According to Article 32 of the Regulations on Quality Management of Construction Projects:
1. Failure to perform legal construction procedures, fraud in tendering and bidding, subcontracting, illegal subcontracting, failure to perform contractual agreements, etc., disrupting the normal order of the construction market. In this regard, our province will implement normal supervision of the construction market, and investigate and deal with the behaviors of the construction unit that does not have the construction conditions, forcing the contractor to sign a "yin-yang contract", and constructing without obtaining a construction permit.
2. Among them, the bidding will be stopped and the bidding results will be abolished for those who do not meet the procedures. The illegal start of the project should be ordered to stop, and recorded in the record of bad behavior.
3. In addition, if the construction unit arbitrarily reduces the construction period and project cost, and the survey, design, construction, supervision and other units fail to carry out the construction as agreed in the contract, it shall be ordered to correct, reduce or revoke the qualification certificate within a time limit and be fined, and also recorded in the bad behavior record.
Extended information:
According to Article 11 of the Regulations on Reporting, Investigation and Handling of Production Safety Accidents, after receiving the accident report, the supervision and administration department of production safety and the relevant departments responsible for the supervision and administration of production safety shall report the accident according to the following provisions and notify the public security organs, the administrative department of labor security, the trade union and the people's procuratorate: < p
second, the construction process of construction enterprises is fluid. Every construction project and installation project undertaken by a construction enterprise must be carried out at the location designated by the customer, so the construction enterprise must be transferred with the transfer of the location of the contracted project.
Third, construction and installation personnel and construction machinery and equipment must flow in all construction sites, which requires reasonable arrangement of construction personnel, full mobilization of their enthusiasm, and attention to the management of construction machinery and equipment and materials.