What is the second-level filing process of fire protection in Pingshan District, Shenzhen? What information do you need to prepare?
Before the public gathering place is put into use or opened for business, its owner shall declare the fire safety inspection to the public security fire control institutions in accordance with the law, and submit the application form for fire safety inspection, the audit opinions on fire protection design of construction projects, the fire inspection opinions of construction projects, the fire safety management system and other related materials. From the date of acceptance, the personnel of public security fire control institutions shall conduct on-site inspection within four working days, and make and deliver fire safety inspection opinions within three working days from the date of inspection. Agree to put it into use or start business if it meets the fire safety conditions; If it does not meet the fire safety conditions, it shall put forward rectification opinions, and the owner shall make rectification according to the requirements put forward by the fire safety inspection opinions until it meets the fire safety conditions and can be put into use or opened after passing the inspection by the fire control institutions.

Materials to be prepared for fire control procedures

Step 1: Fire fighting construction and inspection information

1。 Floor plan, stamped with the design qualification seal of the decoration unit;

2。 Record Form for Fire Protection Design of Building Engineering

3。 A copy of the industrial and commercial business license or industrial and commercial approval name;

4。 Design qualification certification documents;

5。 A copy of the applicant's power of attorney and the client's ID card.

6。 Audit declaration form

7。 A copy of the fire control acceptance opinion of the building project (the building after 98 years);

8。 A copy of the house lease contract;

Step 2: Fire Control Acceptance Data

1。 Project completion acceptance report;

2。 Fire Protection Record Form for Completion Acceptance of Construction Project

3。 Inspection report on fire-fighting products (fire extinguishers, emergency lighting, safety evacuation signs, fire-fighting facilities, electrical appliances, fire-fighting products and decoration materials);

4。 Legal identity certificates and qualification certificates of construction, supervision and testing units;

5。 As-built drawing;

6。 Acceptance declaration form;

7。 A copy of the applicant's power of attorney and the client's ID card.

8。 Employee fire protection training certificate;

9。 Four indicators of capacity building

The third step is fire inspection.

1。 Fire safety inspection declaration form;

2。 A copy of the business license issued by the administrative department for industry and commerce or a notice of pre-approval of the enterprise name;

3。 Copies of legal documents obtained in accordance with the law for fire control acceptance or filing of construction projects;

4。 Fire safety system, fire fighting and emergency evacuation plan;

5。 Records of pre-job fire safety education and training for employees and copies of professional qualification certificates for special types of work in the fire protection industry obtained by operators of automatic fire protection systems;

6。 A copy of the applicant's power of attorney and the client's ID card.