Current location - Recipe Complete Network - Complete cookbook - How to use the integrated wall? Six steps of wall installation.
How to use the integrated wall? Six steps of wall installation.
With the progress of society, people's pursuit of quality of life is getting higher and higher, and integrated wall is deeply loved by consumers because of its green and environmentally friendly characteristics. So, how should the integrated wall be used? Let Bian Xiao introduce how to use the integrated wall for everyone!

How to use the integrated wall;

1, ready to install construction tools.

When we install the integrated wall, we must first prepare the construction tools. For example: woodworking workbench, air nail gun, steel nail machine, infrared range finder, infrared vertical instrument, angle cutter, hand-held cutting machine, manual grooving machine, glue gun, alloy saw blade, sewing agent, water-based edge-closing glue, special putty paste, etc.

2. Prepare the selected integrated wallboard.

Everyone's pursuit of beauty is different, and you can choose the style of integrated wall according to your own hobbies. For example, you can choose Chinese style: auspicious elephant, golden silk, Huang Mu, fairview park and so on. Then according to the shape and size of each space, prepare the corresponding plates and accessories.

3, keep the wall flat

If it is an old house renovation, it is best to fill in the concave and convex parts to keep the flatness of the wall. The blank room can be installed directly.

4. Use Mo Dou to play the line.

We should determine the starting position and joint position according to the design of the home and the external dimensions of the building, and then pop up horizontal and vertical lines. Hang vertical and horizontal control lines around the corners of Yin and Yang, windows and balconies.

5. Install the integrated keel

When we install the ceiling, we need to install the keel first, and then we can install the integrated wall. You don't need to install the keel on the wall, just install it directly. The bottom of the keel should be lightning-proof and connected to the grounding bus reliably.

6 integrated wall installation

The cutting of integrated wall should be carried out according to the design drawings and the actual size of the wall, and pay attention to the alignment of pattern joints. It is best to install the integrated wall from bottom to top, with large corners before flat-fell seam, and the ceiling keel can be fixed with self-tapping screws or rivets. Wall covering corners shall be treated with V-type grooving machine as far as possible.