Current location - Recipe Complete Network - Catering franchise - safety protection
safety protection
In the era of continuous progress, more and more people will use the letter of guarantee, which is a written commitment. So do you know the standard formal guarantee format? The following are eight security papers I collected for you, which are for reference only and I hope they will help you.

Security letter 1 1. Say hello to your parents when you go out, and don't go out privately or alone. Go out with the consent of your parents, don't go the same way as strangers, and always pay attention to safety.

2. Be vigilant when staying at home alone during holidays, don't open the door to strangers, don't play unsafe games, don't touch unsafe items, and don't play in dangerous places. When using electrical appliances, they should be used safely in accordance with the operating specifications; Do not play with fire, prevent electric shock, theft and gas poisoning.

3. Students are prohibited from skiing and skating in dangerous areas such as lakes and reservoirs to prevent safety accidents such as ice breaking and drowning; If you ski in the ski resort, you must be accompanied by your parents and pay attention to safety.

Students are not allowed to buy fireworks without permission. Fireworks must be accompanied by parents, pay attention to safety.

5. Arrange work and rest reasonably, strengthen physical exercise, pay attention to eye hygiene, do not overeat, do not eat unqualified and expired food, and prevent food poisoning. Develop good living habits, pay attention to personal hygiene, be vigilant and prevent various infectious diseases.

6. Do not enter Internet cafes, video halls, electronic game halls, dance halls, billiards rooms and other places; Do not smoke or drink, and do not participate in various forms of gambling and feudal superstitious activities; Do not buy, watch or pass on "pocket books" and pirated CDs that are harmful to teenagers' physical and mental health; Stay away from drugs and refuse drugs.

7. Go online in a civilized way and consciously resist all kinds of bad cultural influences. Do not surf the Internet or use the computer at home for more than 1 hour, log in or browse unhealthy websites or webpages, chat online, play online games, make friends with netizens or unidentified friends, spread harmful remarks online or make personal attacks on others, and develop good online moral habits.

8. Do a good job in disease prevention and control, pay attention to personal protection: wash your hands frequently, ventilate frequently, avoid getting together, touch your face less and keep healthy.

Chapter II Safety Assurance According to the relevant regulations of natural gas companies on the safe use of natural gas, in order to ensure the safe use of natural gas by the owners/residents in the community, the residents must abide by the following regulations:

1. Without the permission of the natural gas company, it is strictly forbidden to change or close the natural gas pipeline and natural gas meter without permission, otherwise the natural gas company will not ventilate. Note: Natural gas meters and pipelines should be exposed, so that problems can be found and repaired in time.

Second, it is forbidden to use natural gas in house decoration, and effective measures should be taken to avoid the destruction of natural gas meters and pipelines.

Three, natural gas pipeline ventilation before use should be entrusted to the natural gas company professionals.

4. It is suggested that tenants use natural gas for the first time under the guidance of relevant personnel.

Five, it is forbidden to lay power lines beside the natural gas pipeline, and it is forbidden to store flammable items.

6. The natural gas meter is used by natural gas companies to measure the natural gas consumption, and cannot be disassembled and changed at will.

Seven, after each use of natural gas, should check whether to close the furnace valve and outlet pipe valve.

Eight, no one at home try not to open doors and windows indoors, so that once there is air leakage, it can spread out in time. Note: If the tenant's personnel violate the above regulations, resulting in abnormal ventilation and property losses, the owner shall take full responsibility.

Elegance Yuefu 20-1-110/

Owner xx signature

Date: 20xx year x month x day

Tenant signature

Date: xx

For the safety of me and other students, I promise to do the following:

1, no gangs;

2. Don't fight;

3, no tools are needed;

4, don't jump the gate, wall;

5. Don't go to video game halls and Internet cafes;

6. Don't play dangerous sports facilities without the teacher's guidance; Parents should raise their awareness of students' participation in student safety insurance and voluntarily and actively participate in F.P.A insurance.

7. I found that other students also have the above six behaviors. First of all, I dissuaded them. If they don't listen, I will report it to the teacher or the student affairs office in time.

I will resolutely do the above seven items. If I violate them, I will accept any treatment from the school and take full responsibility, which has nothing to do with the school and the class teacher. Student Signature: Parent Signature:

Signature of class teacher:

School signature:

Baoxin 4 Our company plans to build the basement and 3~4# buildings in the first phase of "Two-sided Needle Changfeng Yazhu" residential district. In order to do a good job of civilized construction on site, ensure the civilized and orderly construction process and establish a good image of metallurgical construction company, we hereby make the following guarantees to the construction company:

1, to ensure compliance with and implementation of the relevant provisions of the Building Safety Scoring Standard, the Guangxi Zhuang Autonomous Region Construction Safety Civilized Site Selection Law and the Guangxi Zhuang Autonomous Region Metallurgical Construction Company Site Civilized Construction Management Law.

2. Ensure that enough manpower, financial resources and material resources are invested in civilized construction to meet the requirements of civilized construction inspection score table (and attached table), in which the total score of each project is guaranteed to be above 40 points.

3. Designate a comrade as the person in charge of civilized construction to ensure that civilized construction reaches the standard and creates excellence.

4. The inspection of civilized construction on site shall be conducted at least once a week by the project department and at least once a month by the engineering company. During the inspection, you should fill in the Grid Table of Construction Management of Building Engineering carefully. Every inspection should be recorded and divided equally, and the person in charge of rectification and the time requirement for rectification should be indicated.

5. Accept the inspection of the construction company and the superior department at any time, take the problems found in the inspection seriously and make timely rectification.

6. Actively do a good job in the inspection, acceptance and appraisal of the superior construction administrative department. Our unit must actively and seriously do all the preparatory work to ensure that the reputation of the construction company will not be damaged.

7. Set up a 2.5-meter-high beautiful and generous fence at the construction site facing the main streets and entrances and exits of the city, and write the name and slogan of the construction site to establish a good image of the construction company.

8. Accept the supervision and management of relevant departments of the construction company and law enforcement agencies.

9, according to the provisions of the construction company, pay the civilized construction deposit.

The above guarantee, as a promise to do a good job in civilized construction on site, will be punished by the original construction company in accordance with relevant regulations and bear all economic responsibilities in case of any violation of laws and regulations during construction.

This letter of guarantee is made in triplicate, one for the construction technology department, the engineering company and the project department of the construction company.

Construction unit: (official seal)

Manager of construction unit:

Project leader:

Date, year and month

I am a student of xx-xx Department. 20xx-20xx's learning content this semester is to carry out off-campus accounting post training. In order to successfully complete the job training, I promise to do the following during the training:

First, strictly abide by the college's "Shougang Institute of Technology Student Training Discipline".

Second, obey the traffic laws and regulations, and there will be no violations and traffic accidents.

3. Abide by national and local laws and regulations, avoid illegal acts and public security problems, and consciously safeguard social morality.

Fourth, obey the arrangement of the instructor and training unit, stick to the post, and strictly implement the rules and regulations of the training unit and the labor discipline and safety operation procedures of the training post.

Five, pay attention to their own code of conduct, and consciously safeguard the public image and social reputation of Shougang Institute of Technology.

Six, if there is a violation of the above requirements, the consequences; Influence, accept the administrative treatment given by the college.

Signature of guarantor and signature of parents

Year, month, sun, moon, sun.

Safety letter 6 School of Electronic and Information Engineering, Huade College of Applied Technology, Harbin Institute of Technology

Safety Commitment of Computer Department Students' Internship

I am a student of computer application technology department, and I signed an employment agreement before. I worked as an intern in this company from.

The internship has been communicated with parents, who know it and agree to it. Consciously abide by the relevant regulations of the college on "off-campus internship", communicate with college counselors and responsible teachers regularly and report the internship. At the same time, promise:

1. Obey the arrangement of the internship unit, strictly abide by the safety management system and operating procedures of the internship unit and other relevant rules and regulations, and obey the command of the field staff. Pay attention to personal and property safety and cooperate with fire prevention and theft prevention.

2. Strictly abide by the work and rest system of the internship unit, and shall not leave the internship unit without authorization. If it is really necessary to leave the unit due to contact work or other reasons, you should ask for leave from the internship unit and leave after approval. You are not allowed to act alone or stay outside.

3. During the internship, observe the traffic rules; Don't swim in rivers, lakes, seas and other waters; Pay attention to food hygiene to prevent the spread of diseases.

4, words and deeds should be polite, not allowed to enter the commercial Internet cafes, not allowed to drink and make trouble. You are not allowed to participate in activities that are not commensurate with your student status, and you are not allowed to drink and make trouble. You are not allowed to participate in activities that are not commensurate with your student status.

5. Actively communicate with the graduation design teacher, complete and hand in the graduation design related materials on time according to the requirements of the graduation design teacher, and write an internship log according to the internship schedule (the log should be handed over to the class teacher according to the regulations).

6. During the internship, the students are responsible for their own injuries and academic problems caused by violating the internship management regulations and the safety rules of the internship unit, and the students and their parents are responsible for the economic and legal losses caused by the injuries of others or the economic losses of the country and enterprises.

Signature of guarantor: Tel: Signature of guarantor's parents: Tel:

Year and day

In order to implement the policy of "safety first, prevention first", in accordance with the requirements of laws, regulations and rules such as "Construction Law", "Safety Production Law" and "Regulations on Safety Production in Construction Projects", establish and improve the responsibility system for safety production, fully implement the safety responsibilities of all parties in construction activities, and strictly investigate the responsibilities to ensure the smooth construction of the project and ensure the personal health and safety of on-site operators. We promise to do the following:

First, ensure that the following personnel are in place, and assume relevant safety responsibilities in the construction of this project.

1. On-site representative of the construction unit: Tel:

2. Project leader: certificate number. : Tel:

3. Chief supervision engineer: certificate number. : Tel:

Two, the construction unit shall provide the construction unit with all kinds of underground pipeline information in the construction site and adjacent areas, and the construction unit shall take safety protection measures to protect it.

Three, the construction unit shall not put forward to the survey, design, construction, engineering supervision and other units that do not meet the requirements of laws, regulations, rules and mandatory standards for safety in production of construction projects, nor shall it compress the time limit agreed in the contract.

Four, the construction unit in the preparation of the project budget, to determine the safe working environment of the construction project and the cost of safe construction measures.

5. The project leader of the construction unit shall be responsible for the safe construction of the construction project, implement the responsibility system for production safety, rules and regulations for production safety and operating procedures, ensure the effective use of production safety expenses, organize the formulation of safety construction measures according to the engineering characteristics, eliminate hidden dangers of safety accidents, and report production safety accidents in a timely and truthful manner.

Six, the construction unit should be set up in accordance with the provisions of the project safety management institutions, equipped with full-time safety production management personnel, and earnestly perform the duties of safety supervision and management in the project construction, remember the site "safety diary".

Seven, the construction unit should be included in the safe working environment and the cost of safety construction measures in the construction project budget, for the purchase and update of construction safety protection appliances and facilities, the implementation of safety construction measures, improve the conditions for safe production, and shall not be used for other purposes.

Eight, the construction site safety shall be the responsibility of the construction unit. The general contractor shall be responsible for the implementation of the general construction contract. Subcontractors are responsible to the general contractor and obey the general contractor's safety management of the construction site.

Nine, the construction unit should do a good job in the "three-level education" and pre-job training for employees, so as to educate first and then take up their posts; Special operations personnel must undergo special safety operation training in accordance with the relevant provisions of the state and obtain the qualification certificate for special operations before taking up their posts.

Ten, the construction unit to prepare the safety technical measures in the construction organization design and the construction site temporary electricity scheme, for template engineering, lifting engineering and scaffolding engineering and other professional and dangerous partial projects to prepare special construction scheme, and attach the safety inspection results, signed by the technical director of the construction unit, chief supervision engineer, and supervised by full-time safety production management personnel. Major construction risks of partial projects must be demonstrated and reviewed by an expert group.

XI。 The technical personnel in charge of project management of the construction unit shall give a detailed explanation to the construction team, operators and technical requirements related to safe construction, which shall be signed by both parties for confirmation.

Twelve, the construction unit should be at the entrance to the construction site, construction hoisting machinery, temporary electricity facilities, scaffolding, passages, stairs, elevator wellhead, hole, bridge mouth, tunnel mouth, foundation pit, explosives and hazardous gas and fluid storage places and other dangerous parts, set up obvious safety warning signs. Safety warning signs must conform to national standards.

The construction unit shall take corresponding safety construction measures at the construction site according to different construction stages and changes of surrounding environment, season and climate. If the construction site temporarily stops construction, the construction unit shall do a good job in site protection.

13. The construction unit shall separate the office area, living area and working area of the construction site and keep a safe distance; do

The location of public and living areas should meet the safety requirements. Workers' meals, drinking water, rest places, etc. Should meet the hygiene standards. Staff quarters shall not be set up in uncompleted residential flats.

Temporary buildings on the construction site shall meet the requirements for safe use. Precast mobile homes used in the construction site should have product certificates.

Fourteen, the construction unit should abide by the provisions of the relevant laws and regulations on environmental protection, take measures at the construction site, fence work, three bags in front of the door, to prevent or reduce the harm and pollution of dust, waste gas, waste water, solid waste, noise, vibration and construction lighting to human body and environment.

Fifteen, the construction unit shall establish a fire safety responsibility system in the construction site, determine the person responsible for fire safety, formulate fire safety management systems and operating procedures for fire, electricity, flammable and explosive materials, set up fire exits, fire water sources, equipped with fire-fighting facilities and fire-fighting equipment, and set up clear signs at the entrance to the construction site.

Sixteen, the construction unit to buy and lease safety protection appliances, machinery and equipment, construction machines and accessories, should have a production (manufacturing) license, product certificate, and check before entering the construction site.

Safety protection appliances, machinery and equipment, construction machines and tools and accessories on the construction site must be managed by special personnel, regularly inspected, repaired and maintained, and corresponding data files should be established, and scrapped in time according to relevant state regulations.

Seventeen, the construction unit should be put on record before installing the tower crane, and then install. After passing the self-inspection, an inspection and testing institution with corresponding qualifications shall be entrusted for acceptance, and it can only be used after passing the acceptance. General contractors, subcontractors, lessors and installers shall accept the use of leased machinery and equipment, construction machinery and accessories. It can only be used after acceptance.

Eighteen, the construction unit should be engaged in dangerous operations in the construction site personnel for accidental injury insurance. The accident insurance fee shall be paid by the construction unit. In the case of general construction contract, the general contractor shall pay the accident insurance premium. The insurance period of accidental injury insurance is from the date of commencement of the construction project to the date of completion and acceptance.

19. In addition to urging the construction unit to carry out weekly inspection of the project department and daily inspection of the team, the supervision unit shall report the weekly inspection records to the supervision unit for the record, and jointly with the construction unit, conduct a comprehensive safety evaluation on the safety production situation in different construction stages (before construction, foundation leveling, main body capping and decoration) in the construction process as required, and record the evaluation results.

Twenty, engineering supervision units and supervision engineers shall carry out supervision in accordance with laws, regulations and mandatory standards for engineering construction, and assume supervision responsibility for the safe production of construction projects.

In the process of engineering construction, the supervision unit shall strengthen the inspection and inspection of the construction site, and urge the construction unit to strictly implement the safety technical measures in the construction organization design and special construction scheme that meet the mandatory standards of engineering construction after examination and approval. If hidden dangers of safety accidents are found, the construction unit shall be required to make timely rectification. If the situation is serious, the construction unit shall be required to stop the construction immediately and report to the construction unit in time. If the construction unit refuses to rectify or stop the construction, the project supervision unit shall report to the relevant competent department in time. Conscientiously implement the work report system of production safety supervision, and fill in the construction safety supervision report before 30 days of each month.

Twenty-one, in the case of not affecting the normal construction activities of the project, should cooperate with and support the safety supervision and inspection of the safety production supervision institutions.

22. In the construction of this project, we will strictly implement the Standard for Safety Inspection of Building Construction (jgj59-99) to ensure that it is qualified. Strive to create civilized construction sites at the municipal and provincial levels.

23. This guarantee is made in quadruplicate, one for the safety supervision station for the record, one for the construction site project department, one for the construction unit and one for the supervision unit.

Signature (seal) of the site representative of the construction unit:

date month year

Signature (seal) of the project leader of the construction unit:

date month year

Supervision Unit (Seal) Signature of Chief Supervision Engineer:

date month year

Food safety is related to the health and life safety of consumers, and to the development and stability of social economy. In order to protect the health rights and interests of consumers and ensure the safety of catering food, this unit solemnly guarantees that:

1. Strictly abide by the Food Safety Law of People's Republic of China (PRC), the Regulations for the Implementation of the Food Safety Law of People's Republic of China (PRC) and other laws and regulations, assume the responsibility of being the "first responsible person" for catering food safety, and implement various management systems for catering service safety.

2. Make sure to engage in catering service activities after obtaining catering service licenses, employees' health certificates and other relevant licenses according to law, and conduct food safety knowledge training according to regulations.

3. Establish and implement the incoming inspection record system of food (raw materials) according to law, establish the incoming inspection record system of food, raw materials, food additives and food-related products, carefully check the supply license, food certificate, product identification and quality of food and raw materials, and truthfully record the name, specification, quantity, production batch number, shelf life, supplier name and contact information, purchase date and other contents of food. Strictly control the purchase of goods, ensure the traceability and authenticity of food (raw materials) purchased by the unit, and prevent and control food safety risks. The retention period of inspection records shall not be less than two years.

This unit promises not to purchase and use meat and its products that have not been quarantined or passed the quarantine inspection by the supervising agency for animal health; Do not purchase and use poultry, livestock, beasts, aquatic animals and their products that have died of illness, poisoning or unknown causes; Ensure the authenticity of the information provided to the food and drug supervision and administration department to apply for the certificate of meat and its products.

This unit promises not to purchase and use food, food raw materials, additives and food-related products that do not meet food safety standards or requirements, such as "gutter oil" and "unqualified disposable chopsticks".

4. Ensure that the environment, equipment and facilities, layout process and operation process of catering services meet the food safety standards and requirements of catering services. Do not use food and raw materials prohibited by laws and regulations on food safety management.

5, to ensure the standardized management and use of edible oil and additives, to prevent the addition of non-edible substances, not beyond the scope, not excessive abuse of food additives. Do not use non-food utensils, containers and packaging materials, and do not use unsterilized tableware, tools and containers.

6. Establish the food safety supervision system of this unit, standardize business practices, improve the quality of catering services and self-discipline, consciously accept the supervision of food safety supervision departments and all sectors of society, and assume social and legal responsibilities.

Name of guarantor (seal):

Signature of legal representative:

Warranty date: xx-xx years, xx months and xx days.

This guarantee is made in duplicate, one of which is publicly guaranteed to the public and the other is submitted to the food and drug supervision and administration department for the record.