There is good news for you about Shenyang people’s travel!
Shenyang is about to start the construction of Metro Lines 3 and 6!
Our goal is that before the end of this year, Shenyang will strive to start the first phase of the southern extension of Metro Line 2 and Lines 3 and 6.
In addition, Shenyang will continue to promote the construction of Metro Lines 4, 9, and 10, and the northern extension of Line 2, with a total construction mileage of 96 kilometers, and the operating mileage of the subway line network will reach 151 kilometers.
So, what is the direction of Shenyang Metro Lines 3 and 6?
Xiaobei also brought super spoilers today!
The first phase project of the east-west Metro Line 3 is one of the four horizontal lines. The line connects important nodes in the city on the south side of the core area. The line is 38.4km long and has 28 stations.
The first phase of Shenyang Metro Line 3 (BMW Avenue-Xintai Street) runs east-west with a total length of 38.4 kilometers.
Take No. 25 Road, Xihe Road, Wanghe Road, Shayang Road, Wenhua Road, and Wenhua East Road, connecting BMW New City, Sino-German Industrial Park, Sino-French Ecological Park, Yuhong New City, Shashan area, Wenhua Road area, and South
Tower, East Tower and other key areas.
Gliding, Shashan, Nanhu, and Liming are all relatively old traditional residential areas in Shenyang with high population density. Metro Line 3 will make it more convenient for residents along the line to travel; Wuai Market is the largest clothing wholesale market in Northeast China. This time Metro Line 3
After passing through the Wu'ai area, you can go shopping on Wu'ai Street in the future, and finally you don't have to worry about not being able to get a taxi. Although emerging areas such as Zhangshi Development Zone and Yuhong New City are developing rapidly, there are not many bus lines yet, and residents do not have much time to travel.
It is not very convenient, especially after the properties under construction are moved in. Metro Line 3 will greatly ease the travel pressure in these areas; the first phase of Line 6 is the planned north-south longitudinal line of the city, with a total length of 36km and a total of 32
A station and two lines form the core area of ??Shenyang, a rapid east-west connection channel in the south!
The first phase of Shenyang Metro Line 6 (Yalujiang Street-Yingchun Street) runs from north to south, with a total length of 36 kilometers.
Walk along Yalujiang Street, Xiaoshizi Street, Danan Street, Changbai Middle Road, and Yingchun Street, connecting Capital Xincheng, Fangcheng area, Nanta area, Changbai Island, Caozhong, Manrong area and Sujiatun.
Line 6 is a cross-river line. In the future, it will greatly alleviate the congestion on the cross-river bridge during the morning and evening peak periods and disperse the passenger flow; the construction of Line 6 has shortened the distance between Sujiatun Sub-city and the main urban area.
It also makes it easier for residents in the northern part of the main city to travel to and from Sujiatun District. From now on, they can just take the subway and go to Su District to eat the special cold noodles with meat sauce!
There are many delicious food in Changbai area. This year’s Shenyang Marathon course even passes through Changbai. In the past, when I mentioned that the party was in Changbai, I was afraid of how to get there. Now, it is smooth and convenient. If you are lucky, you can also go to Changbai Island Park for a stroll and see small animals.
, simply perfect!
The southern extension line of Metro Line 2 leads directly to the airport. According to the previous plan, the southern extension line project of Shenyang Metro Line 2 (Quanyun Road-Taoxian Airport) starts from the end of the first phase of the project in the north (southern end of Quanyun Road Station) and ends in Taoxian in the south.
Taoxian Airport Station on the east side of Terminal 3 of Xian Airport connects Shenyang International Software Park, National Games Village, Citizen Square, Science and Technology Park, and Taoxian International Airport. It has a total length of 14.2 kilometers and includes Taoxian Street Station and Gaoshen East Road.
Station, Quanyun 3rd Road Station, Citizen Square Station, Science and Technology Park Station, Aviation Industrial Park Station, New Terminal Station, Taoxian Airport Station, ***8 stations.
After the completion of the South Extension Line, it will be in operation with the first phase of Line 2.