Current location - Recipe Complete Network - Dinner recipes - What is the circular template like?
What is the circular template like?
Today, Mr. Shao received feedback from customers, saying that the template was not broken, but it was damaged when the template was dismantled. I feel sorry for Mr. Shao. After all, this template is expensive, and it's really a pity if it is damaged after only three or five times.

So Mr. Shao wrote an article today to teach you better demoulding and maintenance of cylindrical wood formwork.

First of all, the cylindrical wooden formwork should be coated with release agent before formwork support, which is not only easier to demould, but also plays a certain role in formwork maintenance.

Secondly, the correct form removal sequence should be:

Dismantle the well frame, wood square and steel belt around the template in turn, then let it stand for 2-3 hours, and the template will naturally unfold and slowly demould. When the formwork is poured with concrete, the concrete will expand to a certain extent, so that the concrete will fit closely with the formwork. However, as the concrete slowly solidifies and the temperature drops, the formwork will naturally fall off under the action of thermal expansion and cold contraction. If there is no natural demoulding, you can easily remove the template by tapping the side of the template with a wooden square.

Remember: it is strictly forbidden to pry open the template with a crowbar or steel pipe violently, which will seriously damage the concave-convex groove of the template and affect its future use! ! Remember, remember!

Mr. Shao, there are many bloody cases here. I can show you. Treat your old irons to some snacks.

Tip: The concave-convex groove is the most important part of our cylindrical wooden formwork. Please pay attention to protect the concave-convex groove. After form removal, the position of concave-convex notch must be cleaned to ensure that the template can be fastened smoothly next time.

Many customers will ask how to store temporarily unused templates. Today, Mr. Shao told everyone that when the templates are stored in the warehouse of our factory, they can be arranged vertically, as shown in the following figure:

Round template, choose Taber, no problem!

In 20/0/7 years, KLOC served in Beijing Daxing International Airport Terminal Project, Jiaozhou International Airport Project, Poyang Railway Station Project, Zhenjiang high-speed railway station Project, Xingcheng high-speed railway station Project and other national infrastructure projects.

Linyi Taibo Building Materials focuses on the research, development and production of wood formwork. Please contact: Tel/WeChat: 180-0539-6959. Welcome to add WeChat. Wechat shares the latest customer cases every day.

Scan the QR code below to add friends, give away samples and promotional materials for free, and invite distribution agents to cooperate in blank areas across the country! Tel/WeChat: 180-5393-9094