Construction unit Construction unit Design unit Supervision unit Urban Construction Archives
Engineering preparation stage documents
Project document
1 Project proposal is permanent √.
2. The examination and approval opinions of the project proposal and the notice of preliminary work are permanent √.
3 The feasibility study report and its annexes are permanent.
The examination and approval opinions of the feasibility study report are permanent √.
5. Minutes of meetings and leaders' speeches related to project initiation are permanent √.
6. The expert's proposal document is permanent √.
7. Long-term investigation data and project evaluation research materials √.
Construction land, land requisition and demolition documents
1 Notice of site selection application and site selection planning opinion is permanent √.
2. The land application report and the approval letter of the people's government at or above the county level for urban and rural construction land are permanent √.
3 demolition and resettlement opinions, agreements, plans, etc. It's been a long time.
4. The construction land planning permit and its attachments are permanent.
5. Allocated construction land files are permanently √.
6 The state-owned land use certificate is permanent.
3. Survey, mapping and design documents
1 engineering geological investigation report is permanent √.
2. Hydrogeological survey report, natural conditions and earthquake survey are permanent √.
3. Construction land nail notice (book) permanent √.
4. Topographic survey and geodetic survey results report permanently √.
5. The declared planning and design conditions and the Notice of Planning and Design Conditions are permanent and long-term √.
6. Preliminary design drawings and descriptions of long-term and long-term.
7 Long-term technical design drawings and descriptions
8. Long-term and long-term notice of design scheme approval and review opinions √.
Approval documents or relevant agreements obtained by relevant administrative departments (civil air defense, environmental protection, fire protection, transportation, gardens, municipal administration, cultural relics, communication, safety, rivers and lakes, education, termite control, health, etc.). ). Permanent √.
10 construction drawing and its description long-term long-term
1 1 Long-term design calculation
12 The approval opinions of relevant government departments on construction drawing design documents are permanent and long-term √.
4. Bidding documents
1 long-term survey and design bidding documents
2 Long-term long-term survey and design contract √
3 Long-term construction bidding documents
4. Long-term and long-term construction contracts √
5 Project Long-term supervision bidding Document
6 Long-term supervision entrustment contract √
5. Construction approval document
1 The application documents for construction projects included in the annual plan are permanent √.
2. The construction project is permanently included in the annual approval document or annual plan list.
3 planning approval declaration form and submitted documents and drawings are permanent.
4 The construction project planning permit and its attachments are permanent √.
5 Construction Project Commencement Review Form Permanent
6. Permanent construction permit for construction project √.
7 investment license, audit certificate, payment of greening construction fee and other certificates for a long time √.
8 Long-term project quality supervision procedures √
6. Financial documents
1 Short-term project investment estimation materials
2. Short-term engineering design budget materials
3 short-term construction drawing budget materials
4 short-term construction budget
7. Construction, construction and supervision institutions and responsible persons.
1 List of project management organization (project management department) and long-term responsible person √.
2. Long-term list of project supervision institutions (project supervision department) and responsible persons.
3. Long-term list of project construction management organization (construction project management department) and responsible person √.
Supervision document
1 supervision planning
(1) Long-term and short-term regulatory planning √.
(2) Long-term and short-term implementation rules of supervision √.
(3) The long-term and short-term control plan of the supervision department.
2. Long-term quality problems in monthly supervision report √.
3. Long-term quality problems in minutes of supervision meeting √.
4 schedule control
(1) Long-term and long-term approval form for project start-up and resumption of work √.
(2) Long-term suspension of project start/resumption √.
5 quality control
(1) Long-term notice of nonconformity √.
(2) Long-term quality accident report and handling opinions √.
6 cost control
(1) Advance payment submission and short-term payment
(2) Monthly payment approval and short-term payment
(3) The design change, negotiation fee, examination and approval, and signing time are long.
(4) Long-term √ audit opinion on final accounts of project completion
7 Subcontracting qualification
(1) long-term subcontractor qualification materials
(2) Long-term qualified materials of suppliers
(3) Long-term qualification materials of testing and other units.
eight
(1) long-term progress control supervision notice
(2) the supervision of long-term quality control notice
(3) Long-term notice of supervision on cost control
9 management of contracts and other matters
(1) Project extension report and approval of permanent long-term √.
(2) Expense reimbursement report and long-term approval
(3) Contract disputes, default reports and handling opinions are permanent and long-term √.
(4) Long-term and long-term contract change materials √.
10 supervision work summary
(1) short-term and long-term summary
(2) Long-term and short-term monthly summary.
(3) Long-term summary of project completion √.
(4) Long-term and long-term quality evaluation opinion report √.
construction document
1. Construction and installation works
Civil engineering (architecture and structure)
1 construction technical preparation documents
(1) Long-term construction organization design
(2) Long-term technical disclosure
(3) Record the blue prints.the design for a long time √.
(4) The preparation and review of the construction budget is short-term.
(5) Short-term short-term construction log
2 Construction site preparation
(1) Long-term long-term setting data of control network √.
(2) Long-term and long-term project positioning measurement data √.
(3) Long-term and long-term measurement data of foundation trench excavation line √.
(4) Short-term and short-term construction safety measures
(5) Construction short-term environmental protection measures
3 foundation treatment records
(1) Basic drilling and exploration records and drilling and exploration layout are permanent and long-term √.
(2) Records of trench inspection and foundation treatment √ Permanent and long-term.
(3) Permanent and long-term pile foundation construction records √.
(4) Long-term long-term records of test piles √.
4 engineering drawings change record
(1) Design meeting joint review record permanent long-term long-term √.
(2) The design change record is permanent, long-term and long-term √.
(3) The negotiation record of the project is permanent and long √.
5 quality certificate and retest test report of prefabricated building materials
(1) Summary Table for Long-term Tests of Sand, Stone, Brick, Cement, Steel Bar, Waterproof Material, Thermal Insulation, Anticorrosive Material and Lightweight Aggregate √.
(2) Long-term factory certification documents of sand, stone, brick, cement, steel bar, waterproof material, heat preservation and anti-corrosion material and lightweight aggregate √.
(3) Long-term retest test report of sand, stone, brick, cement, steel bar, waterproof material, lightweight aggregate, covered electrode and asphalt √.
(4) Long-term factory certificates and test records of prefabricated components (steel and concrete)
(5) The selection and submission form of engineering material samples is short-term.
(6) Short-term summary of incoming batches
(7) Short-term Inspection Sheet for Engineering Materials' Entry
6 construction test records
(1) Long-term dry density test report of soil (plain soil and lime soil) √.
(2) Long-term compaction test report of soil (plain soil and lime soil)
(3) notice of long-term mortar mixture ratio
(4) Long-term compressive strength test report of mortar (test block)
(5) Notice of Long-term Concrete Mix Ratio
(6) Long-term compressive strength test report of concrete (test block)
(7) Long-term impermeability test report of concrete √.
(8) Long-term factory certificate and retest report of commercial concrete.
(9) Long-term test report of reinforced joint (welding) √.
(10) Long-term water testing and inspection records of waterproof engineering
(1 1) Long-term slope inspection records of bottom plate and top plate.
(12) Summary of long-term impermeability test report of soil, mortar, concrete, steel bar connection and concrete √.
7 concealed engineering inspection records
(1) Long-term and long-term reinforcement works of foundation and main structure √.
(2) Long-term and long-term steel structure engineering √.
(3) Long-term and long-term waterproof works √.
(4) Long-term elevation control
8 construction records
(1) The inspection records of engineering positioning survey are permanent and long-term √.
(2) Short-term inspection records of the preview project
(3) The record of concrete mixing temperature measurement in winter is short-term.
(4) The temperature measurement record of concrete curing in winter is short-term.
(5) Short-term inspection records of flue and garbage passage
(6) Long-term settlement observation record √.
(7) Long-term records of structural hoisting
(8) Long-term record of on-site construction prestress √.
(9) Long-term and long-term measurement of project completion √.
(10) Long-term and long-term of new building materials √.
(1 1) Long-term construction of new technologies √.
9 engineering quality accident treatment record permanent √.
10 engineering quality inspection record
(1) Long-term and long-term inspection batch quality acceptance record
(2) Long-term, long-term and long-term faceted engineering quality acceptance records
(3) The acceptance records of foundation and main works are permanent and long-term √.
(4) The curtain wall project acceptance record shall be permanently ticked for a long time.
(5) Division (sub-division) project quality acceptance record is permanent and long-term √.
(two) electrical, water supply and drainage, fire protection, heating, ventilation, air conditioning, gas, building intelligence, elevator engineering.
1 general construction records
(1) Long-term and long-term construction organization design
(2) Short-term technical disclosure
(3) Short-term construction log
2 drawings change record
(1) Permanent and long-term blue prints.the design √.
(2) Permanent and long-term design changes √.
(3) Permanent long-term project negotiation √.
3 Equipment and product quality inspection and installation records
(1) Long-term long-term quality certificate and quality guarantee for equipment and products √.
(2) Equipment packing list, commodity inspection certificate and instructions, and long-term unpacking report.
(3) Long-term installation record of equipment √.
(4) Long-term record of equipment debugging √.
(5) Long-term long-term equipment list √.
4. Short-term preview records
5 take cover engineering long-term inspection records
6 construction test records
(1) Long-term test records of electrical grounding resistance, insulation resistance, integrated wiring and cable TV terminal √.
(2) Long-term debugging records of building automation, monitoring, installation, audio-visual and telephone systems √.
(3) Long-term records of installation, inspection, electrification and full-load test of power transformation and distribution equipment √.
(4) Long-term test records of water supply and drainage, fire protection, heating, ventilation, air conditioning, gas and other pipelines, such as strength, tightness, irrigation, ventilation, purging, air leakage, pressure test, ball passing, valves, etc.
(5) Long-term commissioning and trial operation records of elevator lighting, power, water supply and drainage, fire protection, heating, ventilation, air conditioning, gas and other systems √.
(6) Test records of elevator grounding resistance and insulation resistance; No-load, half-load, full-load and overload commissioning records; Long-term balance, speed and noise adjustment test report √.
(7) Quality accident handling records are permanent and long-term √.
(8) Engineering quality inspection records
(1) Long-term and long-term inspection batch quality acceptance record
(2) Long-term, long-term and long-term quality acceptance records of subdivisional work
(3) Division (sub-division) project quality acceptance record is permanent and long-term √.
(3) Outdoor engineering
1 Long-term construction documents for outdoor installation (water supply, rainwater, sewage, heat, gas, telecommunications, electric power, lighting, television, fire protection, etc.). )
2. Long-term construction documents of room polonium building environment (architectural sketches, waterscape, roads, landscaping, etc.). )
Municipal infrastructure projects
(A) the construction technology preparation
1 Short-term short-term construction organization design
2 Long-term technical disclosure
3 drawings will record long-term long-term √.
4. Short-term construction budget preparation and audit.
(2) Construction site preparation
1 Long-term survey data of the project √
2. Long-term and long-term review records of engineering positioning measurement √.
3 traverse points, leveling points measurement review record for a long time.
4. Long-term and long-term inspection records of engineering axis, positioning piles and elevation measurement √.
5 short-term short-term construction safety measures
6. Construction environmental protection measures are divided into short-term and short-term.
(three) design changes, negotiation records
1 design change notice long-term long-term √
2 Long-term negotiation record √.
(4) Ex-factory quality certificates and test reports of raw materials, finished products, semi-finished products, components and equipment.
1 test summary table of sand, stone, block, cement, steel bar (material), lime, asphalt, paint, concrete admixture, waterproof material, bonding material, anti-corrosion insulation material, welding material, etc. It's been a long time.
2 sand, stone, block, cement, steel bar (material), lime, asphalt, paint, concrete admixture, waterproof material, bonding material, anti-corrosion insulation material, welding material and other quality certificates and factory inspection (test) report and on-site long-term re-inspection report.
3 mixture of cement, lime and fly ash; Summary table for long-term test of asphalt mixture and commercial concrete √.
4 mixture of cement, lime and fly ash; Asphalt mixture, commercial concrete and other factory certificates and test reports, on-site re-inspection report for a long time √.
5. Summary Table for Long-term Tests of Precast Concrete Members, Pipes, Pipe Fittings and Steel Structure Members √.
6. Long-term quality certificates of precast concrete members, pipes, pipe fittings and steel structure members and corresponding construction technical data √.
7. Summary table of complete sets of equipment, prestressed concrete tensioning equipment, various underground pipeline well facilities and products that have been used for plant and station projects for a long time √.
8 Factory certificates and installation instructions for complete sets of equipment, prestressed concrete tensioning equipment, various underground pipeline well facilities and products in the plant and station project are long-term √.
9 Short-term equipment unpacking report
(5) Construction test records
1 Summary table of mortar, concrete block strength, welded connection of reinforcement (material), filling, long-term strength test of subgrade, etc.
2 road compaction, strength test records
(1) Long-term report on compaction test of backfill soil and subgrade and test of maximum dry density and optimum water content of soil √.
(2) Long-term standard compaction test report of lime, cement and lime-fly ash inorganic mixture base √.
(3) Long-term record of road base mixture strength test √.
(4) Long-term records of pavement compaction test √.
3 concrete block strength test record
(1) Short-term notice of concrete mixture ratio
(2) Long-term strength test report of concrete block √.
(3) Long-term impermeability and frost resistance test report of concrete test block √.
(4) Long-term statistics and evaluation records of concrete block strength √.
4 mortar block strength test record
(1) Short-term notice of mortar mixture ratio
(2) Long-term strength test report of mortar test block √.
(3) Long-term statistics and evaluation records of mortar test block strength √.
5 Long-term welding and connection test report of steel (material) √.
6. Long-term appearance quality inspection records of steel pipe and steel structure installation and weld treatment.
7 Long-term test (inspection) report of pile foundation √.
8. Short-term records of sample selection and submission of engineering materials
9. Short-term summary records of incoming material batches
10 short-term entry inspection record of engineering materials
(6) Construction records
1 Acceptance record of foundation and foundation trench
(1) Long-term and long-term optical fiber probe records and drilling probe location map
(2) Long-term and long-term acceptance records of foundation and foundation trench √.
(3) Long-term and long-term foundation treatment records and schematic diagrams √.
2 pile foundation construction records
(1) Long-term plan of pile foundation position √.
(2) Long-term piling record √.
(3) Long-term and long-term records of quality inspection of bored piles.
(4) Long-term and long-term concrete pouring records of bored (excavated) piles √.
3 record of installation and debugging of sub-item equipment
(1) Long-term and long-term hoisting records of large precast reinforced concrete members and steel structures.
(2) Long-term installation and debugging records of large-scale equipment in factory (field) and station engineering √.
4 prestressed tensioning record
(1) Long-term prestress tensioning record √.
(2) Long-term record of prestressed tensioning tunnel grouting √.
(3) Schematic diagram of long-term well location √.
5 Long-term subsidence observation record of open caisson engineering √.
6 Long-term concrete pouring record
7. Long-term filing of pipeline, box culvert and other engineering projects.
8 Long-term settlement observation records of buildings √.
9 Construction long-term temperature measurement record
10 Long-term stress measurement record of steel wire wound on prefabricated installation pool wallboard √.
(7) Pre-inspection records
1 template short-term preview record
The pre-inspection records of large components and equipment before installation are short-term.
3 Short-term inspection record of equipment installation position
4 pipeline installation short-term inspection records
5 compensator cold drawing and installation short-term record
6 (hanging) frame position, connection mode of each part and other inspection records are short-term.
7 Short-term records of water supply, heat supply and gas supply pipeline blowing (flushing).
8 short-term construction inspection records of heat preservation, anticorrosion and painting.
(eight) take cover engineering long-term inspection (acceptance) records.
(9) Engineering quality inspection and evaluation records
1 long-term process engineering quality evaluation record
2. Long-term evaluation records of some engineering quality.
3. Long-term quality evaluation records of branch projects √.
(10) function test record
1 Long-term deflection test record of road engineering √.
2. Long-term records of static and dynamic load tests of bridge engineering √.
3 Long-term leak test record of pressureless pipeline √.
4. Record the strength test, leak test and passing test of pressure pipeline for a long time.
5 pool full of water for a long time test √.
6 Long-term air tightness test of digester √.
7 Electrical long-term insulation resistance and grounding resistance test record √.
8 Long-term records of electric lighting and power supply debugging √.
9 Long-term commissioning records of heating pipe network and gas pipe network.
10 long-term overall test record of gas storage tank √.
1 1 Long-term debugging record of telecommunication and broadband network √.
(eleven) quality accidents and handling records
1 Project quality accident report is permanent and long-term √.
2. The handling record of engineering quality accidents is permanently long √.
(12) completion survey data
1 Building and structure completion survey records and survey schematic diagram permanent long-term √.
2. The measurement record of underground pipeline project completion is permanent and long-term.
Record drawings
1. Construction and installation project completion drawing
(1) Comprehensive as-built drawing
1 comprehensive drawing √
(1) General layout (including architecture, architectural sketches, waterscape, lighting, roads, greening, etc. ) permanent and long-term √.
(2) Permanent long-term vertical layout √.
(3) Outdoor water supply, drainage, heating, gas and other pipe network comprehensive map permanent long-term √.
(4) Electrical (including electric power, telecommunications, television systems, etc.). ) The comprehensive map is permanent and long-term.
(5) The general design specification is permanent and long-term.
2 Long-term outdoor professional map
(1) Permanent long-term outdoor water supply √.
(2) Outdoor rain is permanent and long-term √.
(3) Outdoor sewage is permanently √.
(4) Outdoor thermal power time is long √.
(5) Permanent long-term use of outdoor gas √.
(6) Outdoor telecommunications are permanent and long-term √.
(7) Outdoor power supply is permanent and long-term √.
(8) Outdoor TV is permanent.
(9) Sketching of outdoor buildings is permanent and long-term.
(10) Outdoor fire fighting for a long time √.
(1 1) Permanent outdoor lighting √.
(12) Outdoor waterscape is permanent and long √.
(13) Outdoor roads are permanent √.
(14) Permanent long-term outdoor greening √.
(2) Professional as-built drawings
1 permanent long-term as-built drawings √
2. The structural completion drawing is permanent, with a length of √.
3 decoration (decoration) project completion figure permanent long-term √.
4 Electrical engineering (intelligent engineering) as-built drawings are permanent and long-term √.
5. The completion drawing of water supply and drainage works (fire fighting works) is permanent and long-term.
6. Completion drawing of HVAC project √ Permanent and long-term
7. The completion drawing of gas project is permanently long √.
2. Completion drawing of municipal infrastructure project
1 permanent long-term road works √.
2 Permanent long-term bridge works √.
3. The square project is permanent and long-term.
4 Permanent long-term tunnel works √.
5. Railway, highway, aviation, water transport and other transportation projects are permanent and long-term.
6 subway and other rail transit projects are permanent and long-term √.
7. Permanent and long-term civil air defense works √.
8. Permanent long-term water conservancy disaster prevention project √.
9 Permanent long-term drainage works √.
10 underground pipeline projects such as water supply, heat supply, gas supply, electricity and telecommunications are permanent and long-term √.
1 1 permanent long-term of high-voltage overhead transmission line project √.
12 permanent long-term sewage treatment and garbage disposal project √.
13 permanent long-term works of yard, factory and station √.
Completion acceptance document
Project completion summary
1 project summary table is permanent √.
2. Project completion summary is permanent √.
2. Completion acceptance record
(1) Construction and installation works
1 unit (sub-unit) project quality acceptance record permanent long-term √.
2. The completion acceptance certificate is permanent and long-term √.
3. The completion acceptance report is permanent and long-term √.
4 Completion acceptance record (including all special acceptance approval documents) is permanent √.
5. The project quality warranty is permanent and long-term.
(2) Municipal infrastructure projects
1 unit project quality evaluation form and inspection sheet are permanent and long-term √.
2. The completion acceptance certificate is permanent and long-term √.
3. The completion acceptance report is permanent and long-term √.
4. The completion acceptance record (including all special acceptance approval documents) is permanent and long-term √.
5. The project quality warranty is permanent and long-term.
3. Financial documents
1 The final settlement document is permanent √.
2. The property summary and list delivered for use are permanent and long-term √.
Audio-visual, microform and electronic documents
1 audio-visual files
(1) Engineering photos are permanently √.
(2) Audio and video materials are permanently √.
2 Microfilms are permanent.
3 electronic documents
(1) CD permanently √.
(2) The disk is permanent.