Xi Metro Line 3 is semicircular, starting from Baqiao Bonded Zone Station in the northeast, passing through weiyang district, Xincheng District and beilin district, and reaching Yuhuazhai Station in Yanta District in the southwest, connecting Xi International Port Area and Xi Hi-tech Industrial Development Zone. It is the backbone of Xi rail transit network planning.
By June, 2020 165438+ 10, the total length of Xi Metro Line 3 was 39. 15 km, including 27. 13 km underground and10/0.57 km above ground. There are 26 stations along the line, including 9 underground stations/KLOC-0 and 7 elevated stations. The train adopts 6 B-type trains. By April of 20021year, the daily maximum passenger flow of Xi Metro Line 3 was 854,800.