Party B:
ContractNo.: Signature Time:
According to the Contract Law of People's Republic of China (PRC), through friendly negotiation, Party A and Party B agree that Party A will entrust Party B to make advertising signs on Dangdang. In order to clarify the responsibilities of both parties, both parties have made clear the following treaties and abide by them jointly.
Article 1, general
1. Project name: "Enjoy Dangdang Food Club" signboard
2. Project Location: Houjie, Dongguan
3. Project content: Enjoy the production of signboards in Dangdang Street (detailed list of specific projects, specifications, materials, technology and prices).
Article 2, the total project price
The total price is RMB one thousand Yuan only (1000.00 Yuan).
Article 3, signboard production costs (paid according to the progress of the project)
1. After the contract is signed and the production plan is finally confirmed, Party A shall pay Party B the cost of engineering materials in advance:
2. After the signboard installation is completed and passed the acceptance, Party A shall pay the balance RMB to Party B in one lump sum:
Article 4, Quality Assurance
1. Party B must strictly control the quality, and make and install according to the schedule signed by Party A and the specific material and process requirements of the project in the production plan. ..
2. Party B shall guarantee the quality of the project. If there is any fault or problem within one year after the acceptance, Party B shall arrange free maintenance.
3. If there are any faults or problems after the warranty period, Party B has the obligation to arrange maintenance, and only charge the first material cost and labor cost.
Article 5, the construction period arrangement
1. After receiving the advance payment paid by Party A, Party B will start to make and prepare relevant materials. Go to the site for construction within seven working days after signing the contract, and the site construction period is fifteen working days.
2. If the performance of this contract is affected by force majeure events, resulting in the delay of the construction period, the construction period will be postponed, and the responsibility is not borne by Party B, but Party B shall immediately notify Party A and obtain Party A's approval. Under the above circumstances, Party B still has the responsibility to take all necessary measures to complete the project as soon as possible. The expenses arising from the disaster shall be settled by both parties through consultation.
Article 6. responsibility for breach of contract
1. Except for the force majeure accidents and contract termination agreed in this contract, if Party A unilaterally terminates this contract, it shall pay Party B a penalty of/kloc-0.5% of the total contract amount. If Party B has started or started the construction with the approval of both parties, Party A shall compensate Party B for all the expenses of the completed work under the condition that Party A unilaterally terminates the contract.
2. Except for the force majeure accidents and contract termination agreed in this contract, if Party B unilaterally terminates the contract, it shall refund the advance payment paid by Party A and pay Party A a penalty of 15% of the total contract amount.
3. If Party B fails to provide production services on time, except for force majeure accidents and non-Party B's responsibilities, Party B shall pay Party A a fine of 0.5% of the balance of the total contract amount at that time every week, and the delay of less than one week shall be counted as one week. The total amount of the fine shall not exceed 10% of the balance of the total contract amount, which shall be deducted by Party A when paying.
4. If Party A fails to pay the contract amount within the time stipulated in the contract due to force majeure, it shall pay Party B the liquidated damages for overdue payment, which shall be calculated as 0.5% of the unpaid amount per week, and the days of overdue delivery shall be calculated as one week. The total amount of this fine shall not exceed 10% of the overdue fine. If Party A fails to pay the contract money according to the time stipulated in the contract, resulting in the delay of the construction period, Party A shall bear all the responsibilities, and Party B shall not bear any responsibilities.
5. In any of the following circumstances, Party A and Party B shall sign a supplementary contract through consultation.
1) Items that Party A requires to change (non-engineering quality) ..
2) Other items not included in the quotation of this contract.
Article 7. arbitrate
In case of any dispute during the execution of this contract, both parties shall settle it through friendly negotiation. If negotiation fails, it shall be submitted to the arbitration institution of the place where the contract is performed, the Administration for Industry and Commerce for arbitration. If you are not satisfied with the arbitration, you can bring a lawsuit to the local people's court.
Article 8, construction safety
Party B must install aerial ropes and equip professional aerial workers (with aerial construction certificate) for aerial construction, and Party B shall be responsible for the safety problems in the construction process; Within 5 years of the normal service life of the signboard, Party A and Party B shall be responsible for the safety problems caused by the falling of the signboard.
Article 9. Annex to the contract
1. Party A confirms and signs the production quotation.
2. Party A confirms the signed production and construction drawings.
Article 10. Entry into force of contract and others
1. This contract is made in duplicate, one for each party, and shall come into effect after being signed and sealed.
2. During the execution of this contract, all annexes and supplementary agreements are signed by Party A and Party B through negotiation, and shall come into effect as of the date of signature and seal, which are an integral part of this contract.
3. Matters not covered in this contract shall be settled by both parties through friendly negotiation.
Party A: Party B:
Name: Name:
Legal person or customer: legal person or customer:
Tel: Tel:
Date: Date: