Current location - Recipe Complete Network - Catering training - How to put out the fire in the chess room with an area of more than 500 on the first floor?
How to put out the fire in the chess room with an area of more than 500 on the first floor?
As a special construction project, an application for fire protection design review should be made, and the design should be carried out in accordance with the Code for Fire Protection Design of Buildings and Code for Fire Protection Design of Interior Decoration of Buildings, mainly including fire resistance rating, fire separation, safe evacuation, fire extinguishers, indoor fire hydrants, automatic sprinkler systems, automatic fire alarm systems, smoke control and exhaust systems, emergency lighting systems for evacuation instructions, decoration fire prevention, electrical fire prevention and so on. Apply for fire control acceptance after completion. Before putting it into use and business, establish and improve the responsibility for fire safety, apply for fire safety inspection to the fire rescue agency of the local people's government at or above the county level, promise that the place meets the technical standards and management regulations for fire control, submit the required materials, and be responsible for the authenticity of its promises and materials.

Fire design audit, fire acceptance and public gathering places put into use, fire safety inspection before opening. You can check the service guide at the local government service network or the administrative examination and approval center, and apply online or on site.