Creative group building activity plan, the plan has the characteristics of writing afterwards. With the development of society, more and more affairs will use plans, and both social workers in schools and people in the workplace need to learn to write plans. The following is a creative group building activity plan for everyone.
Creative Scheme of League Building Activities 1 I. Purpose of Activities
In order to make employees more familiar with the company's existing business and resources; Understand the daily work of other departments of the company; Strengthen communication, exchange and cooperation between departments and colleagues; Enhance the cohesion of the company; Improve work efficiency and employee's enthusiasm; At the same time, arrange the tasks of the company in the second half of the year, go hand in hand and strive to achieve the ultimate goal.
Second, the theme of the event
"Open your heart and be free and unrestrained."
Third, the activity time
20xx year x month x day x hour.
Fourth, the venue
Meeting rooms in nearby hotels.
Verb (abbreviation for verb) activity participation theme
Xx employees
Sixth, the event host
Xxx is given priority to, and the leaders of various departments take turns to go into battle.
Seven. Activity form
Training+interactive games
Eight. Activity plan (divided into two parts, about 4 hours in total)
Prelude: (about 30 minutes)
The boss introduced the significance of this activity, introduced the company, introduced the situation of various departments and responsible persons, and announced the work objectives and work plans for the second half of the year. The following time is given to the heads of various departments.
The leaders of all departments take turns to introduce the members of their departments. For example, "this is xxx, a dynamic beauty in the customer department", and then xxx comes on stage to greet everyone and introduce himself in the most humorous and representative language, including job responsibilities, hobbies and so on, so as to impress everyone.
After all the members of the department are introduced, the person in charge will describe the job responsibilities and daily work of the department, starting with the members. At the same time, find out the words or sentences that best represent the work situation or future expectations of the department as the code name of the department. This code can be used as a slogan in interactive games.
The first part: training (the time of each department is controlled at 15 minutes, Q &;; Phase A is controlled at 2 minutes, with a rest time of 10 minutes, totaling 2 hours and 30 minutes).
Materials required:
Projector, projection screen, camera, video camera, sound system, suitable background music.
Trainer:
The person in charge or representative of each department and the employees of this department can be used as an effective supplement.
Process:
The person in charge of each department trains the employees of the company according to the work content, scope and main products of the department.
Part II: Interactive Games
Purpose: Strengthen teamwork, promote cooperation among departments and enhance understanding among colleagues.
Creative activity plan for League building 2 I. Theme of the activity:
"Cohesive feelings, happy outdoor travel"
Second, the purpose of the activity:
In order to enrich employees' entertainment life, enhance communication among employees, relieve work pressure, realize the combination of work and rest, and enhance team cohesion, the company's trade union and comprehensive management department organized and planned this outdoor activity plan.
Third, the theme of the event:
All personnel
Four. Location:
Verb (abbreviation for verb) activity route:
This activity will be carried out in two batches, which will not affect the normal business.
1. Assembly time: 8: 30am for the first batch and 8: 30am for the second batch.
2. Meeting place: At the entrance of the lobby of Long Yun Hotel, take the bus rented by the hotel and go to the activity place.
3. Activities: sightseeing, barbecue, outdoor games (see Annex 4 for details)1) Arrive at the destination at 9: 00 am: take a group photo 2)9:30- 165438+ play outdoor games at 0: 30 am 3) 165438+ 0: 00 am.
Intransitive verb activity budget:
1, fare:
2. Tickets for scenic spots:
3. oven cost:
4. Barbecue food (see attachment 1 for details):
5. Interactive game souvenirs (see Annex II for details):
6 spare drugs (see Annex III for details):
Seven. Total amount of funds for this budget: xx
Eight. Activity personnel arrangement:
Planner: Buyer:
Props and photos: storage of items:
Outdoor activity game organization: person in charge of activity safety:
Nine, matters needing attention:
1. This activity is an outdoor sport. Participants are advised to wear light and loose clothes and sports shoes.
2, must strictly abide by the time regulations, arrive at the meeting place on time, and count the number of people in time. All obey the arrangement of the person in charge.
3. Do a good job of communication and coordination. In case of unexpected events during the period, report to the event organizer in time and do a good job in response.
4. Take care of your personal belongings, especially valuables such as mobile phones and wallets.
5, pay attention to barbecue safety, so as not to burn.
6. Properly dispose of garbage, take care of everything in the scenic spot and be a civilized person.
Creative team building activity plan 3: melting and condensation
1。 Activity time: 20xx April 22nd.
2。 Number of participants: 25-35 people
3。 Venue: Shanghai Oriental Oasis
(1) position
:
(2) Introduction:
Oriental Land, located in Qingpu District, Shanghai, is the only large-scale park in Shanghai that integrates outward bound training, youth social practice, team activities and leisure tourism. Adjacent to the scenic Dianshan Lake, it covers an area of 5,600 mu, including 2,000 mu of water area.
Oriental land consists of eight parks: wisdom avenue, brave wisdom, national defense education, survival challenge, scientific exploration, water sports, sports training and life practice.
4。 League building model and its advantages and disadvantages
External development companies assist in development.
Advantages: stronger integration can make the whole team more integrated, with stronger sense of integrity, more compact rhythm, closer connection between modules, stronger control and higher sense of team obedience.
In the process of completing the activity, the spirit of corporate culture and team building can run through it. There are different tasks, different games, and cultural construction for employees' feelings. After the activity is completed, it is easier to form a systematic team building achievement.
Disadvantages: the cost budget is high, the pace is tight, and the staff's relaxation degree is slightly lower than that of self-help construction.
5。 Activity purpose
(1) Go out of the office, go into nature, do some sports and activities, and enjoy spring and sunshine.
(2) Provide an opportunity for employees who have joined the company and different departments in different periods to get to know each other and lay a better foundation for future work cooperation.
(3) Instill corporate culture and related moral concepts, and build an elite team with a high sense of identity with corporate culture.
6。 Specific activities
Morning: integrate activities (including sports and body movements, the game content is relatively simple, about 2-3)-purpose: let members get familiar with each other and lay the foundation for the activities of the day.
Lunch: a light lunch (relatively simple and short)
Lunch break: free rest (short time)
Afternoon: Task-based activity (there is only one activity, with complicated content, grouping, team leader, competition, reward mechanism, and team members to help complete a task, and then * simply summarize the feelings and gains after the end)-Purpose: There is a task game, which includes cultural construction.
Dinner: barbecue (long time, as a relaxation after a day)