Current location - Recipe Complete Network - Catering training - How to do a good job in technical fire prevention management of high-rise buildings in use?
How to do a good job in technical fire prevention management of high-rise buildings in use?
1. It is forbidden to use flammable and combustible external wall insulation materials in violation of regulations.

2. Set fire control facilities according to the fire control technical specifications, and do a good job of maintenance.

3. It is strictly prohibited to conduct open flame operations such as electric welding and gas welding on the external wall of the building in violation of regulations.

4. Enter the high-rise building and observe the evacuation passage.

5. It is strictly prohibited to park electric vehicles and pile up sundries in evacuation stairs and walkways.

6. Property, community and other units regularly carry out fire inspection and organize escape drills.

7. Regularly check and maintain electrical lines and gas pipelines to eliminate fire hazards in time.