Summary of personal work of electric power construction personnel
Summary of personal work of electric power construction personnel

The development of personal work summary of electric power construction workers can make electric power construction workers constantly analyze the development of the industry and understand the future development trend of electric power. The following is a summary of the personal work of the electric construction workers I recommend to you. I hope you will learn something.

Chapter 1: Overview of individual work of power construction workers 1. Relay protection setting (10kv and below).

XX year 10 month, due to the shortage of original setting personnel in the company, I assisted the company in setting relay protection for 10kv distribution lines (including capacitors) and 10kv subscriber stations. From the beginning of work, I have established relay protection setting files, such as system impedance table, branch impedance diagram, system station setting list summary table (branch line) and user station setting list summary table (branch line). In recent two years, the setting and auditing of the outgoing line setting value of the newly-built 35kv substation have been completed. There is no false setting phenomenon, and the calculation of system short-circuit capacity provides a basis for the selection of distribution line switches and other equipment. At the end of XX, due to the change of institutional setup, the junior technicians were instructed to set the fixed value and successfully completed the handover.

Second, strengthen the professional management of line loss.

As the line loss personnel of the branch company, they have mainly done the following work: completing the microcomputer-based line loss statistical calculation, using the line loss calculation statistical program to input the table code, automatically generating the line loss report, analyzing the bus balance, presiding over the theoretical line loss calculation, using the theoretical line loss calculation program to compile the line loss parameter diagram, compiling the line loss extension network node, inputting it into the microcomputer, and completing the theoretical line loss calculation of 35kv and 10 kv lines.

Line loss planning, XX annual loss reduction implementation plan, monthly, quarterly and annual line loss analysis, actively take technical measures to reduce line loss, complete the operation of two 35kv stations 10kv capacitors, and complete the cutting and transformation of circuitous lines, overload, large power supply radius and small wires.

Third, participate in power grid construction and transformation.

Since March XX, I have participated in the capacity expansion and replacement of main transformers 10kv vacuum switches in two 35kv substations in Xiashan, Zhanjiang. At present, as an assistant, I cooperate with leaders in the whole process construction of suburban1110kV substation, participate in the overhaul and reconstruction of five 35kv lines such as Xiashan, cooperate with the rural power grid 10kv line reconstruction project, and gradually get familiar with the equipment and workflow in my work, and assist in the completion of project establishment, substation construction and compilation of feasibility report for transmission line reconstruction. Participating in the project quality acceptance and data sorting work has improved the power supply capacity, met the needs of economic operation, reduced line loss, improved the power supply reliability and power quality, met the requirements of economic development for electric power, and achieved good economic and social benefits.

Fourth, boldly participate in professional operation management and participate in the formulation of professional management system.

I am good at writing because I studied liberal arts before. The unit leader learned that I was transferred to cooperate with the improvement and revision of the participation system. Comprises a power supply equipment maintenance management system; Measures for the administration of technical transformation and overhaul projects; Detailed rules for the implementation of the Measures for the Administration of Fixed Assets; Power supply equipment defect management system; Operational analysis system; Provisions on the management of outsourcing projects; Regular production meeting system; Line and substation maintenance inspection system; Measures for the management and reward of technological progress; Scientific and technological progress and rationalization proposal management system; Detailed rules for the implementation of technical supervision, management and assessment; Presided over the compilation of the basic system of power distribution management in power supply stations. Participate in formulating production management standards, including: voltage and reactive power management standards; Line loss management standard; Management standards for economic activity analysis; Management standards for the whole process of equipment; Presided over the formulation of professional management responsibility system: line operation professional work management network and personnel responsibility system at all levels; Professional work management network and personnel responsibility system for transformers at all levels; Lightning protection management responsibility system; Work management network and personnel responsibility system at all levels of cable operation specialty; Detailed rules for implementation of transformer countermeasures. Actively carry out seasonal work, and arrange and deploy annual energy-saving work for important festivals and major political activities. The development of these works has effectively promoted the safe and stable operation of the power grid.

Five, to carry out science and technology management.

At work, I try to use computers in management to improve work efficiency and management level. 1. Use the fixed assets statistics application program to complete the transportation of the fixed assets of the company, and complete the work of adding, changing, scrapping and depreciating the fixed assets. The second is to complete the statistical analysis of technical transformation (including heavy measures and general technical measures) by applying the statistical program of technical transformation in Tianjin. Third, assist the development and application of geographical information system of the branch company, organize the input of distribution line parameters and operation data, and form a line database. The fourth is to assist in the pilot work of installing automatic reclosing (1 12# line) on distribution lines, so as to form an automatic fault judgment barrier, improve the reliability of power supply, and make a beneficial attempt for the automation of distribution lines. In addition, from September of XX to February of 12, the electric construction budget of urban network reconstruction project was compiled and reviewed according to the quota.

In short, in the professional and technical work in recent years, I have done some practical work in production practice by using the professional and technical knowledge I have learned, and I have a certain technical work ability, but there are still some shortcomings. In my future work, I will strengthen my study, overcome my shortcomings and strive to continuously improve my professional and technical level.

Chapter II: Summary of Personal Work of Electric Power Construction Workers As a grass-roots electrician, I have always adhered to the principle of "obeying leaders, uniting comrades, studying hard and working hard", adhering to high standards and strict requirements, and successfully completed various tasks.

I put learning in an important position and strive to improve my overall quality. In terms of political study, by studying the spirit of Deng Xiaoping Theory, Theory of Three Represents and Scientific Outlook on Development, especially the 17th National Congress, we have further improved our ideological consciousness and political insight, and firmly established the purpose of serving the people wholeheartedly and a correct world outlook, outlook on life and values.

I. Work done and achievements made in 20xx years

In my 20xx years of work, I insist on strict demands on myself, strengthen my image, improve my own quality, do my job well, treat others sincerely, love my job and pay attention to dedication. Have a correct understanding of your work and value, correctly handle the relationship between bitterness and pleasure, gain and loss, personal interests and collective interests, and adhere to professionalism, integrity and dedication.

In the first half of the year, in the production team, with the concerted efforts of all the production team members, Qi Xin completed the XX distribution transformer test and cleared the XX10 kV line channel. Under the condition of tight load, newly install No.4 public transformer in # Changzhen, deal with the oil leakage of No.2 transformer in # Changzhen, and make emergency repairs for the rest:10kv65××××109 # pole. In addition, under the arrangement of the director, the basic data of a8 system has been entered.

At the end of July, I was transferred to the window because of work needs. After arriving at the window, I stood on my own responsibility and tried my best to provide quality service. Earnestly fulfill the "Ten Commitments" of power supply service of State Grid Corporation, and there is no negligence in fault repair and business development. This year, when I met various activities and meetings, I actively cooperated with my colleagues to do a good job in service. I thought wholeheartedly and did wholeheartedly, no matter how much I did, I only hoped to complete the work successfully.

Second, the shortcomings in the work and the direction of future efforts

Although some achievements have been made in the past year, there are still some shortcomings, mainly because there is still a certain gap between the proficiency of business handling and experienced colleagues, the materials are still wandering in the basic format, and the content lacks the extension of in-depth excavation. In my future work, I will conscientiously sum up my experience, overcome my shortcomings and strive to do better. I will continue to carry forward the spirit of hard work. Be diligent in eyes, mouth, hands and legs, actively adapt to all kinds of difficult environments, hone your will and increase your talents in heavy work. Carry forward the tireless enterprising spirit. Strengthen study, be brave in practice, read widely, pay attention to collecting all kinds of information while learning from books, and absorb all kinds of "nutrition" extensively; At the same time, pay attention to learning methods, correct learning attitude, improve learning efficiency, strive to cultivate their solid theoretical foundation, dialectical thinking method, correct ideas and practical work style, and strive to do a better job.

3. Ideas and suggestions on power supply work

(1) Suggestions on improving the enthusiasm of power supply. It is suggested to establish an annual target responsibility system for power supply stations, improve various reward and punishment incentive mechanisms, encourage everyone to actively put forward reasonable suggestions, reward the advanced and spur the backward through the reward and punishment incentive mechanism, further strengthen the management of power supply stations and better serve power customers.

(2) Suggestions on enhancing the cohesion of power supply. Power supply station is a complete whole, production, marketing and window can not be separated, and everyone can communicate with each other. In addition, the power supply station can also use its leisure time to carry out collective public welfare activities.

In short, over the past year, I have done some work and made some achievements, but there are still many gaps from the requirements of the leaders: mainly, my sense of work innovation is not strong and my creativity is not enough. In the future work, I will carry forward my achievements, overcome my shortcomings, do all the work in a down-to-earth and conscientious manner with a highly responsible attitude towards my work and career, and live up to everyone's expectations.

Chapter 3: Summary of personal work of electric power construction personnel: When the New Year bell is about to ring, bid farewell to the old and welcome the new; Looking back on the work of the past year is not only a memory of the hard work of the past year, but also a blessing for the bright future of the next year. In the past year, I am proud that I am an electrical worker and can do what I should do for my beloved substation operation post. In the past year, I actively responded to all the work carried out by the company and the work area, and strived to realize the implementation of all the work; Now I will report my personal work in 20XX to the leaders as follows:

1. Insist on learning business theory and be proactive.

At the beginning of the year, after arranging "skills training" in the work area, I was able to actively seize the opportunity and strive to improve my business according to the intention of the leaders. During the period, I not only mingled with my colleagues, but also humbly asked and learned from my colleagues. I also asked the teachers a lot of operational problems that are rarely seen at ordinary times. The teachers' answers impressed me deeply and I have been successfully practiced and demonstrated in my actual work. I actively participated in the study and assessment of safety laws and regulations organized by the Ministry of Safety, and truly took the policy of "safety first, prevention first and comprehensive management" as a magic weapon to prevent "habitual illegal production accidents".

Resolutely carry out the instructions of superiors and strive to complete the tasks assigned by superiors.

In the past year, I didn't bargain about the tasks assigned by the leaders, didn't shrink in the quality of work, and didn't mix the idea of poor task execution in my work. Although at the end of September, in order to "welcome the provincial and municipal working groups to our company for inspection and guidance", the osmanthus tree was inadvertently lit, and the leaders of the work area handled this "incident" fairly and fairly with a broad mind, which deeply touched me. More importantly, I repay the affirmation and trust of the leaders in the work area with more full work enthusiasm.

According to the work arranged by the work area in a year, I can work diligently, seriously and diligently. He has successively completed the "Four Ones" study of team management, the "All Questions" activity throughout the year, and the "Comprehensive Automation Transformation of Equipment" at the end of the year, and completed 4 personal reading review notes and 8 personal learning experience notes.

3. A strong sense of work responsibility is closely related to the sense of collective honor.

On May 30, 2009, during the handling of the accident of "A-phase CT breakdown of switch 04 in Wulong Line", I kept in touch with the superior leaders by telephone in strict accordance with the requirements of "two votes" and "three systems", and handled this incident which is likely to lead to major accidents step by step. Summing up the incident afterwards, I think strict implementation of rules and regulations is a magic weapon to prevent accidents in production safety.

Over the past year, I have put an end to the operation and work without tickets, checked the initial audit of "two tickets", insisted on participating in weekly safety activities, and carefully studied accident notification and safety briefing to learn from them. At the same time, according to my changing actual situation, make personal training plan, strengthen safety technical training, and improve personal safety awareness and professional quality. I also carry out special inspections on the equipment according to the season, load, major festivals and the spirit of instructions from superior leaders. Strengthen equipment inspection. Conduct timely and comprehensive inspection of equipment; All the work is strict, meticulous and pragmatic. It has truly changed the disadvantages of "laziness, slowness and slowness" in previous work, and ensured the realization of the annual safety goal of safe operation of equipment without accidents.

4. Strengthen the study of the spirit of the 17th National Congress of the Communist Party of China, and strive to improve personal political quality and consciousness.

As an ordinary party member in China, I can listen to and watch radio and television in time during the victory of the 17th National Congress. Ideologically, it is highly consistent with the CPC Central Committee. After the closing of the meeting, I carefully understood the spirit of the 17th National Congress. I feel doubly happy and encouraged for our party's next work center "building a well-off socialist society".

In the past year; I abide by party constitution, actively pay party dues according to the requirements of the branch, and conduct democratic appraisal on the leaders in my work area. And can actively participate in the organizational life carried out by the branch.

;