover;

2. basement, living areas, office areas, work areas and other sites shall not be waterlogged;

3. site entrances and exits should be set up concrete washing platforms, sedimentation tanks and flushing equipment;

4. construction wastewater and slurry Need to be discharged into the urban drainage network and its ancillary facilities, must be in accordance with the provisions of the approval procedures, and only after precipitation treatment can be discharged from the site, shall not pollute the streets.

(ii) take effective dust control measures to control dusty operations.

1. bulk materials should be closed or covered, earthwork should be sprinkled wet, mixing site should take effective dust control measures;

2. construction waste cleanup should take effective dust control measures, is strictly prohibited from the heights of the downward spread;

3. field exposed ground should be taken to take greening measures or use dust net cover;

4. field transportation Roads should be washed regularly, out of the site of the motor vehicle must be in the wash platform sweeping rinse clean, transportation of bulk materials, fluid materials or removal of garbage, should be sealed before going on the road.

(c) The construction site should be set up in the field of the main transportation channel.

(d) construction site field should be hardened in accordance with the following requirements:

1. The main transportation corridor should be hardened with C20 or more concrete;

2. Material stockpiles, warehouses, processing yards, etc., must be hardened with C15 or more concrete (thickness ?100 mm);

3. Office and living area sites in a reasonable Office area and living area site in a reasonable green on the basis of comprehensive concrete hardening treatment.

(e) office area, living area should be set up separately from the operating area, the construction site field of temporary buildings and facilities must be used in accordance with the provisions of the assembled movable boarding house or brick masonry house, the office must be used in movable boarding house and must be constructed in accordance with the relevant technical requirements and meet the requirements of safety, hygiene, heat preservation, ventilation, etc., and is prohibited to build wooden houses, tents and the use of enclosure walls to build temporary Buildings or facilities.

(F) entrances and exits, gates, enclosures and external scaffolding fa?ade to maintain cleanliness and hygiene, prohibit indiscriminate posting of advertisements, office, living area garbage should be cleaned up in a timely manner to ensure that the site is clean and tidy, in line with the requirements of the standard urban appearance.

(VII) construction site should be set up in the field of construction waste, construction waste centralized storage points, construction materials, components, materials should be classified and stacked in the construction of the general plan delineated area, and hanging stereotypes of the signage.

(H) set up a collective canteen, should be required to obtain a health permit, and comply with food safety laws, regulations and rules.

(ix) construction site field shall not burn linoleum, paint and other substances that produce toxic, harmful fumes and malodorous gases.

(j) the construction should use low-noise equipment, noise, vibration of construction equipment and machinery, should take muffling, vibration, noise reduction measures, in line with the requirements of occupational disease prevention and control to ensure that the construction noise and vibration in line with the city's environmental noise emission standards.

Article 28 The demolition of buildings (structures) shall be qualified by the demolition operations and safety production license of the construction unit to undertake, to take the requirements of the mode of operation, demolition, removal required to take spraying and other dust control measures.

Chapter IV Legal Liability

Article 29 The construction, urban management, landscaping and other administrative departments in accordance with the laws, rules and regulations and the provisions of this regulation, the violation of the provisions of the construction site management of construction projects shall be dealt with.

Article 30 One of the following acts, the administrative department in charge of the implementation of construction project construction site management of the offending unit shall be warned and ordered to make corrections within a specified period of time, and may impose the following fines:

(a) violation of paragraph 2 of Article 15 of the present Provisions, the construction process of replacing the person in charge of the construction site, and did not file the record in accordance with the provisions of this provision, may be subject to a fine of 1,000 yuan;

(B) violation of the provisions of Article 23, paragraph 3, paragraph 1 and paragraph 2 of Article 24, the fence set up does not meet the standards or municipal infrastructure and other works of the construction site is not set up according to the requirements of the fence or warning signs, can be imposed a fine of 1,000 yuan to 10,000 yuan;

(C) violation of Article 25 of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the provisions of the gate, can be imposed a fine of 500 yuan to 5000 yuan fine;

(d) violation of the provisions of Article 26, not provided for the installation of signs, diagrams or hanging the relevant permits, can be imposed a fine of 200 yuan to 2,000 yuan;

(e) does not comply with the provisions of the provisions of Article 27, paragraph (a) items 1 to 3, (b), (c), (d), (f), (g) items related to the construction project construction site hygiene and Environmental protection management specifications, can be punished by 500 yuan to 5000 yuan.

Article 31 construction, supervision and other levels of technical management personnel in violation of the provisions of Article 19 of the provisions of the technical files and construction management data are not collected and organized in a timely manner or not in accordance with the requirements of filling out, calibrating, validating, organizing the quality and safety control information, and sign to confirm, the competent administrative department of the construction shall order it to make corrections, and may impose a fine of 500 yuan on the responsible person.

Article 32 Violation of the following provisions of Article 22 of the Regulations, production safety assurance measures do not meet the relevant standards and requirements, by the implementation of the construction project construction site management of the administrative department of the offending unit shall be warned and ordered to make corrections within a specified period of time, and may impose the following fines:

(a) Violation of the provisions of paragraph (a) to (f), may be subject to a fine of 1,000 to 10,000 Yuan fine;

(ii) violation of the provisions of items (xii) and (xiii), may be imposed a fine of 500 yuan to 5000 yuan.

(c) Violation of the provisions of paragraph (xiv), may be fined 1000 yuan.

Article 33 Units or individuals in violation of the following provisions shall be dealt with in accordance with relevant laws, rules and regulations:

(a) violation of the provisions of Article 10 (1), Article 16, 17, 18, 20, Article 23 (1), Article 28, Article 22 (7) to (11), the competent administrative department of construction in accordance with the "Regulations on the Administration of Construction Safety" and other provisions shall be dealt with. Management Regulations" and other provisions shall be dealt with;

(2) violation of the provisions of Article 27 (1) item 4, the urban drainage management department in accordance with the "Urban Drainage Permit Management Measures" shall be dealt with;

(3) violation of the provisions of Article 27 (8), (9), (10), the environmental protection administrative department, the competent department of health in accordance with the "Chinese People's Republic of China and the State Environmental Protection Agency". Chinese People's Republic of China *** and the Prevention and Control of Environmental Noise Pollution Law", "Chinese People's Republic of China *** and the State Food Sanitation Law" and other provisions shall be dealt with.

Chapter V Supplementary Provisions

Article 34 The people's governments at the county level may formulate the on-site environmental sanitation specifications and the standards for the setting of hoardings and gates applicable to the construction sites of construction projects under their jurisdiction according to the laws, regulations and these provisions.

The standards and specifications for environmental and sanitation management, fencing and other facilities set up at temporary construction sites within the city shall be formulated and published by the competent department of municipal construction administration.

Article 35 as part of civil engineering projects such as housing construction, decoration works, excavation of urban roads and landscaping projects construction site, by the administrative department in charge of construction supervision and management.

Article 36 These provisions shall come into force on May 1, 2008 .

;