Current location - Recipe Complete Network - Dinner recipes - Linear slide rail installation tips, do you know?
Linear slide rail installation tips, do you know?

When it comes to slides, I'm sure you are already very familiar with it. Slide on a fixed in the furniture cabinet on the connecting parts, so that the furniture drawers or cabinets can be in and out of the activities, such as cabinets, briefcases, bathroom cabinets and other furniture will be installed on the slide. There are many types of slides, we are more familiar with the roller type, steel ball type. Since we know it very well, then I want to ask you: understand the installation method of linear slides? Many people may be frowned upon, that's okay, because next I will give you a detailed introduction to its installation method.

The first step:

Before installing the linear guide must be removed from the mechanical mounting surface of the burrs, dirt and surface scars.

Note:? Linear slide rail in the formal installation are coated with anti-rust oil, before installation, please use cleaning oils to wash the reference surface before installation, usually the anti-rust oil removal, the reference surface is more prone to rust, so it is recommended to apply a lower viscosity of the spindle with lubricants.

Step 2:

Position the spindle rail gently on the bed table, and use the lateral fixing screws or other fixing fixtures to make the rail fit gently against the lateral mounting surface.

Note: Before installing the use of screw holes to confirm whether the match, assuming that the base processing holes do not match and forced to lock the bolt, will greatly affect the combination of precision and quality of use.

The third step:

From the center to both sides of the slide rail in order to tighten the positioning screws slightly, so that the track and vertical installation? surface slightly snug. The sequence is from the center position to the ends of the forced tight can be more stable accuracy. Vertical datum surface slightly tightened, strengthen the lateral datum surface of the locking force, so that the main rail can indeed fit the lateral datum surface.

Step 4:

Use a torque wrench to tighten the positioning screws of the slide rail according to the locking torque of various materials.

Step 5:

Use the same installation method to install the secondary rail, and individually install the slide to the main rail and the secondary rail.

Note that the slide mounted on the linear slide, many subsequent accessories due to limited installation space can not be installed, must be installed at this stage of the required accessories. (Accessories may be nozzles, pipe fittings, or dust control system, etc.).

Step 6:

Gently place the moving table onto the slides of the main and sub rails.

Step 7:

Lock the lateral compression screws on the moving table first, and then proceed in the following order after installation and positioning.

These are listed above is the specific installation method of linear slide, we have mastered? Although in our purchase of furniture, the business will send a special technician to serve us, do not need our hands to install, but I think, learn some knowledge in this area is also very necessary. If there is any problem in the process of use, we can also repair according to their own judgment. Finally, I hope that these methods and steps can bring you some substantial help.

Tuba Rabbit online free for everyone to provide "each decoration offer, 1-4 local decoration company, 3 sets of decoration design program", as well as decoration to avoid pit strategy! Click on this link:/yezhu/zxbj-cszy.php?to8to_from=seo_zhidao_m_jiare&wb, you can get it for free~