1. Key points for inspection and prevention of safety production in winter:
1. The configuration of heating facilities in migrant workers' dormitories must be done well, and electric blankets and electric stoves are strictly prohibited for heating. When using coal for heating, measures must be taken to prevent gas poisoning.
2. The greenhouse on the construction site in winter should be erected to prevent the collapse accident.
3. In the management of toxic, harmful and dangerous chemicals, it is necessary to prevent the occurrence of food poisoning incidents of indwelling personnel and production personnel, especially to prevent the occurrence of poisoning incidents caused by mistaken use of sodium nitrite as salt.
4. Carefully check the excavation scheme of foundation pit for newly started projects to prevent collapse accidents.
5. Check the operation, disassembly and assembly of all kinds of construction machinery and equipment to prevent mechanical injury accidents.
6. Check the safety of scaffolding, access and formwork support to prevent slipping and falling accidents.
7, winter shutdown project, other people are forbidden to enter the site.
2. Winter construction will be started when the outdoor daily average temperature is stable below 5℃ for five consecutive days. In order to prevent the temperature change from affecting the project quality, all branches and project departments should formulate winter construction plans and anti-freezing measures for the projects under construction and submit them to the Engineering Department for approval.
third, do a good job in site safety and comprehensive management during winter construction and shutdown to prevent all kinds of theft and illegal events.
branches and project departments must make good preparations before winter construction, adopt correct construction methods, organize technical business training for relevant personnel, receive weather forecast in time, prevent the sudden attack of cold current, organize relevant machines and tools, additives and thermal insulation materials to enter the site in advance, build boiler rooms, mixing stations and laying pipelines for heating, check their safety and reliability, and do a good job in the mix proportion of concrete, mortar and additives in winter construction.
in winter construction, we should pay special attention to safety protection, strengthen management, prevent gas poisoning and prevent burns, scalds and explosions. There should be a special person to keep the admixture to prevent accidental poisoning. A special person shall be responsible for the construction of electricity to prevent leakage, electric shock and fire.
For the projects under construction in New Year's Eve, as well as the projects stopped or postponed, it is necessary to do a good job of wintering protection in time in winter and formulate measures to prevent the foundation and foundation from being soaked in water, corroded steel bars and frozen concrete. Each branch and the project department shall designate special personnel to check and implement in time to ensure the engineering quality and construction safety.
the fourth quarter is the key stage of construction production throughout the year, and it is also the season of frequent attacks by cold wind, frost and snow. In order to make the production in the fourth quarter go smoothly, according to the usual practice, the company issued technical measures for winter construction again. It is hoped that all branches and project departments will formulate corresponding technical measures according to their own characteristics and combined with the actual situation of construction and production, and report the winter construction plan and measures to the company's engineering department for approval as soon as possible.
for more information about the engineering/service/procurement bidding, and to improve the winning rate, you can click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd