Qianhaiwan Station is located in the Qianhai Planning Area of ??Nanshan District. It is built underground on Chenwen Road and is arranged in a north-south direction.
This station belongs to a centralized chain station and is also the transfer station for Luobao Line (Line 1) and Huanzhong Line (Line 5).
The station is one of six planned large-scale transportation hubs in Shenzhen.
This station is underground.
The main part of the station is 252m long, and the total width of the standard section of the station is 21.3m.
This station has 6 exits. Exit A: East side of Chenwen Road, north side of No. 7 Road Exit B: East side of Chenwen Road, Exit B1 of No. 9 Road: East side of Chenwen Road, south side of No. 9 Road B2
Exit: East side of Chenwen Road, north side of No. 9 Road Exit C: West side of Chenwen Road Exit D: West side of Chenwen Road Linhai Station is located on Jia'an Road, central area of ??Bao'an (the road has been built to the T-shaped intersection where it intersects Linhai Road
) and Linhai Road (planned) on the north side of the Binshui Coast. It intersects diagonally with Linhai Road. Its eastern end is about 140 meters away from the west embankment of Xinzhen River. The entire station runs east-west.
There is a planned seaside park on the south side of the station, a planned primary school and a convention and exhibition center on the north side, and Xilong Bay is located outside Exit A of the station.
This station is underground.
This station is an underground two-story island platform station with a total length of 206m, a total standard section width of 19.1m, and a total construction area of ??11,553m2.
This site has 3 entrances and exits.
Exit A: Jia'an Road, Haitian Road, Xilong Bay Exit B1: North side of Linhai Road Exit B2: South side of Linhai Road Baohua Station is located above the west side of the intersection of Xinghua 1st Road and Baohua Road in Shenzhen, next to Xinghua 1st Road
It is laid out in an east-west direction.
There are Baoan District Government and Seaside Plaza around the station site.
This station is underground.
This station is an underground two-story island platform station with a station length of 228m, a total standard section width of 19.1m, and a total construction area of ??11532.4㎡.
Exit A1: West side of Baohua Road, Baoan Central Plaza Exit A2: East side of Baohua Road, Longguang Century Building, International West Bund Building Exit B1: West side of Baohua Road Exit B2: North side of Xinghua 1st Road, Baoan Central Hotel C
Exit: North side of Xinghua 1st Road, Baoan Central Plaza Exit D: South side of Xinghua 1st Road, Baoan Central Plaza, Wanjun Economic and Trade Building, Rongchao Binhai Building Baoan Central Station is located below the intersection of Xinhu Road and Chuangye 1st Road, Baoan District, along the
Located on Xinhu Road, it is an interchange station for Lines 1 and 5.
The station is an underground station with a three-story underground side platform station. The station is 159.8m long, the total width of the standard section is 24.4m, and the total construction area is 12001.3㎡.
Exit A: North side of Xinhu Road, Haiwang Middle School Exit B: South side of Chuangye 1st Road, Hongfa Center Building, AEON Baoan Center Store Exit C: North side of Chuangye 1st Road, Binhai Primary School Exit D: North side of Xinhu Road, Fenglin
Zhouzhou, Longguang Tianyue Longting, Baoan Central Bus Station Exit E: South side of Xinhu Road, Shenzhen Baoan District Committee, Shenzhen Baoan District People's Government, Seaside Plaza Exit F: West side of Xinhu Road,
On the south side of Chuangye 1st Road, the International West Bund Business Building and Baoan Center Fanfen Station are located on the west side of the intersection of Chuangye 1st Road and Fanchen Avenue in Fanshen Village, Baoan District, and are arranged along Chuangye 1st Road.
On the west side are new mature communities and some old villages such as Haitian Garden and Hongfu Yayuan, and on the south side are Fuyuan Commercial Center, Tianhong Shopping Mall, Bihai Garden, Anle Primary School and other communities and old villages.
On the east side is the Chuangye Road Overpass, and around the station are large shopping malls such as Tsim Sha Tsui Foreign Trade City, Rainbow Shopping Mall, Fuyuan Trade Center, and Gome Electrical Appliances.
This station is underground.
This station is an underground two-story island platform station with a station length of 212.4m, a total standard section width of 19.1m, and a total construction area of ??11836.45㎡.
Exit A: Chuangye Tianhong Shopping Mall Exit B: Chuangye Tianhong South Exit C: Chuangye Tianhong South Ganoderma lucidum Station is located at the intersection of Qianjin 1st Road and Chuangye 2nd Road, extending from Chuangye 2nd Road in a north-south direction.
The northeast side of the station is Ganoderma lucidum Park; the northeast side is the tax bureau, judicial office, notary office, etc.; the west side is the 25th District Pedestrian Street, Gome Electric Appliances, and Haiya Department Store; the south side is Guancheng Family, Xin'an Lake Garden and other large residential areas such as Suning Appliances,
Metro, certificate office, etc.; this station is an underground station with a two-story underground island platform station. The station is 226.6m long, the total width of the standard section is 21.1m, and the total construction area is 15328.1㎡.
A1 Exit: South side of Chuangye 2nd Road, west side of Qianjin 1st Road, Bank of Jiangsu, Shangri-La, Suning Appliance, etc. B2 Exit: South side of Chuangye 2nd Road, east side of Qianjin 1st Road, Jade Huating, Ping An Bank, Taxation Bureau, etc. C1 Exit: Chuangye
Honglang North Station is located on the north side of 2nd Road, the east side of Qianjin 1st Road, the Emerson Building, and the Jinfeng Haoting Entrepreneurship Center. It is located underground at the intersection of Chuangye 2nd Road and Xin'an 3rd Road in Bao'an District, Shenzhen. It is arranged along Chuangye 2nd Road, running from southwest to northeast.
There are Chery Automobile and Baoan District Labor Library around the station.
This station is an underground two-story island platform station with a station length of 228.6m, a total standard section width of 19.1m, and a total construction area of ??11051.3㎡.
real