Current location - Recipe Complete Network - Catering training - How to fill in the construction data sheet of Jiangsu construction project?
How to fill in the construction data sheet of Jiangsu construction project?
You can choose TXT first, or download the source file to this machine for viewing.

An example of filling in the construction data sheet of construction projects in Jiangsu Province

1 Chapter Construction Data of Building and Structural Engineering

List of construction management personnel of civil construction data engineering survey project Construction site quality management inspection record Construction organization design, construction scheme approval form technical disclosure record Commencement report Project completion report, summary table of the blue prints.the design, design change and negotiation record.

The blue prints.the design, design changes, negotiation records, design disclosure records, engineering positioning measurement, setting-out acceptance records, steel certificate and retest report summary table, cement factory certificate, retest report summary table, brick (block) inspection report summary table, factory inspection report and approach reinspection report summary table.

Summary of waterproof and thermal insulation material certificate and retest report (other) Building material certificate and retest report summary of concrete test block pressure test report summary of concrete strength evaluation of structural entity concrete strength evaluation of mortar strength summary evaluation table

Reinforcement connection test report, covered electrode (agent) certificate summary table geotechnical test record summary table concealed engineering acceptance record construction log on-site construction prestress record foundation groove inspection record and foundation treatment record concrete (other) component certificate summary table.

Steel protective layer thickness measurement table Roof splashing, spraying and water storage test records basement waterproof effect inspection records bathroom, kitchen, balcony and other waterproof ground splashing and water storage test records building verticality, elevation and total height measurement records.

Flue gas (wind) engineering acceptance records and building settlement observation records

Unit (sub-unit) engineering quality completion acceptance record Unit (sub-unit) engineering safety and function inspection data verification and main function spot check record Unit (sub-unit) engineering visual quality inspection record Division (sub-division) engineering acceptance record.

Sub-project quality acceptance record Earthwork excavation sub-project inspection lot quality acceptance record Earthwork backfilling sub-project inspection lot quality acceptance record concrete sheet pile making sub-project inspection lot quality acceptance record bolt and soil nailing wall supporting sub-project inspection lot quality acceptance record

Steel or concrete support system subentry project inspection batch quality acceptance record underground continuous wall subentry project inspection batch quality acceptance record open caisson (box) subentry project inspection batch quality acceptance record lime soil foundation subentry project inspection batch quality acceptance record sandstone foundation subentry project inspection batch quality acceptance record.

Quality acceptance record of geosynthetic foundation sub-inspection lot quality acceptance record of fly ash foundation sub-inspection lot quality acceptance record of dynamic compaction foundation sub-inspection lot quality acceptance record of grouting foundation sub-inspection lot quality acceptance record of preloading foundation sub-inspection lot quality acceptance record

Quality acceptance record of inspection lot of vibroflotation foundation subdivisional work 1 quality acceptance record of inspection lot of high-pressure jet grouting foundation subdivisional work; quality acceptance record of inspection lot of cement-soil mixing pile foundation subdivisional work

Quality acceptance record of inspection lot of sub-project of soil and lime-soil compaction pile composite foundation; Quality acceptance record of inspection lot of subentry project of cement fly ash gravel pile composite foundation; Tamping the quality acceptance records of the inspection lot of the sub-project of cement-soil pile composite foundation; Sand pile foundation subentry project inspection batch quality acceptance record

Template component project (cast-in-place structure template installation) inspection batch quality acceptance record template component project (template removal) inspection batch quality acceptance record steel component project (raw materials, steel processing) inspection batch quality acceptance record steel component project (steel bar connection, steel bar installation) inspection batch quality acceptance record.

Quality acceptance record of inspection lot of concrete subdivisional work (raw materials, mix proportion design) Quality acceptance record of inspection lot of concrete subdivisional work (concrete construction) Quality acceptance record of inspection lot of cast-in-place structure subdivisional work (structural construction) Quality acceptance record of inspection lot of cast-in-place structure subdivisional work (equipment foundation)

Brick masonry subdivisional work inspection batch quality acceptance record waterproof concrete subdivisional work inspection batch quality acceptance record

Cement mortar waterproof layer subentry project inspection batch quality acceptance record coiled material waterproof layer subentry project inspection batch quality acceptance record

Quality acceptance record of inspection lot of coating waterproof layer sub-project plastic waterproof layer sub-project inspection lot quality acceptance record of metal waterproof layer sub-project inspection lot quality acceptance record of waterproof concrete detail structure sub-project inspection lot quality acceptance record

Quality acceptance record of inspection lot of anchor and shotcrete waterproof subdivisional work; Composite lining waterproof subdivisional work inspection batch quality acceptance record; Quality acceptance record of inspection lot of waterproof subentry project of shield tunnel.

Leakage drainage and blind ditch drainage subdivisional work inspection batch quality acceptance records; Pre-grouting, post-grouting, lining crack grouting sub-project inspection lot quality acceptance records; Template subdivisional work (cast-in-place structure template installation) inspection batch quality acceptance record.

Template subdivisional work (prefabricated template installation) inspection batch quality acceptance record Template subdivisional work (template removal) inspection batch quality acceptance record Steel subdivisional work (raw materials, steel processing) inspection batch quality acceptance record Steel subdivisional work (steel bar connection, steel bar installation) inspection batch quality acceptance record.

Prestressed subdivisional work (raw materials) inspection lot quality acceptance record of prestressed subdivisional work (production and installation) inspection lot quality acceptance record of prestressed subdivisional work (tensioning and releasing, grouting and anchoring) inspection lot quality acceptance record of prefabricated structure subdivisional work (prefabricated components) inspection lot quality acceptance record

Assembled structure subdivisional work (structural construction) inspection batch quality acceptance record of concrete small hollow block masonry subdivisional work inspection batch quality acceptance record of stone masonry subdivisional work inspection batch quality acceptance record of reinforced masonry subdivisional work inspection batch quality acceptance record

Filling wall masonry subentry project inspection lot quality acceptance record of square wood and log subentry project (component production) inspection lot quality acceptance record of square wood and log structure subentry project (structural installation) inspection lot quality acceptance record of light wood structure subentry project inspection lot quality acceptance record

Quality acceptance record of inspection lot for sub-projects of wood structure protection: quality acceptance record of inspection lot for sub-projects of concrete cushion, slag cushion and cement concrete cushion: quality acceptance record of inspection lot for sub-projects of mortar and concrete leveling layer: quality acceptance record of inspection lot for sub-projects of isolation layer and filling layer.

Quality acceptance records of inspection lot of subentry project of cement concrete surface and cement mortar surface; Quality acceptance records of the inspection lot for the subdivisional works of terrazzo surface and cement steel (iron) chip surface; Quality acceptance record of inspection lot of subentry works of oil-proof surface and misfire (explosion-proof) surface.

Brick surface subentry project inspection batch quality acceptance record Marble surface and granite surface subentry project inspection batch quality acceptance record.

Quality acceptance record of inspection lot for precast slab surface, sub-project materials, stone surface and plastic surface, sub-project inspection lot quality acceptance record of sub-project inspection lot for raised floor and carpet surface, quality acceptance record of sub-project inspection lot for solid wood floor surface and solid wood composite floor surface.

General plastering subdivisional work inspection lot quality acceptance record decorative plastering subdivisional work inspection lot quality acceptance record fair-faced masonry jointing subdivisional work inspection lot quality acceptance record wooden doors and windows making subdivisional work inspection lot quality acceptance record wooden doors and windows installation subdivisional work inspection lot quality acceptance record.

Metal doors and windows installation subdivisional work (steel doors and windows) inspection batch quality acceptance record metal doors and windows installation subdivisional work (aluminum alloy doors and windows) inspection batch quality acceptance record metal doors and windows installation subdivisional work (galvanized steel doors and windows)

Plastic doors and windows installation subdivisional work inspection lot quality acceptance record Special door installation subdivisional work (push-pull automatic door) inspection lot quality acceptance record Special door installation subdivisional work (revolving door) inspection lot quality acceptance record Door window glass installation subdivisional work inspection lot quality acceptance record

Hidden keel ceiling subdivisional work inspection lot quality acceptance record Ming keel ceiling subdivisional work inspection lot quality acceptance record plate partition subdivisional work inspection lot quality acceptance record skeleton partition subdivisional work inspection lot quality acceptance record movable partition partition wall subdivisional work inspection lot quality acceptance record.

Glass partition subdivisional work inspection lot quality acceptance record veneer installation subdivisional work inspection lot quality acceptance record tile pasting subdivisional work (galvanized steel doors and windows painting) inspection lot quality acceptance record water-based coating finishing subdivisional work inspection lot quality acceptance record.

Solvent-based coating finishing subdivisional work inspection batch quality acceptance record; Paste the quality acceptance record of the inspection lot of subdivisional work; Soft package subdivisional work inspection batch quality acceptance record; Quality acceptance records of cabinet production and installation sub-projects

Door and window cover manufacturing installation subdivisional work inspection batch quality acceptance record; Guardrail, handrail production and installation subdivisional work inspection batch quality acceptance records; Ornamental design production and installation subdivisional work inspection batch quality acceptance record; Roof division engineering quality acceptance record.

Roof leveling layer subentry project inspection batch quality acceptance record of roof insulation layer subentry project inspection batch quality acceptance record

Coil waterproof layer subentry project inspection batch quality acceptance record roofing leveling layer subentry project inspection batch quality acceptance record

Roof insulation coating waterproof layer inspection lot subentry project quality acceptance record of fine stone concrete waterproof layer inspection lot subentry project quality acceptance record of sealing material sealing subentry project quality acceptance record

Quality acceptance record of flat tile roof sub-inspection lot quality acceptance record of linoleum tile roof sub-inspection lot quality acceptance record of sheet metal roof sub-inspection lot detailed structure sub-inspection lot quality acceptance record of overhead roof, water storage roof and planting roof sub-inspection lot quality acceptance record.

Overview of pile foundation engineering construction data Pile foundation engineering survey, positioning and setting-out record, joint review of drawings, design change and negotiation record Pile foundation engineering commencement report Pile foundation engineering completion report Pile position measurement record Pile foundation engineering quality control data checklist.

Precast pile (steel pile) entry acceptance record Precast pile (steel pile, commercial concrete and pile head) certificate summary table Precast pile connection concealed acceptance record Steel pile connection construction acceptance record Precast pile, steel pile construction (hammering) acceptance record Manual digging pile construction acceptance record

Construction acceptance record of bored pile with mud retaining wall; Acceptance record of hammer sinking cast-in-place pile construction; Acceptance record of reinforcing cage construction; Construction record of underwater concrete of cast-in-place pile; Summary of steel certificate and retest report; Summary of steel welding test report.

Covered electrode (agent) certificate summary table sand, stone, admixture, admixture factory certificate, retest report summary table cement factory certificate, retest report summary table concrete mixture ratio inspection record concrete block pressure test report summary table concrete strength grade evaluation table.

Precast concrete pile subdivisional work inspection batch quality acceptance record

Quality Acceptance Record of Reinforced Cage Inspection Lot of Concrete Cast-in-place Pile in Steel Pile Sub-project

Quality acceptance record of inspection lot of concrete cast-in-place pile subentry project test pile foundation quality acceptance record of static pressure pile subentry project quality acceptance record of pretensioned prestressed pipe pile subentry project inspection lot quality acceptance record

Construction data of steel structure engineering: Summary of drawings review, design change and negotiation records of steel structure engineering. Records of the blue prints.the design, design change and negotiation are the examination and approval records of construction organization design, construction scheme and technical disclosure, construction records and baking records of welding materials.

Welder certificate summary table steel structure engineering quality control data checklist witness inspection items related to safety and function inspection inspection records steel structure engineering perception quality inspection records quality certificate, inspection report and retest report summary table.

Steel member approach acceptance record summary steel member approach acceptance record summary steel member certificate inspection record summary other inspection items inspection report and concealed work inspection acceptance record summary concealed work inspection acceptance record summary steel structure sub-project quality acceptance record.

Steel member welding quality acceptance record subentry project inspection lot quality acceptance record steel structure welding nail welding subentry project inspection lot quality acceptance record steel structure (common fastener connection) subentry project inspection lot quality acceptance record steel structure (high-strength bolt) subentry project inspection lot quality acceptance record steel structure (component processing) subentry project inspection lot quality acceptance record steel structure assembly quality acceptance record related allowable deviation inspection record of subentry project inspection lot.

Quality acceptance record of inspection lot of steel component pre-assembly subentry project; Single-layer steel structure installation subdivisional work inspection batch quality acceptance record.

Single-layer steel structure installation subdivisional work related allowable deviation inspection records Multi-layer and high-rise steel structure installation subdivisional work inspection batch quality acceptance records

Multi-storey and high-rise steel structure installation component project quality acceptance allowable deviation inspection records; Inspection records of allowable deviation of inspection lot of steel structure grid structure installation subdivisional work.

Quality acceptance record of profiled steel sheet installation sub-project inspection lot Relevant allowable deviation record of profiled steel sheet installation sub-project inspection lot Quality acceptance record of steel member (anticorrosive coating) sub-project inspection lot

Steel component (fire retardant coating) subentry project inspection lot quality acceptance record curtain wall project construction data building curtain wall project overview technical disclosure record design disclosure (the blue prints.the design) record.

Design change, negotiation record summary curtain wall engineering visual quality inspection record curtain wall engineering quality control data and main function test report checklist aluminum alloy material product certificate, performance test report summary table curtain wall steel and hardware (gasket) product certificate, performance test report summary table.

Curtain wall plate (glass, metal plate, stone) certificate, performance test report summary table insulation fireproof material certificate, performance test report summary table silicone adhesive quality certificate for curtain wall, performance test report summary table curtain wall embedded parts (rear embedded parts) construction concealment acceptance record.

Concealed acceptance record of component connection node curtain wall deformation joint, concealed acceptance record of node structure at corner of wall surface curtain wall fire protection structure concealed acceptance record of curtain wall lightning protection device concealed acceptance record of curtain wall subentry project quality acceptance record of glass curtain wall subentry project quality acceptance record.

Open-frame glass curtain wall sub-project inspection lot quality acceptance record hidden frame and semi-hidden frame glass curtain wall sub-project inspection lot quality acceptance record metal curtain wall sub-project inspection lot quality acceptance record stone curtain wall sub-project quality acceptance record

Quality Acceptance Record of Inspection Lot of Stone Curtain Wall Sub-project Chapter II Construction Data of Building Water Supply and Drainage and Heating Engineering Summary Table of Construction Site Quality Management Records of Building Water Supply and Drainage and Heating Engineering

Construction water supply, drainage and heating division engineering quality acceptance record

Inspection records of quality control data of building water supply and drainage and heating engineering; Inspection records of visual quality of building water supply and drainage and heating engineering.

Equipment entry acceptance record pipeline engineering concealed acceptance record pipeline support and hanger installation record pipeline welding inspection record floor (roof) riser hole water retention test record steel pipe expansion device pre-stretching installation record plastic drainage pipeline expansion device installation reserved expansion amount record.

Equipment foundation handover acceptance record pipeline insulation record single machine commissioning record boiler drying record boiler boiling record water pressure test record pressure pipeline system (equipment) strength and rigorous water pressure test record before valve and radiator installation.

Non-pressure pipeline irrigation test record water supply, hot water and heating pipeline system flushing record sanitary ware full water test record floor drain drainage test record indoor drainage pipeline passing ball test record drainage system and sanitary ware full water test record open water tank full water test record

Fire hydrant system test record heating system commissioning and debugging record safety valve and alarm linkage system action test record indoor water supply system division engineering quality acceptance record water supply pipeline and fittings installation inspection lot quality acceptance record.

Indoor fire hydrant system installation inspection lot quality acceptance record water supply equipment installation inspection lot quality acceptance record indoor drainage system installation sub-project quality acceptance record indoor drainage pipeline and accessories installation sub-project quality acceptance record indoor rainwater pipeline and accessories installation inspection lot quality acceptance record.

Indoor hot water supply system installation division project quality acceptance record indoor hot water pipes and fittings installation division project inspection lot quality acceptance record indoor hot water auxiliary equipment installation division project inspection lot quality acceptance record sanitary ware installation division project quality acceptance record.

Sanitary Ware Installation Engineering Inspection Lot Quality Acceptance Record

Sanitary ware water supply fittings installation inspection batch quality acceptance record sanitary ware drainage pipe installation subentry project quality acceptance record

Indoor heating system subentry project quality acceptance record Indoor heating system water pipes and fittings installation inspection lot quality acceptance record Indoor heating system accessory equipment and radiator installation subentry project quality acceptance record Indoor heating system metal radiant panel installation project quality inspection lot quality acceptance record

Quality acceptance record of sub-inspection lot for installation of low-temperature water floor radiant heating system; water pressure test and commissioning of indoor heating system; quality acceptance record of outdoor water supply pipeline installation inspection lot; quality acceptance record of fire pump adapter; quality acceptance record of outdoor fire hydrant installation inspection lot.

Outdoor water supply pipe trench and well chamber installation inspection lot quality acceptance record outdoor drainage pipe installation inspection lot quality acceptance record outdoor drainage pipe trench and well pool installation inspection lot quality acceptance record outdoor heating pipe network pipeline and accessories installation inspection lot quality acceptance record.

Water pressure test and debugging of outdoor heating pipe network pipeline system Quality acceptance record of inspection lot for installation of reclaimed water system and swimming pool system in building.

Quality acceptance record of inspection lot of swimming pool water system installation project; Quality acceptance record of inspection lot of heating boiler and auxiliary equipment installation division; Quality acceptance record of inspection lot of boiler installation project; Quality acceptance record of inspection lot for boiler auxiliary equipment and pipeline installation project.

Quality acceptance record of inspection lot of boiler safety accessories installation projectNo. of inspection lot quality acceptance record of boiler baking, boiling and debugging heat exchange station installation sub-project

The third chapter building electrical engineering construction data building electrical engineering construction site quality management records building electrical division engineering quality acceptance records electrical lighting installation division engineering quality acceptance records (unified table 1) subentry engineering quality acceptance records (unified table)

2) Building electrical engineering quality control data verification records Building electrical engineering safety and function inspection data verification and main function spot check records Building electrical engineering visual quality inspection records Equipment, materials and instruments approach acceptance records.

And inspection (test) report summary table trough, electric conduit installation hidden acceptance record repeated grounding (lightning protection grounding) project hidden acceptance record lightning protection grounding system layout wiring laying construction hidden acceptance record.

Process handover test acceptance record Electrical equipment handover test record Circuit (equipment) insulation resistance test record

Circuit grounding resistance test record, socket and switch grounding test record, building lighting electrification, full-load trial operation record, large-scale lamps firmness test record, overhead line and pole electrical equipment installation sub-project quality acceptance record, transformer and box-type substation installation sub-project quality acceptance record.

Quality acceptance record of inspection lot of trough plate wiring subdivisional work; Cable wiring subdivisional work inspection batch quality acceptance record; Lightning rod subdivisional work inspection batch quality acceptance record Chapter IV Ventilation and air conditioning engineering construction data

Overview of Ventilation and Air-conditioning Engineering Quality Management Records of Construction Site Ventilation and Air-conditioning Division Engineering Quality Acceptance Records Ventilation and Air-conditioning Engineering Quality Control Data Verification Records Ventilation and Air-conditioning Engineering Safety and Function Inspection Data Verification Records and Main Function Spot Check Records

Ventilation and air conditioning visual quality acceptance inspection record equipment entry acceptance record equipment foundation acceptance record concealed engineering acceptance record fan coil hydraulic test inspection record duct strength inspection record duct system air leakage inspection record field assembly dust collector and air conditioning unit air leakage inspection record.

Check and record the pipeline strength (air tightness) of water system; record the flushing (blowing) cleaning of air-conditioning water system pipeline and refrigerant pipeline; record the water flow test of condensate pipeline; record the air tightness test of refrigeration system; record the air duct cleaning of purification air-conditioning system; record the single-machine debugging of equipment.

Valve test record ventilation and air conditioning sub-division engineering quality acceptance record sub-division engineering quality acceptance record air duct (metal air duct) and accessories manufacturing inspection lot quality acceptance record air duct (nonmetal and composite air duct) and accessories manufacturing inspection lot quality acceptance record.

Quality acceptance record of inspection lot for production and installation of silencing equipment

Air duct (air supply, exhaust, smoke exhaust) system installation inspection batch quality acceptance record; Quality acceptance record of inspection lot for fan and air handling equipment installation; Quality acceptance record of anticorrosion inspection lot for air duct and equipment.

System debugging inspection lot quality acceptance record ventilation and air conditioning sub-division engineering quality acceptance record duct parts manufacturing inspection lot quality acceptance record exhaust pipe and normally closed positive pressure ventilation pipe installation inspection lot quality acceptance record ventilation and air conditioning sub-division engineering quality acceptance record.

Dust collector and sewage equipment installation inspection batch quality acceptance record; Air duct and equipment insulation inspection batch quality acceptance record; Quality acceptance records of ventilation and air conditioning sub-projects; Air duct (air conditioning system) system installation inspection batch quality acceptance record; Quality acceptance records of ventilation and air conditioning sub-projects

Quality acceptance record of inspection lot for installation of air duct (purified air conditioning system) High-efficiency filter installation sub-project inspection lot quality acceptance record of ventilation and air conditioning equipment (purified air conditioning system) installation inspection lot quality acceptance record of refrigeration unit installation sub-project inspection lot quality acceptance record of refrigerant pipeline and accessories installation sub-project inspection lot quality acceptance record.

Quality Acceptance Record of Inspection Lot for Installation of Refrigeration Accessory Equipment Ventilation and Air Conditioning Sub-project Quality Acceptance Record of Inspection Lot for Installation of Air Conditioning Water System (metal pipeline) Quality Acceptance Record of Inspection Lot for Installation of Air Conditioning Water System (non-metal pipeline)

Quality acceptance record of condensate system (metal pipeline) installation inspection batch Quality acceptance record of condensate system (non-metal pipeline) installation inspection batch Quality acceptance record of valves and components installation inspection batch Quality acceptance record of cooling tower installation inspection batch

Quality Acceptance Record of Inspection Lot for Manufacturing and Installation of Mufflers for Water Pumps and Auxiliary Equipment Chapter V Construction Data of Elevator Engineering Quality Acceptance Record of Elevator Division

Elevator Engineering Quality Control Data Checklist Elevator Engineering Appearance Quality Inspection Record Equipment Unpacking Inspection Record Elevator Engineering Concealed Acceptance Record Line (Equipment) Insulation Resistance Test Record Grounding Resistance Test Record Elevator Engineering Load Test and Safety Device Inspection Record.

Quality Acceptance Record of Electric Drive Traction or Forced Elevator Division Project

Equipment entry acceptance record electric drive main engine, hydraulic elevator hydraulic system sub-project quality acceptance record guide rail sub-project quality acceptance record door system sub-project quality acceptance record car (counterweight) and safety component sub-project quality acceptance record.

Suspension device, accompanying cable, compensation device (traction, compulsory) subentry project quality acceptance record electrical device subentry project quality acceptance record electric elevator machine installation subentry project quality acceptance record hydraulic elevator subentry project quality acceptance record.

Quality acceptance record of hydraulic elevator suspension device and accompanying cable sub-project quality acceptance record of hydraulic elevator whole machine installation sub-project quality acceptance record of escalator and moving sidewalk installation sub-project quality acceptance record of escalator and moving sidewalk equipment entry quality acceptance record.

Civil handover and acceptance records of escalators and moving sidewalks; Installation and acceptance records of the whole escalator and moving sidewalk; Chapter VI Building Energy Conservation Engineering Information; Summary of building energy-saving projects.

Construction energy-saving branch project quality control data verification record construction energy-saving branch project raw materials (equipment) certificate and test report summary table energy-saving project quality acceptance record polystyrene board external insulation system wall energy-saving project inspection lot/insulation slurry system wall energy-saving project inspection lot subentry project quality acceptance table polyurethane foam external insulation system wall energy-saving project inspection lot subentry project quality acceptance table external insulation system wall energy-saving project inspection lot/subentry project quality acceptance table.

Wall self-insulation system wall energy-saving project inspection lot/subentry project quality acceptance form curtain wall energy-saving project inspection lot/subentry project quality acceptance form

Door and window energy-saving project inspection lot/subentry project quality acceptance form Roof energy-saving project inspection lot/subentry project quality acceptance form

Ground energy-saving project inspection lot/subentry project quality acceptance form heating energy-saving project inspection lot/subentry project quality acceptance form

Ventilation and air conditioning energy-saving project inspection lot/subentry project quality acceptance record; Air conditioning and heating system cold and heat sources and pipe network energy-saving project inspection lot/subentry project quality acceptance record; Power distribution and lighting energy-saving project inspection lot/subentry project quality acceptance table Monitoring energy-saving project inspection lot/subentry project quality acceptance table.

Chapter VII Household Acceptance Data

Household acceptance summary of residential engineering quality Household acceptance and rectification summary Indoor floor, wall, ceiling plastering, door and window engineering quality Household acceptance record Indoor space size, guardrail, glass quality Household acceptance record Waterproof engineering and public parts.

Quality record of household acceptance of installation project