Zhangjiagang Reservoir Area is located in Zhangjiagang Yang Zijiang Chemical Industrial Park on the right bank of the Yangtze River in Jingang Town, Zhangjiagang City, Jiangsu Province, and belongs to Zhangjiagang Free Trade Zone, Jiangsu Province. It is about 135km away from Wusong Estuary, Shanghai 150km away from Suzhou 1 10k m away from Wuxi and Changzhou. There are 54,000-ton and 20,000-ton dedicated liquefied petroleum gas terminals, with coastline of 5 10/0m and front water depth of10m. With the development of Zhangjiagang Yang Zijiang International Chemical Industry Park, many well-known chemical enterprises at home and abroad have settled in Yang Zijiang International Chemical Industry Park. Zhangjiagang and even the lower reaches of the Yangtze River have formed a complete chemical industry chain, forming a good development momentum, and the storage business in the reservoir area has great potential.
Main process equipment
Two 3 1 1,000 cubic meters low temperature and atmospheric pressure liquefied petroleum gas storage tanks and two 3 1 1,000 cubic meters liquefied petroleum gas pressure spherical tanks are being built in the reservoir area. 46 * * * 200,000 cubic meters of chemical storage tanks and supporting facilities; 8-car loading station for high-purity liquefied petroleum gas (LPG) tankers and 16-car loading station for liquid chemicals, as well as other supporting fire-fighting and water and electricity utilities, provide customers with 24-hour uninterrupted high-quality ship loading and unloading services.
Main business types
Operating pure propane, pure butane and liquefied petroleum gas with any proportion of pure propane/pure butane imported from the Middle East;
Chemicals engaged in storage and transportation mainly include methanol, toluene, xylene, styrene, ethylene glycol, propylene glycol, n-propanol, isopropanol, n-butanol, isobutanol, isooctyl alcohol and diethylene glycol. Note: The designed annual transportation capacity of liquefied petroleum gas is 500,000 tons, and that of liquid chemicals is 2 million tons.
Main process capability
1, storage capacity:
Frozen propane tk10131000m3 (15000t);
Frozen butane tk10231000m3 (15000t);
Pressure propane d-103a1000m3 (420t);
Pressure butane d-103b1000m3 (450t);
200,000 cubic meters of chemical storage tanks (46 storage tanks);
2. Transport capacity:
Unloading of frozen propane 1000M3/ hour;
Unload the frozen butane at the speed of 1000M3/ hour;
Pressure gas spherical tank 150 tons/hour;
Liquefied petroleum gas loading and unloading ship 150 tons/hour;
Liquefied gas carrier 20 tons/hour (per parking space);
Chemical tanker 50 tons/hour (per parking space). General situation of Taicang reservoir area
Taicang Reservoir Area is located at No.2, Liujiagang Petrochemical Road, Fuqiao Town, Taicang City, Jiangsu Province. Located in the center of the "Yangtze River Delta" and adjacent to the "Yangtze River Golden Waterway" in the north, it has a superior geographical position. Nanguan land transportation "Shanghai-Nanjing artery"; It is adjacent to China Economic Metropolis in the east and China Suzhou, Wuxi and Changzhou Economic Development Zones in the west. Taicang Reservoir Area is a high-quality asset acquired by Donghua Energy Co., Ltd. from Suzhou Bibi Company in June 5438+February 2009. Taicang reservoir area is independently accounted for and operated in the name of Taicang Donghua Energy and Gas Co., Ltd. ... It rents 50,000-ton and 3,000-ton dedicated liquefied petroleum gas terminals, which can pick up and unload all kinds of refrigerated and pressurized liquefied petroleum gas carriers. Main process equipment
Taicang Reservoir Area has a propane freezing tank TK 10 1 and a butane freezing tank TK 102. Four unloading arms (M 100A/B, M 10 1A/B), one loading arm, two propane feed pumps (P 10 1A/B) and three butane feed pumps (p Two propane heaters H 100A/B, two propane condensers E 103A/B, one butane condenser E 105, and three propane compressors c10/a/b/c; There are six normal-temperature high-purity liquefied petroleum gas spherical tanks TK201/202/203/204/205/206/,12 for loading hydrocarbons and seven parking spaces for loading and unloading tanks. And a gas cylinder filling station consisting of three normal-temperature horizontal tanks and a gas cylinder filling system. To provide customers with 24-hour uninterrupted high-quality ship loading and unloading services.
Main process capability
1, storage capacity
Frozen propane tk10131000m3 (15000t);
Frozen butane tk10231000m3 (15000);
Pressure propane TK2031000 (500t);
Pressure butane TK2061000 (500t);
Mixed or domestic pressure gas TK201/202/204/205 4×1000m3 (4× 500t).
2. Transport capacity
Unload the frozen propane at a speed of 550 tons/hour;
Unloading the frozen butane at a speed of 550 tons/hour;
Pressure gas spherical tank 150 tons/hour;
Mixed or domestic pressure gas loading and unloading ship 150 tons/hour;
Pressurized gas tank car 20 tons/hour (per parking space) × 7;
Pressure unloading tank truck 10t/h (per parking space). General situation of Ningbo reservoir area
Ningbo Reservoir Area is located atNo. 1, Guanwai Road, Daxie Development Zone, Ningbo City, Zhejiang Province. Daxie Development Zone is located in the middle of the mainland coastline, at the T-junction of the golden waterway of the Yangtze River and the golden coastline, in the Yangtze River Delta region with the most dynamic economy and development potential in China, about 40 kilometers away from the center of Ningbo. The distance from Shanghai to the north is 100 nautical mile. In May 2008, after the Hangzhou Bay Bridge connecting Ningbo and Shanghai was completed and opened to traffic, the journey from Shanghai was shortened to two hours. It has a 50,000-ton (and two 5,000-ton berths) and a 5,000-ton dedicated liquefied petroleum gas terminal. The company's wharf is close to the international waterway, with a wide water area, and 300,000-ton ships can enter and leave freely. It is one of the best choices for large-scale energy transit bases along the eastern coast of China. Main process equipment
The reservoir area is 65m underground and125m underground. There are two storage tanks of propane and butane with 250,000 cubic meters each, each of which consists of several caves with a height of 22 meters, a width of 20 meters and a length of more than 200 meters. And equipped with 4 propane heating furnaces and 1 butane heating furnace; Tanker loading area with 6 loading positions, 4 unloading positions and 1 super loading position; TGT tail gas treatment and recovery device and other equipment. To provide customers with 24-hour uninterrupted high-quality ship loading and unloading services.
Main process capability
1, storage capacity:
250,000 cubic meters of underground propane chamber;
Underground butane cave is 250,000 cubic meters.
2. Transport capacity:
Unload the frozen propane at a speed of 650 tons/hour;
Unloading frozen butane1000t/h;
Shipment volume (250 tons/hour× 3);
Loading (3 1.5 tons/hour/parking space ×6).