When does Wenling x8 13 Datang Line leave?
Tender Notice X8 13 for Survey and Design of Wenling Datang Line Reconstruction Project (Guan 'ao Section)

2021-07-1617: 42: 03 visits: 952 font: [large, medium and small] print and share to:

Survey and Design of Datang Line (Guan 'ao Section) Reconstruction Project in Wenling City X8 13

announcement of tender

1. Bidding conditions

Wenling X8 13 Datang Line Reconstruction Project (Guan 'ao Section) (hereinafter referred to as this project) has been approved by Wenling Development and Reform Bureau with document [202 1] 152. The owner of the project is Wenling Communication Industry Co., Ltd. (hereinafter referred to as the tenderer), and the construction funds come from local self-financing. The project has met the bidding conditions, and now the survey and design of the project are subject to public bidding.

2. Project overview and bidding scope

2. 1 project overview: this project starts from Xiao 'ao Village, intersects with S226 (pile number K23+200), starts from pile number K0+000, and uses Datang Line (Xiao 'ao Lane) in Wenling City to rebuild the pioneer section of the project. The route is set to cross the mountain and enter Guan 'ao Tunnel eastward. The terminal is K2+550, and the total length of the line is 2.55km, in which the pile number of the newly-built section is K0+51~ K2+550, which is about 2.034km long, and the tunnel is 1430m/ 1.

This project plans to adopt the secondary highway standard specified in Technical Standard for Highway Engineering (JTG B0 1—20 14) of the Ministry of Transport, with a design speed of 60 km/h.

2.2 tender scope: there are 1 tender section in this tender, and the main work contents include highway engineering [including route, subgrade, pavement, bridge and culvert, tunnel, intersection, traffic engineering and facilities along the line (including traffic safety facilities, greening, environmental protection, lighting, etc.). )] and other engineering investigation, preliminary design, technical design (when necessary), construction drawing design, budget document preparation and construction.

2.3 service cycle

(1) Within 15 days after signing the contract, prepare the general survey and design outline, field survey and geological survey description, and submit them to the Employer for approval; Within 45 days after the signing of the contract, submit the preliminary survey and preliminary survey report for review through preliminary survey and field acceptance (if necessary) (copies: provided as required);

(2) Submit preliminary design documents for review within 75 days after preliminary survey and site acceptance (if necessary) (number of copies: provided as required);

(3) Submit detailed survey and survey report for review within 45 days after the preparation of preliminary design documents (copies: provided as required);

(4) Within 60 days after the completion of detailed survey and field survey, submit the construction drawing design documents of the main civil engineering for review (copies: provided as required), and the construction drawing design documents of other projects shall be provided according to the project progress and the requirements of the owner;

(5) Revise and improve the survey report, various design documents and special research report (if necessary) within 30 days after receiving the review opinions from the consulting unit, the owner and the superior competent department, and submit the final draft of the survey report, preliminary design documents and special research report (if necessary) (number of copies: provided on demand) and the final draft of construction drawing design documents (number of copies: provided on demand);

(6) Submit drawings, bill of quantities, reference materials, special technical specifications for construction projects and other bidding materials in batches according to the needs of the employer's bidding progress.

(7) Land requisition and demolition drawings: completed within 15 days after the preliminary design documents are approved;

(8) According to the requirements of the tenderee, complete the special report of each stage on time (if necessary);

(9) Follow-up service on the construction site: from the project commencement to the project completion acceptance, the construction period is tentatively set at 2 1 month; The defect liability period is 2 years.

3. Qualification requirements of bidders

3. 1 This tender requires bidders to have independent legal person qualification, comprehensive Grade A qualification in engineering design [or Grade B and above qualification in engineering design highway industry or Grade B and above qualification in engineering design highway industry (highway)], comprehensive Grade A qualification in engineering survey [or Grade B and above qualification in engineering survey (geotechnical engineering)], and have corresponding performance and personnel composition ability.

3.2 This bid was accepted by the consortium. Bidding in the form of a consortium shall meet the following requirements: all parties to the consortium have independent legal personality, and the total number of leading members of the consortium shall not exceed 2. The leader of the consortium shall have the comprehensive Grade A qualification of engineering design [or Grade B or above qualification of engineering design highway industry or Grade B or above qualification of engineering design highway industry (highway) specialty].

3.3 Bidders with Grade A qualification of engineering design highway industry or Grade A qualification of engineering design highway industry (highway) should be included in the latest list of highway engineering design qualification enterprises published by the national highway construction market credit information management system, and their names are consistent with the list of design qualification enterprises. Those who are not included in the latest list or whose names are inconsistent with the list will not pass the qualification examination.

3.4 Any legal person or other organization (including all members of the consortium) that has an interest in the tenderer and may affect the fairness of the tender shall not participate in the bidding. The person in charge of the unit is the same person or different units with holding (including legal representative holding) and management relationship shall not participate in the bidding of this bid section at the same time.

4. Acquisition of bidding documents

4. 1 Anyone who is interested in bidding, please download the bidding documents or log on to the electronic trading platform of Wenling public resources before the deadline for submission of bidding documents (/col/col1402172/index.html, the same below).

4.2 The clarification, modification and supplement of the bidding documents of this project are published on the website of Wenling Public Resources Trading Center. Please pay attention to the Q&A announcement on the website of Wenling Public Resource Trading Center. The bidder shall bear the consequences caused by not browsing and downloading in time.

5. Submission of bid documents and related matters

5. 1 This project is a whole-process electronic bidding project, and the electronic bidding documents must be uploaded to Wenling public resources electronic trading platform before the deadline for submission of bidding documents 202 1 (the same below) at 9: 30 on August 6th.

5.2 The tenderee will not accept the bid documents uploaded or not uploaded to the designated trading platform within the time limit.

6. The media that issued the announcement

This tender announcement was posted on the Zhejiang Public Resource Trading Service Platform and the website of Wenling Public Resource Trading Center (/col/col1402172/index.html).

7. Other matters

7. 1 If the bidder is not registered and verified on the electronic trading platform of public resources in Wenling, it should apply for registration and verification first. For specific requirements, please visit the website of Wenling Public Resources Trading Center, and inquire in the work guide "Operation Manual for Registration and Audit of Bidder Platform for Construction Projects" (or call 0576-86 109764).

7.2 This project is the whole process of electronic bidding. Bidding enterprises (consortium bidding only refers to the leader) must apply for CA digital certificate, and CA digital certificate must be bound with their respective companies on Wenling public resources electronic trading platform, otherwise electronic bidding documents cannot be produced, uploaded and decrypted. For details of CA digital certificate processing, please refer to "Guide to CA Digital Certificate and Electronic Signature" on the website of Wenling Public Resource Trading Center, or contact Hangzhou Gutian Information Technology Co., Ltd.: customer service telephone number: 400-0878- 198, service QQ: 233035229 1, 262967924.

7.3 The electronic tender of this project must be made and uploaded by "Electronic Tender Making Tool V2.0(20200330)" developed by Ningbo Jerry. Tools and operation manuals for making electronic bidding documents can be downloaded from the website of Wenling Public Resources Trading Center. Ningbo Jerry Technical Support: 18067 100830.

7.4 Address of Wenling Public Resource Trading Center: No.555, Jiulong Avenue, Wenling City.

8. Contact information

Tenderee: Wenling Communication Industry Co., Ltd.

Address: No.0/9 Zhonghua Road, Taiping Street, Wenling City

Contact: Yi

Tel: 0576-86 105 179

Bidding Agency: Jianjing Investment Consulting Co., Ltd.

Address: 8th Floor, Wenling Service Building

Contact: Edison Chen

Tel: 0576-8 176 1088

Chuanzhen: 0576-86087802