Formulation of winter construction scheme
The construction scheme is formulated according to the Code for Winter Construction of Building Engineering (JJ104-2011), Code for Welding and Acceptance of Reinforcement (JJ18-2012), construction experience of technical and material support capacity, experience of similar projects, and various projects.
1. In the construction plan, you must first introduce the general situation of the project, such as the specific location and construction area of the project, such as the engineer's location in _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
2. In the winter construction plan, the start and end dates of the construction must also be specified, especially in winter, when the temperature is relatively high, if the temperature is below minus 20 degrees Celsius, workers are not allowed to continue the construction. According to previous years' experience,1October can generally enter the winter construction time around 1 15, and the construction time should be planned, for example, it must be completed within 50 days.
3. In terms of construction quality, the completed building quality must reach the national quality standard level. During the construction process, major engineering safety accidents must be eliminated and the engineering protection treatment should be done well. The total number of accidents causing minor injuries must be less than 1, and the occurrence of fire accidents must be absolutely eliminated;
4. Formulate a certain construction leadership organization system, and determine the group leader, organization management members and the specific matters they need to be responsible for. For example, the team leader must be fully responsible for the management of the project, while team member A must be responsible for the technical work. Members of group B arrange specific construction work and coordination work, while members of group C are responsible for the supply of materials. Group D is responsible for quality inspection, supervision and management during construction, group E is responsible for safety management during construction, such as fire prevention, and group F is responsible for technical data collection and archiving.
Through this article, do you know how to make a specific winter construction plan? Want to know more, log in to Tuba Rabbit!