Lanzhou city high-rise building fire approval procedures for how to handle
Construction engineering fire design fire audit procedures

I. Scope of application

Where in the administrative area of Jimo City within the scope of the new. Alteration. Expansion of the internal decoration of industrial and civil building projects. In addition to the Qingdao Municipal Public Security Fire Bureau audit of the project. Should be applied to my brigade of construction fire design fire audit.

Qingdao Municipal Public Security Fire Bureau audit of the project specifically include:

1. A. B fire hazardous plant. Category B fire hazardous plant. Depot (including yard). Tanks. And class fire hazardous building area of 6000 square meters (the following area refers to the floor area) above the plant. 3000 square meters above the warehouse. Clean plant. High-rise industrial buildings,

2. Second-class automobile gas station. Storage capacity of 100 cubic meters of liquefied petroleum gas station,

3. Storage capacity of more than 5000 tons of flammable. Combustible materials yard,

4. high-rise civil buildings,

5. power plants (stations). Broadcasting. Television center. Postal. Communication hubs and other important projects,

6.5000 square meters above the hotel. Shopping malls. 800 seats above the theater. Auditorium. Gymnasium. 1000 square meters above the dance hall. Indoor amusement. Amusement parks. Nightclubs. Music cafe. Catering establishments. Railroad passenger stations and bus terminals. Wharf. Airport terminal and other public **** building:

7.1000 square meters above the underground works,

8.Scientific research base. Public **** library. Archives. Exhibition halls. Museum,

9. Other fixed should be set up according to the automatic fire-fighting system of the building works.

II. Procedures and materials

(a) unit to the fire department to receive and fill out & lt; building fire design fire audit declaration form & gt;. Before the construction of the table and related materials reported to the fire brigade. Specific materials include:

1. Development Planning Bureau project approval,

2. Jimo Urban and Rural Construction Bureau of the general layout plan,

3. a full set of design drawings and a CD-ROM,

4. fire design chapter. Limited to national. Provincial key projects with automatic fire protection facilities in the building construction,

5. Other materials to be provided.

(ii) the public security fire department on the submission of materials for preliminary review. Qualified to fill in & lt; fire business acceptance notice & gt;. Does not meet the conditions to fill in & lt; fire business not accepted notice & gt;,

(3) public security fire department acceptance. General engineering within 5 working days. With automatic fire protection systems in 10 working days within the construction works issued & lt; building fire design audit fire prevention opinion & gt;.

Construction fire acceptance procedures

I. Scope of application

Where in the administrative area of Jimo City within the scope of the new. Expansion. Alteration and interior decoration of industrial and civil buildings (structures) after the completion of the project. In addition to the Qingdao Municipal Public Security Fire Bureau (Jinhu Road, No. 16) to declare the project. Should be declared to my brigade fire acceptance of construction works.

Two. Submit materials

1.< building fire acceptance declaration form & gt;.

2. Identification of the applicant and contact person. Including the original and copies of personal identity documents. Legal person . Other organizations of the business license or organization code certificate and a copy of the original.

3. Approved by the public security fire department of the construction of building engineering fire design drawings. Completion drawings.

4. Building fire protection facilities (fire products). Fire prevention materials. Electrical testing and other qualified certification. Including product certification. Certification. Inspection report and so on.

5. Decoration materials combustion performance level certificate.

6. Electrical facilities fire safety inspection report.

7. Other materials to be provided.

Three. Application procedures and time limits

1. After the completion of the construction project. Construction units to my brigade to get and fill out & lt; construction fire acceptance declaration form & gt;. Together with the completion of drawings and initial inspection and other technical information. To my brigade for review.

2. Since the date of receipt of the application for acceptance (complete). Should be within 5 working days in accordance with national fire technical standards for fire acceptance. And fire inspection and acceptance within 3 working days after the issuance of qualified or unqualified & lt; building fire acceptance opinion & gt;.