Summary of flood control emergency plan exercise activities 1

On June 26th, 20xx, according to the company's overall work arrangement, in order to improve the safety awareness of all employees, test the scientificity, feasibility and practicability of the company's emergency plan, enhance the employees' resilience and self-protection ability in case of emergency, ensure that disasters can be avoided in case of accidents, ensure the life safety of personnel to the maximum extent, improve the overall emergency response ability of the company's employees to the evacuation of underground personnel, and test the coordination ability of all departments, workshops and project departments stationed in the company.

In order to ensure that the drill can be carried out according to the scheduled process, the Security Department will issue a notice and plan about the drill on June 24, and train the main person in charge at 5 pm on June 24, requesting to convey it to every employee and study hard to ensure that the drill achieves the expected purpose.

First, the exercise process

At 9: 00 a.m. on June 26th, the flood control and emergency evacuation drill officially started, and the drill records are as follows.

At 9 o'clock, company leaders, dispatching directors and rescue leaders gathered in the centralized control center. http://Www.CreDitSaiLing.Com

At 9: 05, the commander-in-chief Wang announced the launch of the flood prevention emergency plan.

At 9: 05, the attendant in the dispatching room received a flood report (the rainfall exceeds 50mm within 24 hours and immediately notified the company's chief dispatcher → the chief dispatcher then reported the situation to the commander-in-chief Mr. Wang (the rainfall exceeds 50mm within 24 hours, and the underground personnel need to be evacuated urgently, and the existing personnel) → Mr. Wang immediately gave an order to start the flood control emergency plan.

The dispatcher immediately telephoned Gao Luofang, the head of emergency rescue team, Kong Xiaohui, the head of alert support team, Hao, the head of logistics support team, Lu Changchang, the head of medical rescue team, and Zhang Fufeng, the head of electric power support team, and organized personnel to implement emergency procedures.

At the same time: the dispatcher informs the underground dispatcher and the underground duty leader → organize the underground personnel to evacuate immediately after receiving the notice.

At 9: 07, after the emergency plan was started, inoue rescuers immediately gathered at the auxiliary wellhead. Immediately organize personnel to lift the well.

At 9:08, when all the teams were assembled, General Manager Gao, the leader of the rescue team, reported to General Manager Wang that the rescuers were in place and the relief materials were ready. Later, Mr. Wang arranged to fully organize the rescue and remain vigilant.

At 9: 09, Mr. Gao divided the rescuers into four groups: electromechanical workshop, Wenjing project department, Longkou project department and Sheng Da project department, with four people in each group, and each group appointed a team leader. The electromechanical workshop organizes personnel to connect the pump and pipeline. The other three groups quickly carried out flood fighting and rescue work, put sand into woven bags, blocked the east gate of the auxiliary shaft (three-layer woven bag), and organized rescue of trapped people underground on the other hand.

At 9: 15, the east gate of the auxiliary shaft was blocked, and the water pump and water pipe were connected.

At 9: 0016, 22 people were raised in the first tank underground.

At 9: 20, the second tank rose, with 22 people.

At 9: 25, 20 people in the third tank were raised, and all the underground personnel were raised.

At 9:3 1 wellhead, all hook counting personnel have arrived, and report to the toolpusher. Later, Mr. Gao reported to Mr. Wang that all the underground personnel had been raised and the rescue was over; The wellhead sealing has been completed and the flood situation has been effectively controlled.

At 9: 33, the personnel of the rescue headquarters rushed to the auxiliary wellhead from the dispatching room to check the rescue situation and confirm that the rescue measures were effective.

At 9: 35, the early warning group (chief dispatcher) reported to the commander-in-chief of flood control and disaster relief, and the danger was lifted.

The commander-in-chief announced that the alarm had been lifted and the drill of flood control emergency plan was successfully completed.

Second, the drill summary

(a), the leadership attaches great importance to, personally observe the command.

The leaders of the County Safety Supervision Bureau and Sinosteel Mining Company attached great importance to the drill, personally watched the whole process of the drill and gave us instructive suggestions. The leaders at all levels of the company performed their duties and fulfilled their duties and tasks well. After the drill, a review meeting was held in the dispatching conference room. Mining companies and company leaders affirmed the drill, but at the same time exposed many shortcomings. The leader's suggestion is very targeted, which promotes the improvement of our company's emergency management level.

(2) The exercise achieved the expected purpose.

1, which tested the smooth operation of our company's flood control emergency system and the ability of coordinated operations among various functional departments. Through the cooperation of flood control work, the cooperative combat capability has been improved, the coordination and linkage mechanism of emergency rescue and the joint disposal mechanism have been strengthened, the emergency disposal capability has been improved, and the scientific, timely and effective emergency disposal has been increased;

2. The rationality and operability of emergency plan, the accuracy and standardization of command and decision, the flexibility and scientificity of flood control emergency dispatch, and the rapid response ability to deal with emergencies have been tested, and the plan system has been improved, and the rigor, pertinence and operability of the plan have been improved;

3. During the whole drill, all persons in charge of the emergency system can be familiar with their respective responsibilities in flood control, which provides valuable practical experience when encountering practical problems;

4. This drill shows that the company is fully prepared for flood control, and the on-site rescue and relief materials are fully prepared and all effective;

5. Through actual participation in flood control drills, all participants are familiar with the flood control process and specific operation plan, so that they can avoid danger in time and put into emergency rescue work in an orderly manner when encountering heavy rainfall in flood season.

(3) Problems existing in this exercise.

1. Because some personnel participated in the flood control drill for the first time, they didn't know enough about the importance of effective cooperation among functional groups, and sometimes they acted in their own way and lacked coordination.

2. frontline workers need to further strengthen their awareness of flood control safety.

3. Although the functional groups have clear responsibilities, they are not skilled enough.

4. The lines in the drill are not clever enough, the atmosphere is not tense enough, and the atmosphere of being busy but not chaotic during evacuation is not achieved.

5. The preparation of the company's emergency plan needs to be further improved to make it more specific and operable.

Summary of emergency plan drill for flood control II

In order to be safe in the flood season, master the protective measures and methods to deal with flood control, minimize the losses caused by flood control, and thus improve the emergency capacity of the school when the flood comes, a flood control drill was conducted on March 10, which is summarized as follows.

First, strengthen organizational leadership and set up leading groups and working groups.

Commander in chief:

Deputy commander:

Members: Other members of the school committee.

This exercise is divided into three groups:

1, the rescue and relief team is responsible for the flood control of the school;

2. The transfer and resettlement team is responsible for the transfer and resettlement of relevant personnel and articles;

3, logistics information flow, responsible for dispatching materials and vehicles, responsible for the management of electricity facilities.

Second, we are ready for the exercise.

Before the drill, shovels, shovels, cement bags and other related items used in flood season were fully equipped, which laid a good foundation for this drill.

Third, do a good job in the work arrangements during the exercise.

1. Whistle as the starting signal before flood season and emergency flood control.

With the emergency ringing, it means that the flood is coming, and the school carries out emergency flood control. The rescue and disaster relief team was immediately in place, cleaned the sewer of the school, let the flood drain smoothly, and simulated that the soil in the cement bag was blocked in the place where the water was easy to run. The relocation and resettlement team immediately simulated the transfer of people and articles that were easily flooded in the school to a safe place. The logistics support immediately reports the disaster to the superior, the relevant vehicles are in place immediately, and all power supplies are turned off immediately to ensure that there is no fire caused by electricity when the flood comes. The whole flood control drill process is organized and planned. Moreover, the whole exercise process is serious. As a real flood prevention, the school leaders made arrangements in advance and personally commanded, which ensured the smooth progress of the exercise and improved the common sense of safety and self-help when the flood came.

2. The smooth completion of the exercise process is mainly manifested in three aspects:

First, smooth information, timely flood forecasting and standardized procedures provide timely and accurate decision-making basis for flood control and emergency rescue.

Second, the early warning response is rapid, the plan system is perfect, and the dispatching command is powerful, which reflects the standardization of flood control work.

Third, the current means are relatively complete, and all links are smoothly connected, which reflects the level of unity and cooperation of all groups.

Through this drill, the school has made more specific arrangements for flood control work, so that when the flood season really comes, the school can save itself safely and minimize the damage.

Summary of flood control emergency plan exercise activities 3

In order to effectively enhance the awareness of flood control and disaster relief of the broad masses of workers, effectively improve the ability of disaster reduction and disaster relief and ensure the safety of the project. In accordance with the policy of "safety first, prevention first and comprehensive treatment", in order to quickly, effectively and orderly respond to major accidents within the scope of our bid section, ensure that when there is a rainstorm within the scope of our bid section, give full play to the safety guarantee mechanism in the shortest time, carry out rescue work quickly, efficiently and orderly, minimize accident losses, reduce casualties and property losses, and ensure the safety of employees, this flood prevention emergency drill is specially launched.

I. Work deployment

This flood control drill is aimed at the evacuation of personnel, office equipment and materials of the project department;

Large-scale mechanical evacuation on site;

Rescue the wounded;

In the practice of eliminating stagnant water, everyone should be responsible according to the specific division of labor, obey the command in a unified way, and complete all the work in a unified time according to the regulations.

Second, exercise time.

From 10:00 to 1 1:00.

Third, the exercise process

At 6:5438+0000 pm on June 26th, the on-site commander Wang Yanhui issued a flood notice, and the drill officially started.

1, evacuation drill of project department

At the beginning of the evacuation drill of the project department, the team members lined up in a row. After the team leader divided the work among the team members, he announced that "the evacuation plan should be implemented immediately". Immediately, the team members went to the tent according to the division of labor, sorted out the materials, computers and printers, and then packed, sealed and loaded;

Personnel also get on the bus and immediately evacuate to Shi Cun for safety according to the No.2 evacuation route. "

2, the wounded rescue drills

At the beginning of the drill, the wounded first walked to the drill position, sat on the ground, held the injured leg position and waited for rescue. After receiving the rescue order, the rescue team immediately ran to the rescue position, and the captain called the emergency center to ask for assistance. The rescue was fixed with a splint, and two boards were placed on the inside and outside of the injured leg.

Fix the upper knee, lower knee, upper fracture, lower fracture and ankle joint with bandages. It is also necessary to keep the toes perpendicular to the calf, and at the same time to protect the fracture site with thick pads;

After simple dressing, 120 ambulance honked its horn and rushed to the rescue site. The injured were put on a stretcher and sent to an ambulance, which drove to the evacuation area of the exercise.

3. Pumping drilling rig

At the beginning of the drill, the team members lifted the water pump to the designated position, the sprinkler drove to the puddle to park, set up a water pipe to start the water pump, and after pumping, the team members dismantled the equipment and got on the bus to evacuate.

4, mechanical equipment evacuation drills

At the beginning of the drill, the team members lined up, and the captain announced to the team members that "the evacuation plan should be implemented immediately and all teams should be prepared." Then each team member goes to his own machinery according to the division of labor and starts the machinery in turn.

Park the first trailer at the designated trailer parking place, and the bulldozer will be commanded by a special person to get on the trailer, and the bulldozer will be fixed after parking on the trailer. After that, the first trailer went to the starting point of the evacuation route and stood by.

Same as above, order rollers and excavators to load.

Before evacuation, all machinery should be loaded and fixed.

Verb (abbreviation of verb) exercise summary

This drill, from the organization, mobilization, sitting command, supervision and guidance of the flood control command and leadership to the mobilization of flood control teams and equipment, was scientifically arranged according to the requirements of the flood control plan. The flood control goal was achieved in the shortest time.

Through this drill, the awareness of flood control and emergency rescue has been improved. All relevant functional departments should be prepared to guard against major floods and seize major risks. It tests the operability and rationality of our flood-fighting emergency plan, the accuracy and standardization of command and decision-making, the flexibility and scientificity of flood-fighting emergency dispatch, and the ability to respond quickly to accidents, and also tests the ability of coordinated operations among functional groups. Through the coordination of flood control work such as scheme formulation, command and dispatch, flood control organization, emergency rescue and logistics support. , which improves the cooperative combat capability among functional groups. All combatants stick to their posts, are disciplined, nervous and orderly, and show high political and professional qualities.

Six, the problems existing in the exercise work

Because some personnel participated in the flood control emergency drill for the first time, they didn't know enough about the importance of effective cooperation among functional groups, and sometimes they went their own way and lacked coordination.

Insufficient machinery and equipment for flood control and emergency rescue. If there is a serious flood, it should be mobilized from the society to increase the efficiency of flood control and emergency rescue.