Unit commitment letter
In daily life and work, the letter of commitment is used more and more widely. A letter of commitment is the promisor's complete and simple consent to the offer, which is expressed in writing. So how is the general commitment letter written? The following are seven promises of our company for reference only. Let's have a look.

Commitment letter of the unit 1 The unit and the main person in charge of this project promise to earnestly perform the following corresponding responsibilities during the construction of this project, and undertake lifelong quality responsibility according to law:

(1) Bidding for the survey, design, construction, supervision units of engineering construction projects and the procurement of important equipment and materials related to engineering construction according to law, and taking engineering quality as an important content of preferential contracting.

(2) Contract the project to the construction, supervision, survey, design, testing and construction drawing review units with corresponding qualification levels, do not dismember the contracted project, conduct bidding in strict accordance with the law and regulations, select the best team, do not force bidders to bid below the cost price, do not arbitrarily compress the reasonable construction period, pay the project payment according to the contract, and be responsible for the overall quality of the project.

(3) Organize the project construction in strict accordance with the basic construction procedures, adhere to the principle of first survey, then design, then scheme review and finally construction, submit the construction drawing design documents to a qualified scheme review agency for review, go through the engineering quality supervision and registration formalities according to regulations, and start construction only after obtaining the construction permit.

(4) Before the project starts, organize the design, construction and supervision units to conduct design disclosure and blue prints.the design in time, and provide the construction drawing design documents that meet the construction needs and are stamped with the special seal for drawing review to the construction and supervision units.

(5) Before the project starts, a corresponding quality management system shall be established. According to the scale of the project construction, a corresponding number of construction site representatives with certain construction experience shall be set up to be responsible for supervising the quality behaviors of contractors such as construction, supervision and engineering inspection. The legal representative of the unit, the person in charge of the project and the representative of the construction site shall be responsible for the project quality for life.

(six) shall not express or imply that the survey, design, construction, testing and material production and supply units violate the mandatory standards for engineering construction or use unqualified building materials, building components and equipment.

(seven) before the project starts, entrust an engineering quality testing institution with corresponding testing qualifications to carry out testing.

Responsible for engineering inspection. Supervise the implementation of witness sampling system on the construction site and the detection of engineering entities, and supervise the delivery of unqualified raw materials. If the quality of the entity is unqualified, organize the supervision and construction unit to carry out rectification according to the design requirements.

Materials and equipment purchased by oneself shall ensure that their quality meets the design requirements.

(eight) any major engineering changes involving increased load, structural type, main functions, building energy conservation, fire control facilities, etc., shall be reported to the original construction drawing review institution for review before construction.

(9) After the completion of the project, organize relevant units such as survey, design, supervision and construction to conduct completion acceptance, and accept the supervision of the project quality supervision organization. The project can only be delivered for use after the acceptance, and the completion acceptance filing formalities shall be handled within 15 days after the acceptance of the project.

Residential projects should first organize household acceptance, and the completion acceptance should be carried out after the household acceptance is qualified. After the completion of acceptance, to provide users with residential instructions. Before the residential project is completed and accepted, the house key shall not be issued to the user.

(ten) responsible for the preparation and filing of engineering documents, collect commitments, establish and improve the engineering archives, and hand over the construction engineering archives to the urban construction archives management department within three months after the completion acceptance.

(eleven) after the delivery of the project, seriously accept the owner's quality complaints, and actively organize the contractor to inspect and repair the quality defects that affect the structural safety and important use functions.

(twelve) the quality responsibilities and obligations stipulated by other laws and regulations.

(official seal of the company) Signature of legal representative:

Date, year and month

As the owner of catering service units, I know that the quality, safety and hygiene of the food we provide are directly related to the health and life safety of consumers. In order to effectively protect people's food consumption safety and safeguard consumers' legitimate rights and interests, the owner solemnly promises as follows:

First, strictly abide by the national Food Safety Law, Food Hygiene Management Measures for Catering Industry, Consumer Protection Law and other relevant laws and regulations, strictly implement the catering industry norms, and firmly establish the concept of safety first and honest management.

Two, strictly implement the effective "health certificate" system for employees, and regularly do a good job in health examination and health knowledge training for employees.

Three, the purchase of beverages, drinks and other foods and their raw materials, condiments meet the relevant hygiene requirements, do not sell fake and shoddy food, to provide consumers with safe service facilities and consumption environment.

Four, tableware must be washed and disinfected before use, in line with the relevant national hygiene standards, and the unsterilized tableware shall not be used by customers.

Five, the implementation of price tag, clearly indicate the prices and specifications of pasta, dishes, drinks and other related commodities in the menu and price list.

6. The owner (legal representative) of the catering service unit, as the first person responsible for food safety, is fully responsible for the food safety of catering operations. If the food provided harms the rights and interests of consumers, it shall be handled voluntarily in accordance with the provisions of laws and regulations such as the Law on the Protection of Consumer Rights and Interests.

Please supervise the above commitments from all walks of life.

Name of Commitment Unit: (Seal) Owner of Commitment Unit:

(Legal Representative)

Health license number:

Business license number: supervision unit: (seal)

Supervisor:

Date of Commitment: Year Month Day

As the legal representative or authorized client of Hunan Xiangping Road and Bridge Construction Co., Ltd., I solemnly declare and promise that this enterprise will strictly abide by the relevant laws, regulations and provisions of the state or Gansu Province, abide by the law and operate in good faith during the bidding and construction of this project, or during the supply and service. Accept the supervision of administrative departments at all levels and relevant supervision institutions. At the same time, we will fulfill the following commitments. If there is any violation, the enterprise is willing to bear the corresponding responsibility and accept the punishment made by the administrative department according to laws and regulations.

Our company voluntarily makes a solemn commitment to the tenderee regarding the bidding of this project as follows: 1. Strictly abide by the national bidding laws and regulations, do not make all kinds of false bids, and fulfill the responsibilities and obligations required (bidding documents or prequalification application documents).

2. Guarantee not to provide forged or altered official documents and relevant certificates, licenses, certificates, achievements or false information.

3. Guarantee not to borrow others' qualifications to bid or sell their own qualifications to bid, not to collude with other bidders to bid, and not to win the bid by illegal means.

4. Ensure that the contents of the bidding documents are free from any falsehood.

5. Ensure that the construction director (project manager) of the capital project to be invested has no project under construction or the main project of the project under construction has been completed during the bidding construction of this project.

6. Ensure that the construction contract or supply contract is signed in accordance with the bidding documents and the bid-winning notice, and submit the performance guarantee.

7. If our company wins the bid, I promise to abide by laws and regulations during the performance of the contract and not to subcontract illegally.

8. If our company wins the bid, we will ensure that after winning the bid, we will send site management personnel and input equipment according to the bidding documents and contract commitments, and perform the contract in strict accordance with the requirements of quality and time limit.

9. If our company wins the bid, we will ensure that after winning the bid, we will strengthen the management of the construction site to ensure safety in production and work closely with the construction unit and supervision unit.

10. Strictly implement the relevant regulations on honesty, and there will be no violation of discipline and law.

1 1. If our company violates the above commitments or has other gross negligence such as breach of contract or violation of law in the process of bidding (or performance of contract) for this project, we agree that the tenderer will declare our company's bad records to the administrative department in addition to accepting punishment according to the bidding documents, contracts and laws and regulations.

I have carefully read all the contents of Open Recruitment Guide for Public Institutions in Yunyang County in the first quarter of 20xx, List of Open Recruitment Positions and Conditions for Health Institutions in Yunyang County, List of Open Recruitment Positions and Conditions for Staff in Other Public Institutions in Yunyang County and Relevant Precautions, and I meet the registration conditions according to my own situation. I solemnly promise as follows:

All the information I have filled in (provided), such as personal basic information, education background and major, is true and valid. I consciously abide by the recruitment regulations, be honest and trustworthy, strictly abide by discipline, and earnestly fulfill my application obligations.

I am willing to take responsibility for the consequences caused by the fact that the information filled in by the individual is inconsistent with my real situation, the relevant information and documents provided are untrue, the major I studied is inconsistent with the professional requirements of the post I applied for, it is not within the scope of recruitment in the brochure or it violates the relevant disciplinary regulations. At the same time, it is accepted that "those who falsify, alter, fraudulently use relevant documents and materials to defraud the examination qualification and maliciously register interfere with the normal registration order, once found, will be disqualified from this recruitment and will not be allowed to apply for Yunyang County government agencies and institutions again within 5 years."

Commitment:

date month year

Unit Commitment Chapter V Project Name: I promise that during the construction of this project, I will earnestly perform the following corresponding responsibilities and undertake the corresponding lifelong quality and safety responsibilities.

1. To undertake the project within the business scope permitted by the qualification grade, no other unit or individual may undertake the project in its own name. After undertaking the project, a contract shall be signed according to law, and the construction can only be started after obtaining the construction permit.

2, without the consent of the construction unit, don't subcontract any part of the contracted project at will. All contracted projects shall not be subcontracted or dismembered and subcontracted to others in the name of subcontracting.

3, in strict accordance with the provisions, equipped with key positions in the construction project department personnel, and ensure that all personnel to perform their duties.

4. Seriously organize the construction in strict accordance with the engineering design documents, construction technical standards and quality standards agreed in the contract, which have passed the examination by the construction drawing review organization and are stamped with special seals. Do not modify the engineering design without authorization, and do not cut corners. And the building materials, building components, equipment and commercial concrete used in the construction shall be witness sampled in strict accordance with the regulations, and the inspection shall be recorded in writing and signed by a special person; Without inspection or unqualified inspection, it shall not be used in engineering.

5, establish and improve the quality and safety inspection and acceptance system, strict process management, completes the concealed engineering quality inspection and record. Before the concealed works are concealed, the construction, design and supervision units and engineering quality supervision institutions shall be notified in time for inspection and acceptance.

6. The data collection is true, accurate and complete, the signing procedures are complete, and it is timely sorted and handed over to the construction unit for filing.

7, the quality problems in the construction or unqualified project completion acceptance, responsible for the repair. Issue a quality warranty to the construction unit, specifying the warranty scope, warranty period and warranty responsibility of the construction project. In case of quality problems in construction projects within the warranty scope and warranty period, the warranty obligations shall be fulfilled in strict accordance with laws and regulations, and the losses caused thereby shall be compensated.

8. Duties stipulated by other laws and regulations.

Commitment unit (official seal):

Commitment (Project Manager):

Date, year and month

Letter of Commitment from Unit 6 to xxxxxxxxxxxxxxxxxx Company

In order to do a good job in the supervision of this project, our company solemnly promises:

A, about supervision personnel

1, our company will organize the personnel who promised to bid to enter the site to carry out supervision work within the time limit required by the owner. If there is a reason to replace the supervisor, we will get the consent of the owner in advance and ensure that the qualification of the replacement personnel is not lower than that of the replaced personnel and the requirements of the contract.

2. During the contract period, our company will take all measures to ensure the stability of supervision personnel, so as to facilitate the continuous and normal supervision work.

3. If it is necessary to increase the number of supervisors due to engineering needs or other requirements of the owner, our company will actively send supervisors who meet the qualification requirements to enter the site.

4. Before the annual winter break or when the single project has been completed and the supervisors need to leave, we promise to submit a written personnel exit plan to the owner in advance, and organize the supervisors to leave as planned after obtaining the written consent of the owner.

5. If individual supervisors fail to provide supervision services as agreed in the supervision contract, once found, our company will deal with it seriously and accept the treatment and punishment taken by the owner according to the terms of the contract.

Second, about the engineering quality

1, our company will select qualified supervisors with strong business ability, strong sense of responsibility, rich experience and strong years to form a project supervision organization, and ensure the high quality of the project with high-quality supervisors.

2, our company has a perfect quality assurance system and reward and punishment measures to ensure the normal and effective operation of the quality assurance system, and timely cash rewards and punishments, using the system and economic leverage to restrain supervisors to strengthen supervision of project quality and ensure project quality.

3. We will take measures such as advanced control (reviewing the commencement report and special construction plan, checking the construction preparation, sampling the quality of raw materials, etc.). ), process control (patrol, standby, special inspection, etc. ) and acceptance control (quality data inspection, engineering entity quality inspection, etc. ) Strengthen quality control to ensure project quality; At the same time, the contractor has the obligation to ensure the project quality through supervision instructions, informed criticism, rework, suspension of construction and measurement.

Third, about the progress of the project.

1. Require the contractor to submit the general project schedule, annual and monthly construction schedule and monthly report according to the contract requirements, and review and supervise their implementation.

2. Check the implementation of the schedule at any time, compare the schedule with the actual schedule, and guide the contractor to take corresponding measures to ensure the implementation of the plan in case of deviation.

3. Check the contractor's construction investment once a month (including funds, machinery and equipment, material reserves, labor, etc.). ), and compared with the monthly planned investment. If the project progress is affected by insufficient investment, instruct the contractor to increase investment in time to ensure the project progress.

4. Improve the efficiency of supervision: review and sign the commencement report in time, and conduct process acceptance in time to ensure that the project can start on schedule and can be transferred to the next process in time after completion; Strengthen process control, find and solve problems in time, and the project progress is not affected by quality and safety problems.

Through the above measures, we guarantee to achieve the following time limit control objectives: to ensure timely completion and strive to complete ahead of schedule.

Four, about safety in production

1, urging the contractor to establish a reliable safety guarantee system and a vertical and horizontal safety responsibility system; Strengthen the three-level safety education of individuals, construction teams and departments; Improve the safety production management system and safety technical disclosure system; Prepare special construction plans for production safety and emergency plans for production safety accidents, and conduct safety drills; Supervise and urge contractors to actively carry out "safe site construction" activities.

2. Supervise the resident supervision institutions to carry out safety and civilized construction education and training once a month to improve the safety awareness of supervisors; Before each important subdivisional work starts, the technical disclosure of safety supervision shall be made to all supervisors, and the possible safety accidents and supervision methods in the project shall be explained to ensure that no safety accidents of any form will occur.

3. Strengthen the control of safety production process, establish safety production account and hazard source account, and carefully record the safety supervision log; Through patrol, inspection and other measures, timely discover and eliminate potential safety hazards; Through supervision instruction, informed criticism, shutdown, rectification and punishment, the contractor must ensure safe production.

Through the above measures, the general safety accident frequency is controlled within 3‰, and the accident rate is controlled at 1. Within 5‰, resolutely put an end to major casualties, and no serious accidents caused by improper management or identified as responsibilities by the safety supervision bureau will occur.

Verb (abbreviation of verb) is about environmental protection.

Take the lead in promoting clean production technology, standardize the construction site, realize civilized construction, adopt the active management mode of "whole process control", try to avoid destroying natural ecology, reduce environmental pollution, compensate the loss of natural resources, make the impact of engineering construction on the environment reach the minimum environmental loss, the minimum environmental restoration cost and the best ecological function, and ensure the construction and implementation of green projects.

Six, on the construction of a clean government

1, our company attaches great importance to building a clean government. Resident supervision institutions must set up a leading group for the construction of clean government, establish and improve the guarantee system for the construction of clean government, increase the publicity and education of clean government, and run the construction of clean government through the whole process of construction supervision.

2. Our company carries out "Sunshine Project Construction Activities" in the resident supervision institutions, regularly publicizes the quality inspection, change approval and the use of office and living expenses, accepts the supervision of all supervisors, contractors, leaders at all levels and even all sectors of society, and makes every effort to build a high-quality project with Sunshine Project as the starting point to escort the rapid development of the star map project.

3. If any supervisor can't stand the temptation, he will do something that will damage the image of the supervisor and the interests of the contractor and the owner, such as taking cards, eating, drinking, whoring and gambling. Once found, our company will take measures such as criticism and education, dismissal, and even transfer to judicial organs for legal responsibility, and unconditionally accept the treatment and punishment taken by the owner according to the terms of the contract.

Through the above measures, we guarantee that this project will become a high-quality project and a sunshine project.

Bidder: XXXXXXXXXXXX Company

Address: XXXXXXXXX

Legal representative or entrusted agent: (seal or signature)

Commitment date: 20xx65438+1October 27th.

Unit Commitment 7 Xinjiang Uni-President Food Co., Ltd. (name of the construction unit), as the construction unit of Uni-President's No.1 Factory Extension-Material Warehouse (name of the construction project), promises to perform the following duties on the fire control quality of this construction project:

First, apply for fire protection design review and fire protection acceptance of construction projects according to law, handle the filing procedures of fire protection design and completion acceptance according to law and accept spot checks; Public gathering places set up in construction projects shall not be put into use or business without fire safety inspection or failing to meet fire safety requirements after inspection;

Two, the implementation of engineering supervision of construction projects, fire construction quality should be entrusted to the supervision; Three, choose the fire design and construction units with the qualification grade stipulated by the state;

Four, in the project should choose qualified fire products and building materials that meet the requirements of fire performance, flame retardant products should be qualified by the national testing and through the identification of flame retardant products. After the decoration materials and fire-fighting products enter the construction site, witness sampling inspection and sampling inspection shall be carried out in accordance with the requirements of the national Code for Fire Protection of Construction and Acceptance of Interior Decoration Engineering of Buildings (GB50354-20xx), and on-site sampling shall be carried out in accordance with regulations, and they shall be sent to an inspection agency with corresponding qualifications for inspection, and can be put into use only after passing the inspection;

Five, according to the law should go through the fire design audit, fire acceptance of the construction project, unaudited or unqualified acceptance, shall not organize the construction; Without acceptance or unqualified acceptance, it shall not be delivered for use;

Six, in the construction, if there are any design changes or secondary decoration, timely report to the public security organs of fire control institutions, the construction can be carried out only after passing the examination;

Seven, urge the construction unit to establish a fire safety organization on the construction site, implement the fire safety responsibility system step by step, formulate fire emergency evacuation plans, equip with necessary fire-fighting equipment, organize regular fire safety inspections on the construction site, eliminate fire hazards and prevent construction fires;

Eight, after the completion of the project, organize the construction, engineering supervision, design and other units to conduct preliminary fire acceptance, and entrust the fire control facilities testing institutions to test the fire control facilities of this project.

Those who fail to perform the above fire safety duties will be punished according to the relevant provisions of Articles 58 and 59 of the Fire Protection Law. Causing harmful consequences, according to the provisions of Article 41 of the Regulations on Fire Prevention and Management of Construction Projects, in addition to accepting administrative punishment or investigating criminal responsibility according to law, it shall also bear civil liability for compensation according to law.

(Seal)