catalogue
1. kitchen demolition and renovation 2. Kitchen water and electricity. Kitchen waterproofing
4. Fine seams in the kitchen (to be considered before tiling)
5. Tiles and check valves 6. to be continued
My kitchen: 5 square meters open, newly renovated.
1. Demolition and renovation of kitchen (non-bearing wall)
Everyone will have an obsession with home in their hearts. I hope the kitchen is warm, I can walk around at will, I don't need to open and close the door, and I don't want people who cook to be isolated. Leave the soot problem to Hu Defu people or Mr. Hood to solve.
2. Kitchen water and electricity
Electricity:
For my decoration, I neglected the power of kitchen appliances. The refrigerator, range hood, rice cooker and oven add up to a lot of power. The original developer reserved 2.5 square meters of kitchen line. Considering that the power of ovens and other single pieces is more than 3000 watts, the kitchen wires are all changed to 4 square meters.
Decoration experience: when talking with the decoration company about electrical transformation, be sure to die. My home is calculated by points, and there are 30 points on the contract list (the decoration company gives 25 points, which is enough, in case we say 30 points). If it exceeds, we have to increase the money! ! ! If the distance between pipes is too long, some people need to pay more. It is suggested that when talking with the decoration company, it should be charged and sealed in one way.
Point: Point-by-point billing. Some decoration companies calculate nine-hole trunking according to two points. My master who changed water and electricity is very good. He said that their settlement with the decoration company was based on 1 minute. That's why I asked the decoration company to finalize the nine-hole trunking according to 1 minute, which saved unnecessary expenses.
The layout of the electrical points needed at home is planned in advance, so that I can take the initiative. I painted it after talking about the decoration company.
Water:
Selection of main valve for kitchen water pipe control: choose circular changing hands. My house changes hands in one direction, which is easy to be touched and needs to be changed.
The kitchen is waterproof.
Unlike bathrooms, kitchens need to be completely waterproof when using open water. In the case of limited budget, it is recommended that you do local waterproofing, and do local waterproofing in the areas of drainage pipes, smoke pipes and hand basins.
4. The kitchen is beautifully sewn
Kitchen joints must be considered before tiling. Brick-to-brick joints are generally 2mm, jointing agent is 1.5mm, floor tiles are generally 2mm and 2.5mm. I chose 300*600 bright white small square bricks for the kitchen wall. One is that it is not easy to choose a good-looking sewing agent, and the other is to save money, so I choose to leave a small seam for jointing. If it is sewn beautifully, it will be clean. After all, the kitchen is a place with heavy oil smoke. In short, each has its own advantages and disadvantages. It's up to you to choose. But if it is a gray wall brick, the color of the seam will be much better.
Before joining:
After jointing: the transition is perfect, the colors are connected naturally, the effect is satisfactory, and there will always be a way to solve the dirt.
5. Tiles and check valves
After the floor tiles are laid, the height of the home is less than 2.6 meters, and the smoke outlet of the range hood is raised by bricklayers, so that the ceiling can be higher in the later period and the kitchen will not be too short.
The smoke exhaust check valve reserved by the developer was removed, and the quality of the project was too poor. Use a better check valve for three meals a day to prevent the fumes from other people's homes from escaping to your home during the cooking peak.
6. To be continued
Subsequent ceilings and cabinets are easier to handle. ...
The content is provided by naughty Nicholas, who is a good user. For more questions, let's live in the APP and communicate directly with the host ~