For new sites:
1, whether the materials used in the site and the technological requirements of the decoration company for this project are consistent with the site;
2, the scene of the decoration materials, necessary facilities (such as fire prevention, etc. ) Finish 3
3. How is the communication between workers? Is there a temporary decoration team? Communicate with workers at the construction site (remember that it is a worker, not a foreman) and pay attention to the quality of workers.
Concealed engineering construction site:
1, see whether the embedded circuit is clean and tidy, and whether the interval is fixed according to the specification (normal 50 cm);
2. Pinch the hardness of the pipe by hand, whether it can be pinched, and whether the PVC joint and the fixing piece are fastened;
3. For the junction box, take one and step on it to see if it can be crushed, because the junction box is a hidden place where the owner needs to change the switch directly in the future, and the quality is important;
4, for the wooden keel ceiling, a look at whether the coating of fire retardant coating is uniform, and secondly, whether the keel frame is fastened and the density interval of hanger bars;
5. For waterway reconstruction, the easiest place for decoration companies to cut corners is to steal columns from the joints. A good connector is n times more expensive than a pipe, and the quality of the connector directly affects the water supply, because that is the place with the highest water pressure, and a bad connector is prone to problems. ?
Site under construction:
1, mixed oil method, whether the joiner with super-long veneer has chamfer seam, some people say it is the problem of the painter's scribing seam, I think it is the carpenter's, and the painter scribbles with a knife, which is not deep enough and the opening is not enough, so it is easy to spit white in the future;
2. Whether the over-long dumb splicing is reinforced laterally;
3. Pinch the strength of the bricklayer's cement sand paddle by hand, whether there is a level around the bricklayer, whether there is adhesive tape, whether the level is used for decoration or often used in this construction, and see if there is a wet cement seal on it;
4, check the site construction drawings, whether it can be constructed according to the original drawings, whether it can be displayed on the drawings;
5. Observe whether the staffing of half the construction site is reasonable, the cleanliness of the current site, and the stacking of the remaining odds and ends. ?
About later websites:
1, check whether it is consistent with the design drawings and the overall impression. First, determine whether there is a tacit understanding between designers and workers.
2. Woodworking angle, whether the workmanship of Yin and Yang angles is smooth, whether the seams are neat, whether the materials in the same cabinet are appropriate (whether the patterns are consistent), and whether the seams are neat!
3. Oil workers should pay attention to whether the paint spraying is uniform, whether there is irregular reflection (which can be traced back to the use of materials), whether the putty at the grass-roots level (oily and water-based) is uniform, whether there is any omission in polishing (you can check the sense of responsibility), and the most easily forgotten place is on the wooden sleeve. Has the oiler polished it (touch it with your hand to see if there is burr and light)!
4. The bricklayer's point of view: find two tools at the construction site, one is two meters feet and the other is a square ruler. Feel whether the gap is neat first, and then check the verticality and flatness of the brick with a ruler. The smaller the error rate, the better. The national standard is 2MM. Check whether the brick at the corner of Yin and Yang is square, whether the grinding angle of wall brick is neat, and whether the hollowing rate of wall and floor tile is less than 5%.
Finally, synthesize the overall effect of what you have done and see if some places belonging to the two types of work are coordinated. ?