In home renovation, plumbing and electrical remodeling is a big project, but also a very easy to error project, if the renovation is not pay attention to, it is easy to bring a lot of trouble in the future life. The following editorial will introduce you to the plumbing and electrical remodeling notes, to provide you with a small assistant in the decoration, here to see it.
Water and electricity renovation considerations a, water part
(a) water design should first think about all the equipment related to water, such as: water purifier, water heater, KitchenAid, toilet and washbasin, etc., their location, installation, and whether the need for hot water;
(b) to think ahead of time to use gas or electric Water heater, to avoid temporary replacement of the type of water heater, resulting in repeated transformation of the water line;
(iii) pressure test is best to have the owner present, can play a supervisory role; because some decoration team will be cheating the owners in this link. The method is: pressurized, open the pressure pump "back valve" to form a circuit, the pressure pump seems to be working, but there is not much pressure in the pipe, especially for the electric pump, students should pay more attention. If you don't know, you can ask a professional to help you look at it.
(d) if you want to close the extra floor drain, be sure to plug the gap between the drain pipe and the floor drain to prevent the water flow backflow;
(e) bathroom in addition to leaving the sink, toilet, washing machine and other outlets, it is best to also pick up an out, and later water mopping and other convenient; this depends on the owners of each like the problem.
(F) after the transformation of the waterway should have a pressure test, but now a lot of decoration team do not have a pressure test. They will use a lot of methods to cheat you, say what do not need to pressurize ah, there is water in the pipe pressure ah, and so on.
(vii) after the location of the washing machine to determine the washing machine drainage can be considered to do the drain inside the wall, beautiful, convenient;
(viii) after laying kitchen and bathroom floor tiles should be put in the water to check to see whether the floor drainage is smooth (to remove the cover of the floor drain after the rate of drainage shall prevail, because most of the deep water sealing the floor leaks there are slow drainage problems);
(ix) and A particularly important point, the washing machine floor drain is best not to use the deep water sealing floor drain, washing machine drainage speed is very fast, large drainage, deep water sealing floor drain can not meet the speed of the water, the result will directly lead to the flow of water back overflow;
(10) the use of the deep water sealing floor drain, according to the use of the situation of frequent cleanup, or the floor drain under the gasket hangs after the dirt can not play the role of closure;
(xi) the time of receipt should pay attention to check the kitchen, bathroom each drain is smooth, if the drainage is slow should be timely to let the property dredging; renovation should be protected during the drain, especially in the kitchen and bathroom during the tiling, the most likely to cause the cement to fall into the drain leading to clogging;
(xii) the waterway reconstruction, the installation of electric water heaters to the future, water tap, etc., reserved for cold, Hot water pipe should pay attention to four points:
1, cold, hot water pipe mouth height consistent;
2, cold, hot water pipe mouth should be two centimeters above the wall, paving wall tiles should also be asked to tile after paving wall tiles to ensure that the wall tiles and water pipe mouth of the same level. If the size is not appropriate, the future installation of electric water heaters, faucets, etc., it is likely to need to purchase additional pipe clamps, inner wire and other connectors to complete the installation;
3, cold and hot water on the wall perpendicular to the mouth of the water pipe, and later paste the wall tiles should pay attention to do not let the tiler to get askew (not perpendicular to the words of the installation can be a lot of effort in the future);
4, to ensure that the spacing of 15 centimeters (most of the current Electric water heater, split faucet hot and cold water on the water spacing are 15 cm, there are some individual is 10 cm);
(xiii) bathroom floor must not forget to do waterproofing, especially the ground slotted. Shower area if not closed shower room, the wall waterproofing should be done to 180 cm high, in order to prevent future "wall sweating". In the cement before the cement must do 24-hour water closure test, there is no problem before laying bricks;
plumbing remodeling notes two, circuit part
(xiv) the design of the circuit must be detailed consideration of the possibility of feasibility, feasibility, usability before determining. No one wants to pull wires all over the wall and floor of the new home. Circuit design at the same time should also pay attention to its flexibility, sometimes can not be too "thorough". Deadly resistance to summarize a relatively simple principle: in the electrical plug is concentrated in the location of the consideration of the future to connect a plug board, the effect is often better than setting up a wall full of sockets;
(xv) the location of the socket is very important, there are often sockets are located right behind the bedside table, resulting in the cabinet can not be against the wall of the case occurs. Let the outlet as far as possible to put the side of the general will not go wrong, but if you leave the location of the outlet improperly, there may be a conflict with the later placement of furniture or electrical installations, students bear in mind;
(xvi) bedroom ceiling lights can be considered dual-control (bedside and entrance);
(xviii) some of the kitchen socket or with a switch to facilitate to avoid, for example, later rice cooker The plug has to be unplugged from time to time, which is inconvenient.
(xviii) living room lamp according to the needs of life can consider installing a split-control switch (into the foyer and back to the master bedroom door);
(xix) how to charge for the dark box must be said in advance, this is the most hidden water and electricity road reconstruction, the darkest point of profit. A dark box on the market is also one or two dollars, and the decoration team often charge more than ten dollars, the general home furnishing needs dark box less than the number of five or six dozen. Therefore, it is normal for students to throw hundreds of dollars for nothing. Deadly resistance to pull it out today to the world, the purpose is only one, we remember five words: cut down hard!
(xx) pay attention to the observation of telephone outlets, network outlets within the module;
(xxi) with mirrors and coat hooks space, to consider the lighting near the mirror;
(xxii) surrounded by the audio line should be in the circuit remodeling should be buried.
(xxiii) living room, master bedroom, bathroom should be based on personal habits and convenience consider pre-set telephone lines;
(xxiv) pay attention to the strong and weak wires can not be in the same pipeline, there will be interference;
(xxv) the living room, kitchen, bathroom, if you pave the tiles, some locations can be appropriate to consider not to have to groove wiring;
(xxvi) There is no need to set up too many sockets behind the TV, it is best to connect a plug board on the side of the TV later.
(xxvii) sockets from the ground is generally 30CM, should not be less than 20CM, the switch is generally 140CM from the ground;
(xxviii) a tube up to eight lines, and remember: each tube gap can not be less than 40%.
(xxix) exhaust fan switch, telephone socket should be installed near the toilet, rather than into the bathroom door of the wall;
(xxx) bath bar should be considered to be installed close to the shower or bathtub, rather than installed in the center of the bathroom;
(xxxi) circuit modification is necessary according to the use of home appliances to consider the line capacity increase;
( Thirty-two) balconies, corridors, checkrooms can be considered to reserve sockets;
(Thirty-three) should be clearly communicated with the workers intention, design ideas. And in the wall bouncing line drawing the actual circuit remodeling routes;
(xxxiv) electrician specification, the requirements of buried concealed pipe must be used PVC pipe and variable head.
plumbing remodeling notes three, water and electricity circuit integrated part
(Thirty-five) plumbing remodeling is the largest hidden project, but also the most expensive one inside the additions, can not workers say how much is how much, to see if they are not routinely walk the pipe.
The above is about the plumbing remodeling precautions related to content, I hope to help you! Tubaboo Remodeling, the industry-wide leader. Click on the following link on this page, you can get the supply of big brand main materials, free quality design provided by professional design team, free home inspection, etc., and save 40% of the renovation cost immediately!
<<<Click here to apply for free renovation insurance, free professional supervision services>>><<<<Click here to get a free room measurement from a professional designer, get a renovation quote>><<<<<Click here to grab a free design quota for 0 yuan, professional designers, whole house design><<Click here to grab a free design quota, professional designers, whole house design. gt;>