Current location - Recipe Complete Network - Fat reduction meal recipes - Kitchen decoration steps
Kitchen decoration steps
1. Check whether there are cracks, hollowing, falling off and water seepage on the wall and ground after the acceptance of concealed trunking of water and electricity. If you are a commodity blank house.

2. Do a 24-hour closed water test on the kitchen floor to supervise the developer to complete this task.

3. According to the actual hydropower demand, the hydropower line is reformed. Just ask the hydropower master and get a general idea.

4. Buried trunking concealed water and electricity, and no leakage was found in the closed water experiment to start the kitchen waterproof project.

5, the kitchen wall disk, laying floor tiles.

6. the ceiling.

7. Install the door and door cover.

8. Install cabinets, sanitary wares, range hoods and gas water heaters (gas water heaters are generally placed in the kitchen).

9. Stick the adhesive (protective edge) to the door joint.

10. Switch socket for installation and debugging.

1 1, cleaning.

Preparations for kitchen decoration

1, style determines budget.

When decorating the kitchen, the public must choose their favorite and suitable style. This requires an understanding of the product styles in the market to see which product styles are suitable for your own kitchen decoration, how the prices of these styles are, and whether they are in line with your own budget, so as to facilitate the subsequent decoration.

Step 2 ask a professional

The style design and product selection of the kitchen are entirely up to you, but the direction and layout design of the kitchen should adopt the designer's opinion, because the structure of the kitchen can't be changed casually, otherwise it will affect the stability of the whole floor, so you should ask professionals to help the new layout of the kitchen and design the functions of the kitchen.

3. Preparation of decoration materials

After the designer designs the new layout of the whole kitchen, he needs to invite professionals to carry out the construction. The content of construction is generally to decorate the new layout of the kitchen, using tiles and paint for decoration. Then the sink drainage buckle, electrical sockets, circuits and other aspects should also be constructed to meet the requirements of the owners, thus basically completing the transformation of the kitchen.

4. Buy kitchen utensils such as cabinets.

Since we want to decorate the kitchen and change the style of the kitchen, we must buy suitable cabinets, and because the layout of the kitchen has changed, the original cabinets may not be suitable, so when buying new cabinets, we must contact cabinet manufacturers, customize or buy ready-made cabinets, and pay attention to the style of cabinets, which should be consistent with the indoor style except what we like.

Step 5 buy electrical appliances

The first few steps of the kitchen layout have been completed, including orientation, drainage mode and wiring layout. You can buy kitchen appliances such as refrigerators and ovens and corresponding household appliances. Note that the size of the refrigerator should match the size of the kitchen space, and the power should not exceed the household power, which is to protect the wiring safety of the kitchen.

What should I pay attention to when decorating the kitchen?

1, before decoration, we must check the grassroots, such as the flatness, verticality and firmness of the wall, whether the wall is painted and whether it is qualified. When the kitchen design water circuit is reformed, the designer of the cabinet should be present at the same time as far as possible, and the hydropower reform scheme should be determined according to the design of the cabinet.

2. It is suggested that the kitchen floor must be waterproof. The waterproof of the ground should extend to the wall 30 cm, and the installation position of the cabinet sink should be waterproof to the height of 1 meter. Because most of the water pipes in the kitchen are hidden in the cupboard, once they leak, they will leak downstairs through the contact part between the gas main pipe, the sewer main pipe and the flue and the floor, causing damage to the cupboard downstairs.

3, after the ground waterproof, must do 24-48h closed water test, check whether there is leakage; The height of cabinet countertops should be humanized according to specific users; Do not remove the check valve in the kitchen flue (whether the exhaust port of the range hood is equipped with a check valve or not).