Boot-F2.
Power on - MENU - F2 (Stakeout) - Select file - Enter - After entering the stakeout program, select F4 (page turning) - F2 (New point) - F2 (resection method).
The so-called resection is to transfer coordinates through known coordinates. The purpose is to encrypt the level points and facilitate measurement. First, find two or more known leveling points, then place the total station in a place with direct sight of these two known points, level it, find the resection in the menu, and enter the coordinates of leveling point 1 , Sight, confirm, rotate clockwise (attention!) Enter the coordinates of level point 2, sight and confirm, click Calculate, coordinates, and record the coordinates and elevation of the intersection point.
3. How to enter the resection menu and create points on the Topcon GTS102/332N total station.
4. Power on - MENU - F2 (Stakeout) - Select file - Enter - After entering the stakeout program, select F4 (Page turning) - F2 (New point) ——F2 (rearsection method).
5. F1 input (the new point number is also the point number of the future measuring point) 1-X——F4——F4——F1NO01 (the first known point number)——F3 (the first known point number) Known point coordinates) ——F1 (N value) —— F4 ——F1 (E value) ——F4 ——F4 ——F4 ——F4.
6. (Enter the second known point (rotate the instrument to the second known point and aim).
7. (New point no02) F3 (second known point) Known point coordinates) ——F1 (N value) —— F4 ——F1 (E value) ——F4 ——F4 ——F4 ——F4 ——F4 (calculation) ——F4 (new point coordinates) ——F3 (The new point is built, which is the coordinates of the measuring point) ——ESC——ESC——Enter the stakeout interface to complete.