(2) Material picking list:
1. Every afternoon, the canteen managers and chefs will work out the requisition list of food raw materials according to tomorrow's recipes, and determine the quantity and quality requirements of the required food raw materials and related materials.
2. Insist on purchasing goods, have in and out, do not waste, and try not to hoard goods.
(3) Purchasing: The canteen purchasing personnel place an order with the supplier according to the picking situation, and determine the supply variety, quantity and delivery time.
(4) Acceptance:
1. The canteen staff must strictly check and supervise the quality and quantity of purchased materials to prevent unsafe, smelly, moldy and defective materials from flowing into the subsequent food operation process.
Vegetables and meat should be safe and fresh.
3, frozen food raw materials, to determine the effective shelf life, put an end to the product odor, strange smell.
4. Open the package and weigh the goods.
5. Buy and accept packaged foods and condiments with QS logo. The person in charge of the canteen may reject unqualified materials that violate or do not meet the requirements of this clause.
6. At the time of acceptance, the canteen manager, canteen leader and chef must be present at the same time, and they are not allowed to leave or do other things, otherwise it will be regarded as dereliction of duty.
7. Non-conforming products must be cleaned up on the spot, and are not allowed to enter the operation room, otherwise the inspector shall be investigated for responsibility.
8. Qualified items shall be signed by the restaurant manager and restaurant leader on the delivery note for confirmation.
9. Electronic scales should be checked frequently to ensure fairness. Acceptance personnel shall not operate illegally or engage in malpractices for personal gain.
10. The supplier cannot deliver the goods on time and with good quality. The person in charge of the canteen suggested that the canteen management personnel coordinate the purchasing personnel to place orders with alternative suppliers within 30 minutes, and required qualified materials to be delivered within 2 hours.