Basic situation of Fuzhou bridge
Pazhou Bridge crosses Pazhou Waterway in the north-south direction, which is the main urban road connecting the West Road around Nansha Island and Longxue Avenue in Longxue Island Port Area, and connects Humen Expressway in the long term, with a total investment of about 400 million yuan. The total length of the route is 4,200m, of which the total length of waterway crossing Weizhou is 2,774m, and the total length of ground road is1.426m.. The construction will be divided into two parts at the same time. On one side, there are the main bridge of Weizhou Bridge, the north approach bridge and the north approach bridge (approach 685m, bridge length1394m), and on the other side, there are the south approach bridge and the south approach bridge of Weizhou Bridge (approach length 74 1 m, bridge length1380m). The bridge deck is designed to be 60 meters wide, including 6 meters of sidewalks, 4.5 meters of green belts and one-way carriageway 15.5 meters.