Current location - Recipe Complete Network - Take-out food franchise - Name of Shenyang Metro Line 4 Station
Name of Shenyang Metro Line 4 Station
The project starts from Zhuertun Station in the north and ends at New Shenyang South Station in the south, with a total length of 32 kilometers. There are 23 stations, including: New Shenyang South Station, Xiaoyang 'an Station, Baitabao Station, Wang Shitun Station, Su Shen Road Station, Changbai South Station, changbai island Station, Changbai North Station, Shayang Road Station, Nanwuma Road Station, Taiyuan Street Station, Shifu Road Station, Huangmiao Road Station and Shenyang North Station.

The line mainly passes through important public transport hubs such as New Shenyang South Railway Station and Shenyang North Railway Station, and connects commercial areas such as Taiyuan Street and Shenyang North Railway Station, residential areas such as changbai island, Shashan, Wanghua and Hushitai, as well as Hunnan Industrial Zone and EU Industrial Zone. It is expected to extend to Tieling in the north and Liaoyang, Anshan and Benxi in the south in the future. ?

Construction process:

Shenyang Metro Line 4 is one of the most important backbone lines in Shenyang metro network. Since the release of the new subway plan in 2008, Metro Line 4 has been the expected construction route of Line 3, and the pre-feasibility study report of the project was compiled by the Third Railway Survey and Design Institute. In 2009 and 20 10, the news that "Line 4 strives to start construction within this year" came out from time to time.

However, after Liaoning's successful bid for the 20 13 National Games, the first phase of Line 4 has been decided to be built after the 20 13 National Games, with a planned construction period of 20 13-20 18.

And included in the construction line planning before 2020. On June 20 10, after the establishment of Quanyun Village in Hunnan New Town, the planning of Hunnan was completely revised, and the lines related to Hunnan, such as Line 4 and Line 8, were also greatly adjusted, so the planning of this project has been invalidated.