Current location - Recipe Complete Network - Complete cookbook of home-style dishes - Introduction of floor tile construction scheme matters needing attention in floor tile laying
Introduction of floor tile construction scheme matters needing attention in floor tile laying
Floor tiles are very common decoration materials for home floor decoration, and there are many kinds of floor tiles on the market. Usually, people have higher requirements for floor tile paving, so the technology of floor tile paving is very important. At the same time, customize the construction scheme of floor tile paving, because the floor tile should not only be flat but also beautiful. What are the construction schemes for floor tile paving? Next, let's take a look at Bian Xiao.

1. What are the construction schemes for paving floor tiles?

1, the construction scheme of paving floor tiles, after leveling, check the flatness and how to obtain the flatness. After leveling, use windows to ensure the flatness, and the flatness error should be within 3 mm, at least 3 mm. After you lay tiles, the tiles will become uneven and empty.

2, floor tile construction scheme, pay attention to keep flat after don't turn sand. After the ground is leveled, the sand returns mainly because of leveling, and then it becomes leveled and maintenance-free. You should pay attention to the ratio of cement to sand. If you have too little cement or too much sand, you will easily produce sand. In the construction scheme of paving floor tiles, if exposed to light in the later stage, hardened cement will destroy the basically solidified surface and the ground will become sand. If the light is received early, more water will flow out, which will change the water-cement ratio of the surface and lead to polishing. Didn't stop the water from spilling on the ground. There must be water on the ground after leveling. Need timely water supply and maintenance to avoid the possibility of grinding on the ground.

3. If sand is found in the process of leveling the land with sand, it should be leveled with cement mortar.

4, packaging (1) floor tiles must be locked for more than 2 hours. In addition, the pre-layout operation must be performed before the tile is submerged. (2) Typical packaging is from one side to the other, and bricks are used near the corners instead of the whole to avoid affecting the appearance. If it is a bathroom floor tile, the most important thing is the height of the drain pipe. Most bathrooms have one or two floor drains. One of them is the shower floor, so be careful when laying floor tiles. The shower floor should be bigger. If the slope is not big enough, the water will not come out and the bathroom will be wet all day. (3) The construction scheme of paving floor tiles, when packing floor tiles, do not move the floor tiles lying but not completely condensed. If you walk around, the tiles may become empty. (4) After the tiles are pasted, it is best to protect them with protective film. Therefore, the floor tile is the initial decoration window project of family decoration. After the floor tile is completed, pictures and other works will come out. If you don't use a protective film, it is difficult to remove the paint.

Second, what are the precautions for tiling?

1. Generally, the materials used for indoor floors are antique bricks of Kyocera Square, which can be paved with ceramic tiles and 1: 2 cement mortar mixed with tile glue.

2, cleaning the grass-roots ground-cement mortar leveling-elevation, elastic line-material selection-material soaking wet-standard block installation-cement mortar-tile paving-caulking-cleaning-maintenance and completion.

3. The grass-roots treatment should be clean, and the uneven places should be repaired first. The base should be clean and free of mortar, especially lime mortar and oil stains. The ground should be wetted with water. When laying porcelain bricks, standard blocks must be placed, and the standard blocks should be placed at the intersection of cross lines and installed diagonally.

4. When paving, each line should be hung in turn. The maintenance of tile floor after paving is very important. After 24 hours of installation, it must be watered and maintained. After the towel is laid, it should be covered with sawdust for maintenance.

5, before the shop is stuck, try to spell ceramic tile, flower, color, number, so that the shop is stuck on the ground color is consistent.

6, ceramic tile must be soaked in the shade to dry, so as not to affect its condensation hardening, empty drum, shell and other issues, after the completion of the shop is stuck, 2-3 days shall not be trampled.

The above knowledge is related to the construction scheme of laying floor tiles. The laying of floor tiles is also a fine project, so everyone should follow the process when laying floor tiles, otherwise there will be problems and troubles in future life, which will not only waste money but also waste energy. Please continue to pay attention to more exciting home improvement information.