Sample machine lease contract 1
Lessee: (hereinafter referred to as Party A)
Lessor: (hereinafter referred to as Party B)
According to the Contract Law of People's Republic of China (PRC) and relevant regulations, in order to clarify the rights and obligations of both parties to equipment leasing, Party A leases Party B's construction machinery (attached table) according to the needs of the project, and through friendly negotiation, Party A and Party B sign the following agreement on machinery leasing for both parties to abide by.
1. Vehicle type: (see attached table)
2. Leased place of use:
Third, the lease term:
When Party B receives the telephone notification from Party A, the lease period shall be counted from the date when the mechanical equipment arrives at the site designated by Party A until Party A formally notifies Party B to leave the site. If Party B fails to leave the venue within the time limit specified in the notice for any reason, the rental fee will not be calculated.
Four, mechanical equipment lease form and settlement method:
1. Party B rents the machinery and equipment to Party A on a monthly basis, with the monthly rent of RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. Party B shall be responsible for the freight generated by the machinery and equipment during the lease period;
3. Rent settlement method: In principle, Party A will settle the rent for Party B on 25th of each month and pay the rent of last month before 5th of next month. If the funds allocated by Party A's superiors or owners are not in place, Party B fully understands the difficulties of Party A's funds and agrees to relatively delay the payment; If Party A needs to add more machinery and equipment, the price and cost of the added machinery and equipment shall be the same as the provisions of this contract;
4. Party B shall be equipped with qualified drivers, hold valid local operation certificates and stand by 24 hours to ensure the construction needs of Party A. Party B shall be responsible for the accommodation, wages and meals of drivers.
Verb (abbreviation for verb) Rights and obligations of both parties.
1. During the lease period of machinery and equipment, Party B's mechanical driver shall obey the work arrangement of Party A. Because Party B's driver does not obey the arrangement of Party A, Party A has the right to request a replacement of the driver and terminate the contract. Drivers are fully responsible for their own safety in mechanical equipment and operation. Operate in strict accordance with the operating rules of mechanical equipment, and do not operate in violation of regulations, otherwise all safety accidents caused thereby shall be borne by Party B at its own expense;
2. Party B is responsible for the maintenance, maintenance, fuel and auxiliary oil of mechanical equipment and their corresponding expenses. The intact rate shall be no less than 28 days per month, and if it is less than one day, one day shall be deducted from the monthly rent to ensure the normal construction of Party A;
3. Party A shall provide the construction site and ensure a good construction environment. Party B agrees that the construction site and environment provided by Party A can meet the operating conditions of mechanical equipment;
4. All formalities (certificate of conformity, technical inspection certificate, etc.) must be handled for the mechanical equipment provided by Party B for Party A.. ). Party B shall be responsible for all the responsibilities such as being detained by local authorities due to incomplete procedures of machinery and equipment;
5. Party B's mechanical equipment shall be neat in appearance, with good technical performance and normal operation to meet the construction needs. When mechanical equipment breaks down and Party B cannot repair it within the specified time, it shall take measures in advance to ensure the normal construction of Party A's project;
6. The mechanical equipment managers and drivers of Party B must obey the management of Party A and strictly abide by the management system of Party A;
7. Party A has no right to sublet, auction or mortgage Party B's equipment.
Liability for breach of contract of intransitive verbs:
Both parties must strictly implement the terms of this contract. Without the consent of the other party, neither party may change or terminate the contract halfway. If either party violates the provisions of this contract, it will be responsible for compensating the other party for all losses caused thereby;
2. All disputes related to this contract shall be settled by both parties through friendly negotiation in accordance with the relevant provisions of the Contract Law and other relevant laws;
3. This contract is made in triplicate, with Party A holding two copies and Party B holding one copy, which shall come into effect as of the date of signing, and each copy has the same legal effect. After the mechanical equipment exits and is settled, the contract will automatically become invalid.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Machine Lease Contract Sample 2
Party A (lessee):
Party B (Lessor):
According to the Contract Law of People's Republic of China (PRC), the following agreement is reached on Party A's lease of equipment to Party B through negotiation:
A, equipment use location and engineering survey
Two. Overview of leased equipment
Three. Ownership of the leased equipment: the ownership of the leased equipment listed in this contract belongs to the lessor, and the lessee has the right to use the leased machinery in the place where the equipment is used and within the company's engineering scope during the lease period.
Four. Basic duties of Party A
1. Provide accommodation for Party B's pilots.
2. Party A is responsible for keeping the equipment on the construction site, and Party A shall compensate for the damage or loss of the equipment caused by Party A. ..
3. Party A shall not direct Party B's operators to operate illegally. Otherwise, Party A shall bear the consequences for the safety of Party B's personnel.
Verb (abbreviation of verb) Basic duties of Party B.
1. Provide equipment with good technical performance.
2. After the equipment enters the construction site of Party A, Party B's mechanic shall obey the dispatch and command of Party A's construction site management personnel and abide by the rules and regulations of Party A's construction site. Otherwise, Party A has the right to ask Party B to adjust the operator.
3. The mechanic of Party B shall carry out the construction according to the equipment operation regulations. Otherwise, Party B shall bear all the consequences.
4. The relevant personnel of Party B must keep this contract strictly confidential, otherwise all the consequences arising therefrom shall be borne by Party B. ..
Settlement method of intransitive verbs and related matters
1. Lease term: from (year) to (year), and the rent is calculated after the equipment arrives at the construction site for installation and commissioning. After the lease expires, Party A will hand over the equipment to Party B in good condition and go through the exit formalities. If Party A continues to lease, it needs to sign a renewal contract. If the lease is renewed for less than one month, the lease fee shall be calculated according to the actual number of days.
2. Settlement method: the equipment rental fee is calculated on a monthly basis (RMB/month/day). After the mechanical equipment is used for one month, Party A is responsible for reporting the capital plan to the project department and paying Party B. ..
4. Freight bearing: Party B shall pay the equipment entrance fee in advance and settle it together after the project is completed. (If the equipment is leased for one month, Party B shall bear the import and export expenses. For less than one month, Party A shall bear the exit fee)
5. Equipment maintenance: Party A shall assist Party B's mechanic in equipment maintenance, and the maintenance expenses incurred shall be borne by Party B. ..
6. Equipment maintenance or downtime due to failure shall not exceed three days per month, and no rental fee shall be charged for the days beyond that (ten hours of maintenance is equivalent to one day). If the project is stopped or stopped for more than 7 days in a month due to force majeure, the rental fee will be given according to the actual number of days.
7. Working hours: The total working hours per month shall not exceed 300 hours in principle.
Eight. Settlement of disputes
All disputes concerning this contract shall be settled by both parties through friendly negotiation in accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws. If negotiation fails, it shall be submitted to the arbitration commission, and the arbitration fee and attorney fee of the winning party shall be borne by the losing party.
Nine. This contract is made in duplicate, one for each party. It will take effect as of the date of signature and seal by both parties.
Party A (seal): Party B (seal or fingerprint)
Representative of Party A: Representative of Party B:
Address: Address:
Tel: Tel:
Date of signature: year month day.
Machine Lease Contract Sample 3
Party A:
Party B:
Party A and Party B, in accordance with the relevant provisions of the Contract Law of People's Republic of China (PRC) and on the principle of equality and mutual benefit, have entered into this contract through friendly negotiation on the lease of equipment by Party A to Party B..
I. Equipment model: ZL-50 loader
Second, the equipment use place and project:
This leased equipment is only used for pavement works in Luonan.
Three. Ownership and use right of leased equipment
1. Party A has the right to use the equipment within the scope specified in this contract.
2. Party B has the ownership of the leased equipment.
Four. Party B shall provide 1 equipment operators for Party A, and Party A shall be responsible for accommodation and subsidies. Party B is responsible for the salary of equipment operators.
Verb (abbreviation of verb) lease term and rent settlement method
1. From September 9, 2000 (the rent is calculated according to the actual entry date) to the end of the project, after the lease expires, Party A shall hand over the equipment to Party B for exit formalities. If Party A continues to use it, it shall re-sign the lease renewal contract within five days before the expiration of this contract.
3. Both parties agree that the equipment rental fee is 15000.00 yuan/month, equivalent to 500.00 yuan/day.
4. After the completion of the project, Party B must provide a formal tax bill as the basis for settlement, and pay the expenses in one lump sum.
Six, the use and maintenance of equipment
1. During the lease period, Party B shall bear the main fuel required for the equipment. ..
2. During the operation period, Party A has three days of equipment maintenance time every month to ensure the smooth progress of the construction. During the construction period, if the equipment cannot work for more than three days due to Party A's reasons, Party B will deduct the rent for the corresponding overtime days. Party A shall not undertake other compensation responsibilities.
Seven. Obligations of Party A
1. Provide Party B with equipment with good performance.
2. After the equipment enters Party B's construction site, Party A's mechanic shall obey the dispatch and command of Party B's site management personnel and abide by Party B's construction site management system.
3. The operators of Party A shall carry out the construction according to the equipment operation regulations, and Party A shall be responsible for the unsafe problems caused by illegal operation.
Eight. Obligations of Party B
1. Party B is responsible for keeping the equipment on the construction site and ensuring the safety of the equipment and Party A's personnel. If the equipment is damaged or lost due to Party B's reasons, Party B shall be responsible for compensation.
2. Party B shall not force Party A's mobile phone operator to violate regulations or overload operation.
3. During the equipment lease period, if the work is stopped due to factors other than Party A's reasons or force majeure (such as rain, Party A's equipment being detained by a third party, and Party B's failure to pay the rent on time), Party B shall pay the rent according to the contract.
4. Party B shall check and accept the leased equipment at the delivery place, and at the same time, hand over the signed and sealed acceptance form to Party A. ..
Nine. responsibility for breach of contract
Party A and Party B must strictly implement the terms of this contract. Without the written consent of the other party, either party shall not change or terminate this contract halfway, otherwise it shall pay the other party a penalty of 65,438+00% of the total contract price.
X. Settlement of disputes
This contract is made in triplicate, two for Party A and one for Party B. For matters not covered in this contract, both parties shall negotiate separately. This contract shall come into force as of the date of signing.
Party A:
Time: Year Month Day
Party B:
Time: Year Month Day
Sample machine lease contract 4
Party A (lessee):
Party B (Lessor):
Party A rents Party B's Zhonglian 280 rotary drilling rig and equipment, and both parties reach the following agreement through negotiation:
1. Lease time: 20__ year 10 07 10 ——20__ year 06 5438+00 07 10.
2. Construction site: Beijing
3. Equipment list: See the list for the main engine 1 table, mechanical lock rod 1 root, bit casing and other accessories of Zhonglian 280 rotary drilling rig.
4. Rent settlement method:
(1) Party A shall timely pay a loan of130,000 yuan to the machine manufacturer every month, otherwise Party B has nothing to do with the manufacturer's shutdown. ..
(2) Party A shall pay Party B a lease deposit of RMB 100,000 Yuan only, which shall be paid in one lump sum before the lease withdrawal date.
(3) After the project is settled, Party A shall pay Party B the profit of 1 1 ten thousand/month.
(4) If tools need to be added after the equipment enters the site, Party A shall arrange it by itself.
5. Relevant agreements:
(1) Party A is responsible for providing equipment operators, operating in strict accordance with the equipment operation procedures, and taking charge of the daily maintenance of the equipment.
(3) During the equipment lease period, Party A is responsible for the fuel, electricity and maintenance costs of the equipment.
6. Party A's responsibilities:
(1) Party A must prepare Party B's equipment for mobilization and provide necessary mobilization conditions.
(2) Party A must have a special person to guide the equipment construction, but it shall not violate the rules, and all losses caused by the violation of Party A's personnel shall be borne by Party A. ..
(3) Party A shall be responsible for the safety of the equipment. If Party A's safety work is not in place, Party A shall be responsible for the loss of the equipment and its spare parts.
7. Party B's responsibilities:
(1) Party B shall ensure that the technical performance of mechanical equipment entering the construction site is in good condition.
(3) If Party B's mechanical equipment fails, Party B shall actively cooperate with the organization personnel to carry out emergency repair. If this affects Party A's construction for more than three days, the shift fee for that day can be exempted after being signed by both parties.
8. Matters not covered shall be settled by both parties through consultation. If negotiation fails, resort to legal solution.
9. This contract shall come into effect after being signed and sealed by both parties. This contract is made in duplicate, one for each party.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Sample machine lease contract 5
Lessor: _ _ _ _ _ _ _ (Party A)
Lessee: _ _ _ _ _ _ _ (Party A)
Signing place: _ _ _ _ _ _ _ _ _ _ _
Signature time: _ _ _ _ _ _ _ _ _ _ _ _
In accordance with the Contract Law, both parties hereby sign this contract through friendly negotiation.
I. List of Equipment
________________________________________。
Second, the lease term
1。 Party A shall provide Party B with the rental service of the above-mentioned equipment from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. The lease term is _ _ _ days, and the rent is _ _ _ _ yuan/set/day. Total _ _ _ _ _ _ _ _. (RMB)
2。 After Party B decides to lease the equipment, it shall pay the same amount of equipment money as a deposit before leaving the site. When Party B returns the equipment, it shall pay the full rent to Party A in one lump sum, and Party A shall refund the deposit to Party B at the same time.
3。 Time, place, method and acceptance of delivery of the leased property: the lessor will hand over the leased property to the lessee at the place where the contract is signed, and the lessee will start on-site inspection, and the lessee will sign this contract, indicating that the leased property has been accepted.
Third, matters needing attention
1。 Party B shall not sublet or withdraw the lease during the lease term; Party B shall not disassemble and modify the equipment without authorization, but must use it correctly to ensure that the equipment is intact, otherwise all losses caused thereby shall be borne by Party B. ..
2。 If Party B fails to sign the lease renewal contract with Party A, the lessee shall return the leased machine on the _ _ _ _ _ _ day after the lease term ends. If it is necessary to renew the lease, both parties need to sign a new lease contract. After the expiration of this contract, Party A has the right to take back the equipment at any time and collect the necessary overdue fees.
Four. supplementary terms
1。 economic compensation
If the lessee causes damage to the leased machine during use, it shall pay compensation according to the following terms:
(1) Shell: The damage will not affect the appearance, and compensation will be _ _ _ _ _ _ _ _ _ _ _ _ _; The compensation for appearance damage is _ _ _ _ _ _ _ yuan;
(2) Lens/display screen: scratches do not affect the use of _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(3) Damage to the light bulb/motherboard: _ _ _ _ _ _ _ _ Yuan (compensation according to the actual market price)
(4) Other accessories: if they cannot be repaired, they shall be compensated according to the market price;
2。 Matters not covered in this contract need to be supplemented, and both parties shall make supplementary provisions through consultation, which have the same legal effect as this contract.
Disputes arising in the course of performance shall be settled by both parties through consultation;
3。 Where there are no provisions in this contract, the provisions of People's Republic of China (PRC) Contract Law shall prevail.
4。 This contract is made in duplicate, one for each party. This contract shall come into effect as of the date of signature by both parties.
Lessee: _ _ _ _ _ _ _ _ _ _ _
Legal representative or entrusted undertaker: _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Lessor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Legal representative or entrusted undertaker: _ _ _ _ _ _ _
Tel: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5 Relevant clauses of machine lease contract sample:
★ Mechanical equipment lease contract template
★ 3 concise model clauses of machinery lease contract
★ The latest three model mechanical lease contracts.
★ The latest three models of mechanical lease contract
★ Practical mechanical equipment lease contract template
★ Model mechanical lease contract agreement
★ Collection of mechanical equipment lease contract samples
★ The model of excavator lease contract is 3 pieces simple.
★ Construction machinery lease contract template
★ 5 Model clauses of lease contract agreement template