1/3 Step by step reading
Preparation before starting:
1. Test whether the motor rotates correctly (subject to the direction indicated on the pump body), and the test time should be short to avoid dry grinding damage to the grinding parts due to the rotation in the pump without liquid lubrication;
2. Open the exhaust valve to make the whole pump body full of liquid, and close the exhaust valve after it is full; 3. Check whether each part is normal;
4. The high-temperature type shall be preheated at the heating rate of 50℃/ hour to ensure that all parts are heated evenly.
2/3
Start:
1. Close the pump outlet valve; 2. Fully open the pump inlet valve;
3. Start the motor and observe whether the pump is running normally;
4. Adjust the opening of the outlet valve to meet the required working conditions. If the user is equipped with a flowmeter or pressure gauge at the pump outlet, the pump should be operated at the rated point listed in the performance parameter table by adjusting the opening and closing degree of the outlet valve. If the user is not equipped with a flowmeter or pressure gauge at the pump outlet, the opening of the outlet valve should be adjusted. Measure the motor current of the pump to make the motor run within the rated current, otherwise the pump will be overloaded (that is, the motor will be burnt out when running with high current), and adjusting the opening of the outlet valve is related to the pipeline situation; 5. Check the leakage of shaft seal. Under normal circumstances, the leakage of mechanical seal should be less than 3 drops per minute; 6. Check the temperature rise of motor and bearing ≤80℃.
Garbage pump factory outlet, cheap, free of charge.
Someone called 56 minutes ago to ask questions.
Shandong rugong machinofacture co., ltd. advertisement
3/3
Shut down:
1. Close the outlet pipeline valve; 2. cut off the power supply; 3. Close the inlet pipeline valve;
4. If the vehicle stops for a long time, the liquid in the pump should be drained.