Current location - Recipe Complete Network - Catering training - Regulation of Jinshui River in Zhengzhou City
Regulation of Jinshui River in Zhengzhou City
By 20 15, the main way to control Jinshui River is to control water, that is, to prevent flooding. At this time, there is no overall planning and design scheme. During the recent 20 years from 1958 to 1976, the river course was mainly regulated, that is, it was built according to flood control projects. At this time, there is no overall planning and design scheme: during the period of 1978 ~ 1994, comprehensive management is the main task, and local planning and design are carried out at this time, lacking overall design. There has been a general planning goal since 1994. The riverside park planned and designed this time starts from Jinhai Reservoir and goes down to Jincheng Road (Bali Temple), with a total length of14.8km and a total of 8 scenic spots, named "Jinshui Yu Lian". Generally speaking, the planning and design of this riverside park is a perfect scheme, but it needs to be further improved. Due to the lack of long-term awareness in Zhengzhou urban planning, it brings a lot of inconvenience to the development and construction of Jinshui River, especially repeated investment. Repeated sewage interception costs more than 50 million yuan, but by 199 1 year ago, there were still 103 sewage outlets discharging sewage to Jinshui River along the river bank and along the open ditch of cotton mill. 1997 to 1998, 28 sewage outlets from Huaihe Road of Jinshui River to Zhuangyan Bridge were intercepted, and the middle and upper reaches were basically intercepted. However, there is still a lot of sewage and waste water in the open ditch of the cotton mill in the 4.5-kilometer Jinshui River basin. The sewage interception project under Zhuangyan Bridge has not yet been implemented, and factories far from Jinshui River sometimes discharge sewage into Hanoi through rainwater pipes. Pollution interception is still a difficult point in the future development and construction of Jinshui River. It took about 60 million yuan for land acquisition and demolition, but the two sides of the river have not yet been demarcated. "Clear water, bright scenery, evergreen scenery and beautiful scenery" is the construction goal of Jinshuihe Riverside Park. However, Zhengzhou did not draw the "red line" on both sides of Jinshui River in the planning, which led to a construction, a land acquisition and a number of building demolition. From 1978, in the Jinshui River construction project, the cost of land acquisition and demolition is about 60 million yuan, but there are still many places in the middle and upper reaches of the river that lack development space (the narrowest part is only 1 meter), and the land acquisition and demolition work below the Zhuang Yan Bridge has not been implemented, so it is very difficult to achieve the goal of "land boundary"; Riverside Park has a beautiful name "Jinshui Yu Lian", but the buildings on both sides of the river have affected the overall beautification of Jinshui River. The appearance quality of buildings is poor, and there is air pollution, such as boiler room chimneys and coal plants. The walls on both sides of the river are uneven, and institutions, schools, hotels, hotels, residential quarters and other units along the river set up different walls for their own needs, and the appearance quality is extremely poor, which does not conform to the general trend of "tearing down the walls and showing the green" in Zhengzhou; All kinds of pipelines along the banks of the river are exposed, which affects the landscape and the safety of tourists.