Current location - Recipe Complete Network - Complete recipe book - Farmland planting contract
Farmland planting contract
Model farmland planting contract (selected 10)

With the popularization of the concept of legal system, the position of contract can not be ignored, and contract coordinates the relationship between people and things. So how to write the relevant contract? The following is a demonstration contract for farmland planting (selected 10) that I have carefully arranged. You are welcome to refer to it and hope it will help you.

Farmland Planting Contract 1 Contract (Party A):

Contractor (Party B):

Through negotiation, Party A and Party B reach the following land contract agreement:

1. Party A will contract the _ _ _ _ mu of land located in _ _ _ to Party B for a period of three years (from _ _ _ _ _ _ _ _ _ _ _).

Two. Party B's responsibilities:

1. For the contracted land, Party B must plant trees and cultivate in the field according to relevant laws and regulations and Party A's requirements, and can interplant other crops in the forest on the premise of ensuring the planting area and the number of trees in the field.

2. Party A's land should be fully planted with trees as required. After Party B contracts, all contracted fields should be leveled, treated with grass and alkali and treated with pests. No surviving trees in the field should be replanted to ensure the survival rate and coverage rate of trees.

(The survival rate of trees per mu in strip field is over 85%, and the coverage rate per mu is over 85%, that is, the number of trees per mu is not less than1120, and the tree preservation rate is 100%). If the saplings planted every spring cannot survive in the spring and summer growth period, Party B shall replant them in autumn.

3. The trees planted by Party B are poplars or poplars.

4. All expenses (labor, water, electricity, pesticides, etc. The expenses incurred by Party B in planting trees, crops, field management and forest cultivation on the contracted land shall be borne by Party B. ..

5. If Party B dies of trees due to improper management of field farming, Party B shall bear the loss compensation.

6. Party A has the responsibility to supervise the land leveling, afforestation, field management, pest control, fire prevention and theft prevention in the contracted site of Party B, and Party B shall accept the reasonable suggestions and opinions put forward by Party A and put them into practice.

7. Party B shall carefully keep and maintain the power equipment, facilities, fence facilities and agricultural machinery provided by Party A. If it is stolen or damaged due to improper management and use, Party B shall bear the compensation, and all kinds of insurance and insurance shall be borne by Party B during the contract period, so as to achieve legal operation and safe production.

Three. Party A's responsibilities:

1, no land contract fee for three years (20_-20_).

2. Party A shall deliver the houses, tractors, motors, pumps and other items (see the list for details) to Party B for use, and Party B shall properly manage and maintain them to ensure that the items managed by Party A are intact.

3. Party A shall not interfere with the normal business activities of Party B..

Fourth, terminate the contract responsibility:

1. This contract can be terminated by mutual agreement.

2. If Party B fails to plant trees according to Party A's requirements and ensure the survival rate of trees, Party A has the right to terminate the contract.

Verb (abbreviation of verb) liability for breach of contract:

1. If Party B fails to perform the provisions of this contract, it shall compensate Party A for certain economic losses (RMB).

2. If Party A breaches the contract seriously, Party B may terminate the contract.

Party A:

_ _ _ _ _ _ _ _ _ _ _ _ _

Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _

Farmland Planting Contract 2 Party A: Party B:

In order to speed up the pace of forestry construction, revitalize the rural economy, realize common prosperity at an early date and strengthen greening management, Party A and Party B have reached the following contract agreement through consultation.

First, the basic situation and use of contracted forest land

Party A voluntarily subcontracts its legally operated land (place name) area (marked by the forestry department) to Party B.. The four boundaries of a piece of land in this area are: East _ _, South _ _, West _ _, North _ _ (see attached figure for details).

Second, the subcontract period

The time limit for Party A to subcontract the land to Party B is _ _ _ _ _ _ years, and Party A shall deliver the contracted land to Party B before _ _ _ _ _.

3. After Party B weeds the subcontracted land, Party A must plan and define their respective land boundaries.

4. The land shall be excavated and arranged by Party B, and the expenses shall be settled by Party B. ..

5. If it is necessary to dig roads (service roads) in Tongda forest area, the expenses shall be borne by Party B, and Party A must unconditionally give up the land where the roads pass.

Management of intransitive verbs

After Party B plants in this plot, both parties must be fire-proof, theft-proof and harmless to people and animals, and Party B is responsible for tending and weeding.

Seven. Rights and obligations of Party A and Party B

1. Party A shall respect Party B's autonomy in production and operation, and shall not interfere with Party B's normal production and operation activities according to law.

2. Party B shall enjoy the autonomy of production and operation, the right of product disposal and the right of product income according to law.

3. Party B shall enjoy various subsidies for supporting agriculture and benefiting farmers provided by the state and local governments according to law, and Party B shall receive custody and care fees.

4. After the expiration of the contract, if Party B needs to continue to contract, and Party A agrees to continue to transfer it to Party B for contract operation, it will continue to subcontract according to this contract.

5. In order to protect the legitimate rights and interests of both parties, this agreement must be notarized by the judicial department.

6. Camellia oleifera and fruit trees planted by Party B are divided into _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

8. If Party B subcontracts part or all of the contracted land management right to a third party within a certain period of time, it shall obtain the consent of Party A and sign a written agreement, and the contract between Party A and Party B is still valid.

Nine. responsibility for breach of contract

1. If losses are caused to the other party due to non-performance of the contract, the responsible party shall be liable for compensation.

2. If Party A illegally interferes with Party B's production and business activities and causes losses to Party B, Party A shall compensate for it.

3. If Party A and Party B breach the contract, they shall pay the other party a penalty of 30,000 yuan per mu.

X. other terms and conditions

1. For matters not covered in this agreement, both parties may supplement it separately, and the supplementary part has the same legal effect as this agreement.

2. Through negotiation, this contract is made in quadruplicate, one for Party A and Party B, and one for the village committee and judicial department where Party A is located.

This agreement shall come into force after being signed and sealed by both parties.

Party A's signature or seal: Party B's signature or seal:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Farmland Planting Contract 3 Party A:

Party B:

1. Party A will contract 1600 mu of cultivated land belonging to _ _ _ _ _ _ _ to Party B as a whole, and Party B will be responsible for planting, field management and harvesting. From planting to harvesting is a complete field crop management contract cycle;

2. Party A shall provide cultivated land, seeds and fertilizers.

3. Party B is responsible for sowing; Application of chemical fertilizer; Daily field crop management and harvesting, such as weeding, watering and spraying pesticides;

Four. Party A shall pay Party B the field management fee of 600 yuan per mu of land. The management fee is paid in three times, 45% of the field management fee is paid when the seedlings are planted and the survival rate of the crops is over 85%, 35% of the field management fee is paid when the crops enter the picking period, and 20% of the field management fee is paid after the crops are harvested.

5. When Party B plants the seeds or seedlings provided by Party A, the survival rate is required to be above 85%. If the survival rate is lower than 85%, Party A refuses to pay the management fee, recovers the management contracting right, and investigates the economic losses caused by Party B to Party A. During the normal site management period, if Party B neglects the site management, Party A will recover the site management right of Party B and investigate the economic losses caused by Party B to Party A;

6. The land contracted by Party B shall be planted by Party A, and Party B shall be responsible for the management and harvest of daily field crops such as planting, fertilizing, weeding, watering and spraying;

Seven, the two sides agreed that the average yield per mu of Lycium barbarum was 1200 kg, and the average yield per mu of three-year-old Ural licorice was 2400 kg. For the excess yield, Party A will reward Party B according to 10% of the market price, and if it is lower than the agreed requirements per mu, Party A will deduct it from the field management fee according to 10% of the market price.

Eight, according to the above agreement, Party B completed the planting according to the requirements of Party A, and the survival rate of crops was above 85%. Party A shall pay 45% of the site management contract fee to Party A before June 10, 20 _ _, totaling 432,000 yuan.

This contract is made in duplicate, one for each party.

Party A:

Party B:

Cultivated Land Planting Contract 4 Party A: Party B:

In order to build a vegetable base and fully implement the contract responsibility system, Party A and Party B have reached the following agreement on vegetable planting through friendly negotiation:

I. Rights and obligations of Party A

1. Party A will be located at

2. Party A is responsible for providing production materials (including production tools, fertilizers, seeds, pesticides and other agricultural materials).

3. Party A is responsible for providing Party B with convenient conditions for watering, fertilizing and pesticide application.

4. Party A is responsible for reviewing the planting plan and providing technical guidance.

Party A must provide good technical services and high-quality agricultural products.

6. Party A is responsible for the distribution and transportation of vegetables.

Two. Rights and obligations of Party B

1. Party B is responsible for planting as planned, and completing daily field crop management and harvesting (including general production tools required for field management) such as sowing, fertilizing, weeding, watering and spraying with good quality on time.

2. Party B is responsible for completing the total output of vegetable planting. (Can be subdivided by vegetable varieties)

3. Party B is responsible for picking vegetables regularly and quantitatively according to Party A's requirements. Please do not pick, sell or take away.

4. Party B is responsible for the survival rate of seeds and seedlings above 90%. If Party B neglects field management and the survival rate fails to meet the requirements, which affects the vegetable yield and causes losses to Party A, Party A has the right to refuse to pay the contract fee and hold Party B accountable.

Third, reward and punishment measures

1. When Party B completes the specified output, the annual remuneration shall be settled by/mu, calculated on a monthly average, and paid the next month.

2. After Party B has overfulfilled the output, Party B will get 30% at the rate of 37%, which will be converted into cash per catty 1 yuan.

3. If Party B does not obey Party A's instructions, Party A has the right to terminate the contract.

4. If Party B fails to complete the site management according to the requirements of Party A's technicians, Party A has the right to supervise and give certain financial penalties (50 yuan is deducted every time), and Party A has the right to terminate the contract if it fails to change after three consecutive warnings. The losses shall be borne by Party B. ..

5. If Party B neglects the field management and the survival rate fails to meet the requirements, which affects the vegetable yield and causes losses to Party A, Party A has the right to refuse to pay the contract fee and hold Party B accountable.

6. Under the management of Party B, the part with higher yield per mu will be rewarded to Party B as a bonus according to the market price of 1/3; The part below the planned yield per mu shall be deducted from the contract fee according to the market price.

Four. Term of contract:

The term of this contract is one year (starting from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _). Once signed, it cannot be changed. After the expiration, under the same conditions, Party B will give priority to the renewal.

Verb (short for verb) others

1. If one party requests to change or terminate the contract, it shall notify the other party one quarter in advance, and the other party shall reply within seven days after receiving the notice of change or termination of the contract. Failing to reply within the time limit shall be regarded as breach of contract.

2. If there are any matters not covered in this contract, both parties shall make supplementary provisions after consultation, and the supplementary provisions shall have the same effect as this contract.

3. This contract is made in duplicate, one for each party, and it will come into effect after being signed and sealed by both parties.

Signature of Party A's representative:

Signature of Party B's representative:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

5 Farmland Planting Contract of Party A (the Employer):

Party B (contractor):

In order to clarify the responsibilities of both parties, safeguard the interests of both parties and avoid disputes, both parties reached relevant agreements through consultation on the premise of equality, voluntariness and mutual benefit, and both parties should abide by them and strictly perform them. The terms of the agreement are as follows:

I. Contents of contracted projects:

Party A will contract to plant forests now. _ _ _ _ _ to plant, maintain and pick vegetables for Party B at its base.

Second, the contract cost and benefit distribution

1. The land rent shall be paid by Party A;

2. According to the monthly vegetable production target task list, check the vegetable planting target output completed by Party B.. See attached table 1 for details. (It is subject to weighing, and rotten vegetables are not counted. If the output fails to reach the target value due to Party B's negligence in site management, Party B shall bear the losses caused to Party A. ..

3. The vegetables produced by Party B can only be supplied to Party A, and Party A will buy Party B's vegetables at the price of each different variety of vegetables. See attached table 2 for the price list.

4. Party A shall pay Party B a monthly living allowance of 65,438+0 500 yuan, and provide gas, rice, cooking facilities and equipment, and each person shall provide self-produced vegetables every day, and other Party B shall solve it by itself;

5. The time from land reclamation to vegetable harvest is 10 day. Party B shall complete the contracted land reclamation and plant vegetables as required. Party A pays Party B the land reclamation fee of 4,000 yuan/person/month. If it is not completed on time, pay according to the workload and complete the workload conversion.

6. Before 10 every month, Party A has settled the expenses, commissions and living expenses of vegetables purchased from Party B's planting place last month.

Three. articles of agreement

Start and end time of contracting: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

Four. Rights and obligations of Party A and Party B

(I) Rights and obligations of Party A

1. Party A is responsible for making planting plan, input of production materials and technical guidance.

2. Party A shall provide quantitative means of production, including seedlings, fertilizers and pesticides, and all expenses shall be borne by Party A. ..

3. Party A shall provide Party B with means of production, production tools, irrigation facilities and farmland facilities;

4. Party A shall supervise Party B's planting production, and solve the problems and emergencies in the planting process of Party B in time. Party A shall be responsible for the sales of land products, and Party B shall collect them according to Party A's orders, and Party B shall not pick and sell them without authorization. If Party B has sales channels and the price is higher than the purchase price of the seller designated by Party A, Party B shall make feasible suggestions to the company.

5. Party A shall provide Party B with basic living conditions such as accommodation (husband and wife's room), water and electricity (if the electricity consumption in the dormitory exceeds the specified level, it shall be borne by itself).

6. Party A shall provide a separate public kitchen for all vegetable farmers who contract greenhouses, and Party B shall solve the rest by itself;

(II) Rights and obligations of Party B

1. Party B must carry out scientific planting in strict accordance with the production plan formulated by Party A, and complete the management and harvest of field crops such as garden cleaning, soil preparation, sowing, seedling raising, fertilization, weeding and watering (excluding pesticides only) on time with good quality and quantity;

2. In the process of planting, Party B must carry out relevant work according to the guidance of technical personnel appointed by Party A, and shall not violate technical principles without authorization, and cooperate with Party A to do a good job in measuring various indicators of crop growth during planting, and shall not be hindered by any post;

3. Party B must keep the shed and related accessories and production tools intact, and shall not be damaged or lost. If the above situation occurs due to man-made or inadequate supervision, compensation should be made at the price or maintenance should be made at one's own expense.

3. If Party B fails to complete the field planting management as required by Party A, Party A has the right to supervise and give economic punishment (RMB yuan each time) and two consecutive warnings, and Party A has the right to terminate the contract relationship, and all losses shall be borne by Party B;

4. In the process of planting, Party B must observe the growth of vegetables at any time, report the diseases and pests to the technicians in time once they are found, and carry out prevention and control according to the requirements of the technicians. If Party B fails to detect pests and diseases in time due to its negligence, resulting in reduced vegetable production, relevant losses shall be borne by Party B. ..

5. During the working period, Party B shall pay attention to production safety and prevent accidents such as pesticide poisoning, food hygiene, self-disease and traffic accidents. In case of the above situation, Party A has nothing to do with it, and all expenses and responsibilities shall be borne by Party B. ..

6. Party B should have good knowledge and experience in vegetable planting, avoid resource waste with the concept of cost saving, and strive to maximize the economic benefits of the greenhouse. If the output value of the greenhouse planted by the contractor in that year is lower than the average output value of the planted varieties in that year 10%, the contractor's contracting qualification for the next year will be cancelled in principle.

7. Party B must carefully read and understand the management system of greenhouse planting contractors provided by Party A, or other notices and regulations that affect others' work or life (among which the commuting time does not need to be unified), and strictly abide by them.

8. This agreement is made in duplicate and shall come into force as of the date of signature by both parties. If one party requests to terminate the cooperative relationship in advance, it must negotiate two months in advance, and the offender will bear all the consequences. For matters not covered in this agreement, Party A and Party B shall negotiate and make supplementary provisions, which have the same effect as this agreement.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Farmland Planting Contract 6 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In order to * * * complete the greening landscape project of the new campus of the Party School of Pingxiang Municipal Committee quickly, on time and with high quality, and reach the acceptance standard, and at the same time, for the friendship between the two parties, no dispute occurs, the following agreement is reached:

1. Construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Employer: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

3. Project contracting method: contracting for work and materials (lump sum).

4. Contract quantities: The unfinished greening quantities of the new campus are subject to the third edition design drawings dated June 20, 2000, including new seedlings (both parties agree and sign on page 3 of Annex I). The number of seedlings is for reference only, and the actual amount is subject to the quality standards required by the design. If there are any trees provided by Party A, the price of seedlings in the list determined on page (2) of Annex II shall be deducted).

5. Party A shall fulfill its obligations: Party A has enough water to supply and place the nursery stock site 24 hours a day, and use electricity for overtime. After Party A has no objection to the acceptance of Party B's seedlings, Party A shall pay the money according to the agreed time (except holidays).

6. Party B shall fulfill its obligations: Party B shall pay attention to cleanliness and civilized construction. Seedling size is designated by Party A, and the quality shall not be changed at will. Only after the change is approved by Party A can the seedlings be changed. The seedlings shall not be sick, and the red flowers and green leaves shall be guaranteed.

7. General contracting cost: The total cost is RMB five hundred and twenty thousand Yuan only. (excluding tax).

8. Payment method: 60% of the project progress. After the seedlings enter the first car, they will be paid in installments from the second car (60% of the cost). 90% of the total project cost shall be paid within 65,438+05 days after the project completion acceptance, and the remaining 65,438+00% deposit shall be paid within 65,438+05 days after the one-year acceptance of seedling maintenance.

9. Other unfinished matters shall be settled through negotiation.

10. This contract is made in duplicate, with each party holding one copy and abiding by it together!

Signature (seal) of Party A's representative: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signature (seal) of representatives of Party A and Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

_ _ _ _ _ _ _ _ _ _ _ _ _

Seventh Contract of Farmland Planting Contract (Party A):

Contractor (Party B):

This Contract is concluded through fair negotiation in accordance with the Rural Land Contract Law of People's Republic of China (PRC), relevant laws and regulations and relevant national policies.

First, the basic situation of contracted trees

The specific location of trees and trees.

Second, the use of contracted forests.

The contracted trees must be used for forestry production, and Party B must strengthen the management and protection of forest land and earnestly implement the management and protection measures of forest land. After logging, reforestation must be carried out in the current year or the following year.

Three. Rights and obligations of both parties

1. The ownership of the contracted trees belongs to Party B. ..

2. Party A has the right to inspect and supervise Party B's management and protection of trees and woodland according to the contract, and has the right to stop Party B from damaging trees; Party A shall safeguard Party B's forest right, and shall not illegally change or terminate the contract, respect Party B's autonomy in production and operation, and shall not interfere with Party B's normal forestry production and operation activities according to law.

3. Party B must carry out afforestation according to the unified plan, select excellent varieties of afforestation seedlings and ensure the quality of seedlings. The height of seedlings should reach more than 3.5 meters, and the ground diameter should reach more than 2.5 cm. After planting,1.2m shall be uniformly painted and marked with red paint to achieve uniformity.

4. During the contract period, Party B shall strengthen management and protection to ensure that the contracted trees are intact. If any defects are found, Party B shall replant them in time. In accordance with the relevant technical regulations, pruning, painting, pest control, etc. It is carried out on trees to ensure that straw and burned trees cannot be burned during the wheat harvest or autumn harvest season.

Four. any other business

1. Both parties must strictly perform the contract. If one party breaches the contract, it shall pay the observant party a penalty of 5,000 yuan, and if losses are caused to the other party, it shall be liable for compensation.

2. This contract shall come into effect as of the date of signature by both parties. For matters not covered in this contract, both parties shall sign a supplementary agreement through consultation, and the supplementary agreement signed according to law has the same legal effect as this contract.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

8. Party A's farmland planting contract (place of borrowing soil): _ _ _ _ _ _ _ _ _ _ _ _

Party B (Leased Location): _ _ _ _ _ _ _ _ _ _ _

Party A voluntarily sublets _ _ _ _ _ _ mu of land to Party B for planting and use, and Party A and Party B reach the following agreement:

1. The lease term of the land is _ _ _ _ _ _ years (from _ _ _ _ _ to _ _ _ _ _ _ _). During the lease term, Party A and Party B shall not violate the contract privately, and bear the economic losses if they violate the contract.

2. The rent is RMB _ _ _ per mu per year, and the annual rent shall be paid before _ _ _ at most. During the contract period, according to the market situation, the rent of contracted land shall be calculated separately.

3. During the lease period, Party B shall not dig sand and borrow soil, which will damage the topography. During the lease period, Party A shall not ask about Party B's production and operation, and its industry must comply with national laws and regulations. If the contract expires, Party B will restore the original appearance of the land.

4. The ownership of the land always belongs to Party A. In case of land requisition, coal mine collapse or other force majeure natural disasters during the contract period, the land compensation fee shall belong to Party A, the compensation fee for ground attachments and related economic losses shall belong to Party B, and this contract shall be automatically terminated.

5. This contract is made in duplicate, one for each party, and it will come into effect after being signed. If there is any objection, it shall be handled by the local judicial organ.

6. After the expiration of the land contract, if Party A leases the land again, Party B has the priority to lease the land at the same price.

Party A: _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _

Farmland Planting Contract 9 Party A: _ _ _ _ _ _ _ _ _ _ _ _

Party B: _ _ _ _ _ _ _ _ _ _ _

In order to develop the economy and benefit the members, a vegetable planting contract is signed in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

1. Party A's responsibilities: Party A provides Party B with a vegetable base of _ _ _ _ mu, and Party B is engaged in vegetable cultivation.

2. Party A provides Party B with water, electricity, roads, labor export and vegetable business projects.

Three. Party B's responsibility: Before planting, Party B shall subsidize Party A's young crops fee of RMB/mu.

4. During planting, Party B shall provide seeds, pesticides and fertilizers free of charge.

5. Party B shall pay the pre-planting management fee at the rate of RMB yuan per finished vegetable (RMB yuan per mu).

6. The term is _ _ _ _ _ months, counting from _ _ _ _ _ _.

7. Both parties shall abide by the above terms, and the penalty for unilateral breach of contract is RMB _ _ _ _ per mu.

VIII. This contract is made in duplicate and signed by both parties.

Party A (official seal): _ _ _ _ _ _

Party B (official seal): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

Legal representative (signature): _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Farmland Planting Contract 10 Employer: (hereinafter referred to as Party A)

Contractor: (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant regulations, and in combination with the specific conditions of this project, this contract is hereby signed by both parties through consultation for their compliance.

Article 1 General situation of the project

1, project name:

2. Project location:

3. Scope and content of project contracting: responsible for planting green seedlings and street trees.

4. Contracting method: Party B contracts labor services but not materials (that is, only contracts labor services).

Article 2 Project duration:

_ _ _ _ _ _ _ _ _-_ _ _ _ _ _ _ _ _ _ _

Article 3 Project contract cost:

1, seedling planting _ _ _ _ yuan /m2, including planting of trees, shrubs and ground cover plants (digging planting holes, planting, scaffolding and cold protection treatment), excluding street trees, * * * m2, totaling RMB.

2, street trees _ _ _ yuan/plant, * * * plants, a total of _ _ _ yuan.

The above two items add up to RMB _ _ _ (excluding tax).

Article 4 Payment and settlement of artificial planting price

1. After the contract is signed, Party A shall pay _ _% of the total contract cost to Party B before the project starts;

2. When Party B completes _ _% of the contract amount, Party A shall pay _ _% of the total contract price to Party B for artificial planting progress within five days;

3. After the project is completed, Party A shall pay Party B _ _% of the total contract cost for artificial planting within five days;

4. After the acceptance of the project, Party A shall complete the audit of the project settlement within seven days (according to the actual settlement amount). Pay off the remaining amount within three days after the project settlement.

5. If Party A fails to pay the artificial planting fee or other force majeure factors affect the progress of the project, resulting in Party B's shutdown or slowdown, Party A shall bear the losses.

Article 5 Planting quality and inspection and acceptance

1, the planting quality of this project is qualified;

2. Party B must carry out the construction in strict accordance with the construction drawings and operating procedures, and accept the on-site supervision and inspection of Party A;

3. After the project is completed, Party A shall organize the completion acceptance in time. After the acceptance, the project will be handed over to Party A for management, and Party B will not be responsible for the later maintenance.

Article 6 Matters for both parties.

1, Party A

(1) Handle land requisition, remove obstacles (including overhead and concealed obstacles), and provide coordination between concealed and concealed obstacles;

(2) Provide the construction site as required, and carry out backfilling and preliminary leveling of planting soil;

(3) Provide auxiliary materials (such as cranes, supports, straw ropes, base fertilizers, etc.). ) needed for seedling planting.

(4) Provide healthy and complete seedlings to the construction site.

(5) Organize the project completion acceptance, pay the project progress payment according to the date stipulated in the contract, and cooperate with Party B for completion settlement.

2. Party B

(1) Fine leveling of the construction site (rough leveling, large-scale earthwork handling and construction waste removal are not within the scope of work of Party B)

(2) Check the integrity of Party A's seedlings and receive them.

(3) Tree planting (including: digging planting holes, planting, erecting supports, winding straw ropes and watering roots)

(4) Shrubs and ground cover plants planting (including: ground cover plants planting and root watering)

(5) Ensure the quality of the project, and complete the delivery as scheduled according to the time stipulated in the contract;

(6) Responsible for the site management and cleaning before the completion of the project;

Article 7 In case of any dispute during the performance of this contract, Party A and Party B shall settle it through negotiation in time. If negotiation fails, it shall be arbitrated by an arbitration institution determined by both parties through consultation.

Article 8 Supplementary Provisions

Matters not covered in this contract shall be implemented in accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations.

This contract shall come into effect after being signed and sealed by both parties. After the completion of the contract project, it will be submitted for inspection, and the final payment of the project will naturally become invalid after settlement.

This contract is made in duplicate, one for each party.

The Employer (Seal) and the Contractor (Seal) _ _ _ _ _ _ _

Authorized representative (signature): _ _ _ _ _ _ Authorized representative (signature): _ _ _ _ _ _ _ _ _

Date of contract signing: _ _ _ _ _ _ _ _ _ _ _ _

;