Current location - Recipe Complete Network - Catering franchise - Nantong new house decoration steps
Nantong new house decoration steps
Nantong new house decoration steps

1, pre-design

We should first have a vision and construction in mind, it is a key link in the decorating process, the need for detailed measurements of each space, including the area (tiling, wall paint, wallpaper, flooring), the need to design the size of the wall for placing furniture, reminding us not to forget to go to the property for the commencement of the work procedures. Pay the decoration deposit.

2, the main demolition

Then began the construction phase, a contact is the main structure of the demolition of the renovation, simple can be considered to be the first to build a framework, including demolition of walls, masonry, shoveling siding, change plastic windows.

3, water and electricity renovation

Then the water and electricity works, but we should remember that before the cooking area cabinets also need to carry out the second measurement, although this time can not get the actual content, just on the developer reserved for the location of the water outlet, hood socket, to put forward some relevant suggestions. Such as: the arrangement of the location of the hood socket, the location of the water meter is appropriate, the location of the water outlet is easy to install the sink, etc., after the completion of the water line transformation is to do waterproofing, including the bathroom.

4, carpentry

The main work includes package risers, do ceiling, paste lines, do cabinets.

5, tiling

This is a universal family needs a process, including threshold stone, stone window sill fixing, first of all, the former can be and floor tiles together with the ordinary completion, or after can, and the latter need to be done in the window cover, ready to prepare the glass glue for the marble and the window cover of the closed treatment, and then the home furnishing hardware a out of the floor drain, and floor tiles *** with the same with the installation, the tiler After leaving the field can be about the second measurement of the cabinet.

6, brush wall paint

is to carry out wall work, depending on what kind of material, the wall treatment is also different, such as later is the need to paste wallpaper, then only need to do grass-roots level processing can be done, if it is painted then you need to deal with the grass-roots level, leveling - primer - paint, but pay attention to the need for each process to be completely dry before the subsequent works.