(Chaoyang-Yuzhu)
The second phase of 13 line runs east-west, starting from Chaoyang and ending at Yuzhu Station, the first phase of the project, mainly passing through the urban core area. There are key development areas along the line, such as Baiyun Lake Area, Luochongwei Comprehensive Reconstruction Area, Beijing Road Cultural Core Area, Zhujiang New Town, International Financial City and Huangpu Lingang Business District.
Latest progress
37% of the civil works have been completed. Of the 23 stations, 3 have been capped, 18 is under civil construction, and 2 stations are making preliminary preparations; Of the 23 sections, 3 sections have been connected with the entrance and exit lines of Huanggang parking lot, and 13 is under civil construction, while the other 7 sections are under preliminary preparation. Yuzhu parking lot, Huanggang parking lot and upper cover shall be subject to civil construction.
Dongyan section of Line 5
(Wenchong-Huangpu Passenger Port)
The line starts from wenchong station on Line 5 and ends at Huangpu Passenger Terminal, with a total length of about 9.76 kilometers. There are 6 stations on the whole line, including Shuang Gang, Miaotou Road, Xia Yuan, Baoying Avenue, Guangzhou Development Zone and Huangpu Bus Terminal, with 6 trains running at a maximum speed of 90 kilometers per hour, which will realize the rapid connection between our district and the central city.
Latest progress
37% of the civil works have been completed. Civil construction is carried out at 6 stations along the whole line; Of the six blocks, four blocks are for civil construction, and the other two blocks are for preliminary preparation; In and out of the interval line and Shuang Gang parking lot for civil construction.
Line 7 phase 2
(south of the university-northwest of the water)
The second phase of Line 7 starts from the south of mega Center of Higher Education and ends at Shuinorthwest Station, with a total length of 22 kilometers, all of which are underground lines. There are altogether stations 1 1 in Shenzhen, Changzhou, Hongshengsha, Yufengwei, Dashadong, Tangji, Jiazhuang, Kefeng Road, Luogang, Shuixi and Shuinorthwest, among which 7 transfer stations can be connected to Guangzhou-Dongguan-Shenzhen Intercity Pazhou Branch Line, Line 8 East Extension Line and/kloc-0. It consists of six sections, and the maximum running speed is 80 kilometers per hour.
The second phase of Line 7 is conducive to solving the traffic demand of the north-south corridor in the east of Guangzhou and promoting the construction of Guangzhou-Foshan integration.
Latest progress
53% of the civil works have been completed. 1 1 station, 2 stations have been capped and 9 stations are under civil construction; Within the range of 1 1, 1 refers to civil construction, and1refers to preliminary preparation. Tangji civil construction parking lot.