Future City Phase IV, after experiencing the illegal appropriation of funds and the suspension of work for 1 years, was ushered in to resume work under the national policy of protecting education buildings, but the progress was slow and the effect was not good. Recently, the owner found that the developer was suspected of arbitrarily changing the construction plan and drawings with the consent of the owner. The obvious points are as follows:
1. The renovation fee of about 3,111 yuan/square meter charged by the developer includes the shared area. And the decoration cost and the unit price of the house are lower than that of the fourth phase, and the corridors of the 1, 2 and 3 phases are all bricked.
2. At present, the atrium design and greening in the residential area, and the laying materials of the atrium fire escape are obviously inconsistent with the sand table and design renderings displayed when buying a house; Either it is suspected of false propaganda and cheating consumers, or it is suspected of illegally changing the design. The owner requires that the building should be built according to the sand table and renderings when buying a house. It is not allowed to cut corners or reduce allocation, and it is necessary to complete the construction of the community with good quality and quantity.
The above places are actually seen, and others are obvious to others. I don't know how many are left, which is really difficult to reassure buyers. I hope that the regulatory authorities will really fulfill their regulatory obligations and find out and verify them as soon as possible; Relevant units will publicize the construction drawings and related construction information to the owners, ease the owners' worries, and give the owners a satisfactory answer, so as to create a residential area with good quality and quantity.