The operating schedule of Nanchang Metro Line 2 is from 6: to 22: 3.
The operation time design of Nanchang Metro Line 2 fully considers the travel needs and habits of citizens, and it starts operation at 6: in the morning, which can meet the travel needs of citizens in the morning rush hour and facilitate office workers and students to reach their destinations quickly. Closing the operation at 22: 3 pm can ensure that citizens still have enough public transportation options to return home after traveling at night.
It is worth mentioning that the operation hours of Nanchang Metro Line 2 are also well connected with other public transport vehicles in the city, such as buses and taxis, which provide citizens with a more comprehensive and convenient way to travel. At the same time, Nanchang Metro also adjusts its operating hours for holidays and special events according to the actual situation, so as to better meet the travel needs of citizens.
Introduction to Nanchang Metro Line 2
Nanchang Metro Line 2 is the second subway line completed and put into operation in Nanchang, Jiangxi Province, China. The first section (from Nanlu Station to Metro Tower Station) was opened to traffic on August 18, 217, and the later section (from Metro Tower Station to Xinjiaan Station) was opened to traffic on June 3, 219, with the line logo color yellow.
As of June 219, Nanchang Metro Line 2 starts from South Road Station, passes through Honggutan District, central and western donghu district, northeastern Xihu District and central and western Qingshan Lake District, and ends at Xinjiaan Station. With the Ganjiang River as the boundary, the line generally runs north-south on the west bank and east-west on the east bank. As of June 219, the total length of Nanchang Metro Line 2 is 31.51 kilometers, and there are 28 stations (including transfer stations), all of which are underground stations.