Current location - Recipe Complete Network - Food recipes - Shenzhen Metro Line 1 announces two more stations.
Shenzhen Metro Line 1 announces two more stations.

Information of two more stations will be announced on Line 1, namely, Maling Station and Donggualing Station.

metro line 1 starts from Futian port station in Futian district and ends at shuangyong street station in Longgang district, passing through Futian, Longhua and Longgang districts. the total length of the line is about 29km, and it is laid underground, with 24 stations (including 11 transfer stations).

Fuling Station is located in Fuling District, Futian District. The station is laid along Caitian Road. The station is a four-story underground (three floors in the southern part) double-column three-span island interchange station. The station has seven entrances and exits: A1, A2, A3, A4, B, C and D.

among them, port A1 is connected to xinhao e du; A2 is located in the green belt on the south side of the North Ring Road; A3 is located at one side of Caimei Interchange; A4 is located on the west side of Martyrs Cemetery; E port is connected to Starko Building; Port F is currently a temporary entrance and exit; Port D is connected to Yuehua Meilin Industrial Zone. (The entrances and exits D, A1, A2 and A3 are under construction. )

donggualing station is located near Tianwei Video Station in Futian District. The station is arranged in the north-south direction along the planned Caitian Road in Futian. The station is a reinforced concrete box frame structure with an island-side platform on the second floor underground. There are 7 entrances and exits in the station * * *: A, B, C, D and 3 property entrances and exits (E, F and G).

among them, the modern electronic plots at entrances A and B; The entrance and exit of C is close to the residential plot of Rainbow Pavilion; D entrance is close to the Great Wall Shengshi Home plot; The entrance and exit of Property E is close to Shenye Shangcheng plot; The entrance and exit of Property F is close to the plot of Intermediate Court; The entrance and exit of property G is close to Tianwei video plot. Among them, the entrances and exits of properties E, F and G are under construction.

This article comes from the author of Chejia, car home, and does not represent car home's standpoint.