Current location - Recipe Complete Network - Catering franchise - Introducing Shenzhen's Civic Center
Introducing Shenzhen's Civic Center
Shenzhen Civic Center is located in the central axis of Shenzhen city center area, with a total construction area of 210,000 square meters, it is an iconic building in Shenzhen and a landmark in the central area.

The foundation stone of the building was laid in December 1998, and by the end of December 2003, the project was basically completed. The Civic Center Central District building consists of a round tower that holds up a large roof, a square tower and a glass podium, with a total floor area of 89,000 square meters and a total building height of 84.7 meters. The yellow round tower has 12 floors, of which 2~9 floors are industrial exhibition halls and 10~12 floors are machine rooms. Red square tower *** 15-storey high, of which 1~4 floors for the 2,500-seat Town Hall, the size of the city's largest, a variety of large-scale meetings and performances can be carried out here; 5 floors of the equipment and office space and municipal government information technology server room; 7~12 floors of the archives. Two towers under the east and west of the two glass podium *** two floors, the first floor part of the VIP access, public ceremonial hall, reception room, VIP hall and government administrative services hall.

Architectural Functions

[edit]

On May 31, 2004, the Shenzhen Civic Center, the new site of the Shenzhen Municipal Government Office, was officially opened, marking that the Municipal Government and its 21 subordinate governmental functional units had moved into the Civic Center as a whole.

The Civic Center fully embodies the open and pro-government image in its design and functional distribution. Administrative services hall set up 145 service windows, more than 30 major government departments to accept more than 390 approval projects, administrative services hall to implement the "one-stop" service, the completion of the computer management information system with on-site management and supervision functions, 32 government departments will be their own computer applications to access the administrative services hall, for use in their respective windows, and with the hall, the government departments will be able to provide the administrative services hall. For their respective window use, and the hall computer management information system real-time exchange of data, administrative services hall is equipped with rest chairs, computer guidance system, large-scale plasma color TV and pay phones and other amenities, members of the public can go in and out at will. 1,700 square meters of public ceremonial hall not only for the municipal government to hold a press conference, but also open to the public to hold events such as weddings and other activities, the underground parking lots will also be admitted to the community. The underground parking lot will also accept social vehicles.

From the municipal government to the public, from the administrative center to the civic center, take the opportunity of a functional department relocation, the Shenzhen Municipal Government completed a government administrative concept of big "brain", built a government without walls. The original city hall compound renamed "Shenzhen Citizen Center", the name is good!

Citizen Center is the center of service for the public. Shenzhen Municipal Government renamed the Citizen Center, three major concepts jumped out: First, it reflects the concept of effective government. Effective government requires the government and other non-governmental organizations and citizens together constitute a composite organizational structure, the government and citizens collaborate in the production of public **** service institutional arrangements, reflecting the government and the public **** enjoy information, **** enjoy civilization; secondly, it reflects the concept of open government. Civic center construction of a large open platform to highlight its open function, the civic center to promote the concept of open information sharing, its hardware and software construction reflects the government's sense of openness; Third, it reflects the concept of service government. The essence of "service government" is "limited government", "rule of law" and "democratic government". With more than 140 service windows, Shenzhen has established itself as a service government and an effective service delivery system.

As the seat of the municipal government, in the past, people used to call it "Yamen", and it seems that there is always an insurmountable gap between the public and the government. This time, the Shenzhen Municipal Government has taken the lead in changing the administrative office center into a civic center, which implies a shift in administrative philosophy that is even more iconic.

Control system

[Edit]

In order to achieve the "service organs, convenient for the public, centralized supervision and improve efficiency", the Shenzhen Municipal Civic Center introduced a number of advanced systems, including broadcasting systems, data systems, a huge audio-visual system, etc., in order to meet the needs of a number of important departments and to meet the needs of various government departments and rooms. With the support of Shenzhen Pico Electronics Co., Ltd. and Shenzhen Tongyou Technology Development Co., Ltd., Crestron is honored to provide a safe, reliable, advanced and practical central control system for this modern and intelligent administrative center. The entire Civic Center uses several sets of Crestron central control systems, all of which can individually control all the equipment in the room, and can also be centrally controlled in the Emergency Command Center through the network.

Main Places

[Edit]

Multimedia Conference Rooms

There are a number of multimedia conference rooms in the Civic Center, and each of them is installed with the AV2 professional dual-bus control system, the STXI-1700C bi-directional wireless touch screen, and the CNX-B12W control panel, which can be used to control the switching of audio-visual equipment, lights and curtains. control.

Conference Hall of the National People's Congress

The conference hall of the National People's Congress, where the Standing Committee of the National People's Congress conducts meetings or conferences, is equipped with a single AV2 professional dual-bus control system, which allows technicians to display different graphic and textual information on a number of plasma televisions and projectors according to their needs by using the TPS-4500 12-inch touch screen or CT-1000 3.8-inch wall-mounted touch screen in the conference hall, and also control DVD players, PCs and other devices.

The TPS-4500 12-inch touch screen or CT-1000 3.8-inch wall-mounted touch screen can also be used to control DVD players, PCs, and MD players, as well as the tracking image of video cameras, and the expansion of real-time interpretation system and lighting control.

Standing Committee Room

The Standing Committee Room is the meeting room where the Standing Committee of the National People's Congress (NPC) conducts voting and discussion. The control room, like the NPC meeting hall, installed AV2 professional dual-bus control system, centralized control of the speech, electronic voting system, audio-visual system and camera system in the meeting hall, so that the various functions of the system can be coordinated. As the conference hall is divided into two floors, the developer not only used TPS-4500 12-inch touch screen and CT-1000 3.8-inch wall-mounted touch screen, but also adopted Crestron STXI-1700C two-way wireless touch screen, so that the technicians can control the system at any time, anywhere, and in any place of the conference hall.

Emergency Command Center

The National People's Congress (NPC) meeting hall, the Standing Committee meeting hall, and a number of medium-sized conference rooms are all interconnected by a network, so in the Emergency Command Center, it is only necessary to install a single TPS-6000 15-inch touch screen and the AV2 professional dual-bus control system, and the technicians can control and manage the systems and major equipments of the NPC meeting hall, Standing Committee meeting hall, and a number of medium-sized conference rooms centrally through the network. The technicians can centralize the control and management of all systems and major equipments in the NPC and SCCLR halls as well as several medium-sized conference rooms through the network. In addition, through Crestron's powerful RoomviewTM 5.0 consulting platform software, technicians can understand the use of all the equipment in each room in real time, and have a real-time dialog with the technicians located in each room to provide effective technical support.

Intelligent Management

[Edit]

The Shenzhen Civic Center references a number of intelligent and advanced systems, and its completion has witnessed China's development of modernized intelligent buildings, as well as being a model for e-government. The fact that Crestron was able to provide a highly efficient centralized control system for this large-scale project is an important milestone for Crestron Asia Ltd. in China, and marks the achievement of the efforts of domestic engineers. In order to lead China into a new era of intelligent buildings, Crestron will continue to maintain excellent quality, improve service, and research more innovative technologies.

Public Evaluation

[Edit Paragraph]

From the municipal government to the public, from the administrative center to the civic center, take the opportunity of a functional department relocation, the Shenzhen Municipal Government completed a government administrative concepts of the big "brain", built a government without walls. The original city hall compound renamed "Shenzhen Citizen Center", the name is good!

Citizen Center is the center of service for the public. Shenzhen Municipal Government renamed the Citizen Center, three major concepts jumped out: First, it reflects the concept of effective government. Effective government requires the government and other non-governmental organizations and citizens together constitute a composite organizational structure, the government and citizens collaborate in the production of public **** service institutional arrangements, reflecting the government and the public **** enjoy information, **** enjoy civilization; secondly, it reflects the concept of open government. Civic center construction of large open platform to highlight its open function, the civic center to open concept to promote the sharing of information, its hardware and software construction reflects the government's sense of openness; Third, it reflects the concept of service government. The essence of "service government" is "limited government", "rule of law" and "democratic government". With more than 140 service windows, Shenzhen has established itself as a service government and an effective service delivery system.

As the seat of the municipal government, in the past, people used to call it "Yamen", and it seems that there is always an insurmountable gap between the public and the government. This time, the Shenzhen Municipal Government has taken the lead in changing the administrative office center to a civic center, and the shift in administrative philosophy that this implies is even more emblematic.

The largest building

[Edit]

The largest municipal building

Shenzhen Civic Center is located in the north-south central axis of Shenzhen city center, its architectural image such as the roc spreading its wings, grandiose, a symbol of Shenzhen in the construction of a modernized and internationalized city in the soaring and development. With a construction area of 210,000 square meters and a building height of 84.7 meters, it is the largest municipal building in Shenzhen.

The largest parking lot

The Civic Center has the largest parking lot in China. According to the relevant departments of the Civic Center, the Civic Plaza underground parking lot consists of two parts, **** there are 2608 parking spaces.

The largest roof

The roof of the Civic Center in Shenzhen covers an area of 63,000 square meters, with a total weight of about 9,000 tons, a total length of 486 meters, a maximum width of 154 meters, and there is no example of a similar project in the world's architectural history, and it is a veritable "first roof" in Shenzhen.

The largest auditorium

Shenzhen Civic Center Auditorium equipped with boxes, simultaneous interpretation, surround sound and other state-of-the-art facilities, the Civic Center Auditorium will be 1900 seats of the "sea" for the public to hold meetings, watching movies.

Architectural details

[Edit]

Government offices

Set up a front desk to facilitate the public to do business

Civic Center West is the government offices, led by Chen Haiming, the reporter visited the offices and conference rooms have been decorated.

From the south gate into the government offices, the entrance hall has a front desk, this setup highlights the government's pro-people thinking, but also to facilitate the masses.

The entrance to the South Gate is the Tourism Bureau, the Bureau of Organ Affairs and other units, the Tourism Bureau's office has been set up, in addition to telephones, computers, office equipment has been set up, the reporter saw that each seat is equipped with a folding crib, do not need to be hidden in the cupboard, with the time to unfold the spread on the ground, does not take up space. Office of the light is very good, outside the window is a patio-style inner garden, called the stone garden, beautiful shape, can be used for rest. Another inner courtyard near the round tower is called Bamboo Garden, which has been planted with bamboo.

Next to the conference room is the press room

Next to the conference room is the press room, which has office chairs and Internet access. Offices on all floors have been set up, and some construction and cleaning crews are still busy. Although the city's big move will start from the day after tomorrow, but the "vanguard" --- part of the personnel of the Bureau of Organ Affairs has already moved into the Civic Center, began to carry out a variety of pre-preparations for the city's big move.

In addition to the sign nailed to the door and the location of the different, the various bureaus (offices) of the office layout almost no difference, the overall feeling is very simple, friendly. In addition, the Civic Center also used direct drinking water, personnel access, dining are using IC cards.

Red and yellow towers

2500-seat Town Hall for the city's top

With the blue roof with the Civic Center is located in the middle of the red and yellow towers symbolizing the colors of the flag. An old Chinese saying goes, "Heaven is round, earth is square." This also gave the designers inspiration, so there is a yellow round tower and red square tower, while the round tower and square tower south and set up a square patio and round patio to echo each other.

According to reports, the Civic Center in the middle of the building by holding up the large roof of the round tower, square tower and glass podium composed of a total floor area of 89,000 square meters, the total height of the building 84.7 meters. The yellow round tower 12 floors, of which 2 ~ 9 floors for industrial exhibition halls, 10 ~ 12 floors for the machine room. The red square tower *** 15-storey high, of which 1~4 floors for the 2,500-seat Town Hall, the size of which is the city's largest, the future of the city's various large-scale conferences and performances can be held here; 5 floors are equipment and office rooms and municipal government information technology server room; 7~12 floors for the archives. Public Ceremonial Hall is available to the public wedding

Two towers under the east and west of the two glass podiums *** two floors, the first floor part of the VIP channel, public ceremonial hall (about 1,700 square meters), reception rooms, VIP hall and government administrative services hall composition. According to reports, the public etiquette hall currently being renovated is also designed for press releases, public wedding and other functions.

The central area of the underground *** two floors, with stairs and elevators up and down, the second floor of the underground area of 16,395 square meters, the function of the garage and equipment rooms, garage part of the parking space *** 187; the first floor of the first floor for a large cafeteria can be supplied to the use of 2,500 people, as well as kitchens, restaurants, logistical services, such as rooms. Reporters in the large cafeteria to see, workers are cleaning a variety of dining facilities and tables and chairs and benches, seating capacity of 1,500, when the units need to be slightly staggered dining time.

Administrative Services Hall

145 windows covering the main approval program

The service hall is divided into two symmetrical parts, the western square patio and the eastern circular patio parts are service halls. After the Civic Center is put into use, there will be 32 bureaus setting up 145 windows in the administrative service hall, covering the main departments of the municipal government approval projects.

After the opening of the administrative services hall, will be the first time in Shenzhen to realize the "information first delivery system" - enterprises, individuals in a government department to submit general information, can be realized through the public *** database resources *** enjoy, do not need to go to other departments *** enjoy. * * * enjoy, do not need to repeat to other departments of the window to provide. As the municipal government window for social services, administrative services hall will be e-government as a means to vigorously implement the "one-stop" service.

The wall of the administrative services hall is written with "enthusiasm and initiative, administration in accordance with the law, convenient and efficient, fair and clean" 16 big words. The hall is equipped with rest seats, computer guidance system, and large plasma color TV and public telephone and other convenient facilities.

East, Central and West

Functionality is different and the environment is beautiful

The Civic Center is divided into three major parts: East, Central and West, which are linked together by a large roof known as the "Roc Spreading Wings". Among them, the East District 48,000 square meters, the Central District 89,000 square meters, the West District 76,000 square meters.

Each part of the East, Central and West zones has multiple independent exits and independent pedestrian flow lines. In the center section, there is the Assembly Hall, the Ceremony Hall and various public **** event spaces. The West Wing houses the city offices. The east wing is very quiet and houses the offices of the National People's Congress and the museum.

In addition, six themed inner courtyards have been created inside the Civic Center to bring the offices closer to nature. The Civic Center East, which is the area where the NPC and the museum are located, has a total floor area of 48,000 square meters, with one level underground and five levels above ground, and a total building height of 22.8 meters. Among them, the basement of 5200 square meters for the machine room and storage of the city's cultural treasures of the Museum of cultural relics storage area; above ground floor area of 42,800 square meters, for the Standing Committee of the National People's Congress office (including the Standing Conference Room of the National People's Congress and People's Congress Hall) and the Museum is located. According to the design, the east and west ends of the Civic Center, respectively, there are east and west of the two squares, the western side of the western side of the office area of the West Square has been basically completed. The design plan uses the soil slope will be the entrance channel into two relatively outward and inward, noisy and quiet two small square.

The western office area has four foyers: east, south, west and north. The four foyers are decorated with four colors for their reception desks and elevator doors, so that everyone entering the lobby can identify their area by the corresponding color. The east foyer is cyan, meaning spring, everything grows luxuriantly; north foyer is blue, meaning winter, take it like the sky, like the water meaning, the sea is wide and the sky; west foyer is mainly white, and attached to the golden yellow or orange, meaning autumn, mist autumn frost, or autumn ripe harvest season, autumn leaves all over the place; south entrance for the red series, meaning summer, the sun shines brightly.

Civic Center roof

The most visually stunning parts

In order to see the Civic Center roof in the end, the reporter drilled into the area of 63,000 square meters, a total weight of about 9,000 tons of the roof, "zero-distance" experience of the Civic Center's most visually stunning parts. The part of the center is the most visually stunning.

Super roof defies strong typhoons

Climbing into the big roof inside the careful walking, only to see the big roof inside the mesh steel structure, sealing plate by the screws, rivets or welding fixed. The reporter walked up the slope to the center of the roof, which is the highest part, and found that the center of the roof was not closed. Fellow Chen Haiming said that this is done in consideration of the beauty of the roof and lighting, is a kind of artistic modeling, so that the big roof is more vivid.

The three-dimensional curved shape of the big roof structure is divided into the east, middle and west of the three blocks, architecturally connected as one, the volume is huge, the shape is complex, the total length of 486 meters, the maximum width of 154 meters. At present, there are no examples of similar projects in the world's architectural history. Chen Haiming said that some people are worried that such a large roof will not be blown up by the typhoon, the roof panels will not fall down, in fact, this worry is overly concerned. Civic Center at Tongji University to do the wind tunnel test shows that the big roof can fully resist the attack of strong typhoons, last year swept the city's Typhoon "Dujuan" did not cause any destructive impact on the big roof, enough to show that the big roof of the strong.

Unique shade, rain and energy saving

The big roof consists of two parts: the net frame and the sealing plate. In order to meet the requirements of the building appearance, the whole bottom side of the big roof sealing plate to achieve the effect of smooth surface, and this surface is all assembled by the flat unit plate. A total area of more than 60,000 square meters of the bottom side of the sealing plate by nearly 60,000 flat unit plate assembled, and this nearly 60,000 flat unit plate without any two pieces of the same size. Chen Haiming said, the big roof is the Civic Center is the most colorful, but also the construction of the most difficult project, when the design of the Civic Center of the U.S. designers think that the big roof is wonderful, but I'm afraid that can not be done in China, because it is too difficult to do.

The big roof not only creates a "roc wings" shape, but also shades the sunlight from the building below, with energy-saving effect. In addition, the unique shading and rain protection features of the large roof will facilitate the organization of a variety of open-air activities under the roof.

5.8-meter-high sightseeing platform

Connecting the top floor of the Book City up to Lotus Hill

Walking up to the 5.8-meter-high platform between the twin towers in the central area of the Civic Center, and standing under the huge roof, you feel the smallness of an individual and the greatness of the Civic Center at once. The view of the north and south sides of the center is unobstructed, and the pleasure is not a "cool" word can be expressed.

The 5.8-meter-high platform is a place for sightseeing and relaxation, covering an area of 8,000 square meters, and there is an open-air stage to the south, which can be used for large-scale celebrations and cultural evenings. Civic Center and Hongli Road between the two pits will be built in Shenzhen Book City Center City, Book City for the underground ground **** two layers, the top platform and the Civic Center 5.8 m platform is connected, and across Hongli Road has been extended to the southern foot of Lotus Hill.

Standing on the platform looking up north, the top of Lotus Hill Deng Xiaoping statue is clearly visible. The kites over the Kite Square are dotted with stars, very nice. Looking south, lying across the central area of the Convention and Exhibition Center like a huge shell, Greater China Plaza, Shenzhen International Chamber of Commerce Center and Telecom Hub Building and other buildings in different postures stand in the central area; further south, it is Hong Kong's rolling green hills.

Architectural Milestones

[Edit]

In August 1996, the conceptual design of the Shenzhen City Hall submitted by the U.S.-based architectural firm of Lee Myung Yee/Tinchuler was determined to be the preferred plan;

On December 28, 1998, groundbreaking took place for the official construction of the Shenzhen Civic Center;

On May 31, 2004, the Civic Center will be officially opened.

Design Allegory

[edit]

The two towers of the Civic Center were designed in yellow and red, respectively, in reference to the dominant colors of the Chinese People's **** and State flags - red and yellow.

The reason for choosing blue for the design of the large roof is that not only is blue a color commonly accepted in Chinese tradition, but blue also symbolizes the sky. Thus, the red and yellow towers in the Civic Center, like giant pillars supporting the blue roof, imply that the people's power is supported by a blue sky. The meaning is endless and far-reaching.

In addition, the giant roof shape is prominent, reflecting the Shenzhen wings soaring symbolism, but also symbolizes the traditional Chinese roof eaves, long and winding eaves constitute a very grand momentum. Roof modeling has a strong sense of sculpture, its shape has just and soft, there are put and collected, the form is extremely stretching, breathtaking, not only show the traditional characteristics of the Chinese architectural structure, but also a great sense of permeability of the modern architectural verve.

Guidance

[Edit Paragraph]

With the May 31st Shenzhen Civic Center officially open to the public day by day, this covers an area of 100,000 square meters of huge building more and more attention from the public, and will soon be integrated into the life of every citizen.

The new phone format will be 8200××××

It is reported that the municipal government all "move" finished, the Civic Center office phone will be replaced by a new format: 8200××××, in order to make the public not to appear in the move during the old phone can not be found, and the new phone is no way to know the In order that the public will not be unable to find anyone by calling the old telephone during the moving period and have no way of knowing the new telephone, the Shenzhen Party and Government Telecommunication Bureau has made arrangements for this before the move, from the beginning of the move, the telephones of the moving units will be provided with 3-month notification of the change of the number of the tone of the public will be automatically informed of the new number when they call the original number, and all the external numbers (including the city government and one office outside of the compound) will be used in the Civic Center in the format of the new number of 8200×××× after the move into the Civic Center, and the new number will be used in the Civic Center. The new number will be in the format of 8200 , and all you have to do is dial the last four digits to make a call to each other.

Civic Center Office Departments

The first floor of the Bureau of Organ Affairs; Security Department; Food and Drug Administration; Tourism Bureau; Agriculture, Forestry and Fisheries Bureau; Population and Family Planning Bureau

The second floor of the Foreign Affairs Office; Cultural Affairs Bureau; Education Bureau; Environmental Protection Bureau

The third floor of the Bureau of Personnel (Talent Market Management Office); Bureau of Trade and Industry; WTO Affairs Center; Development and Reform Bureau

The second floor of the Civic Center is the Bureau of Foreign Affairs; Culture Bureau; Education Bureau; Environment Protection Bureau. Reform Bureau

Fourth Floor: Quality and Technical Supervision Bureau; Finance Office; Supervision Bureau

Fifth Floor: Legislative Affairs Office (Legal Adviser's Office); Statistical Bureau; Administration of Work Safety; Office of Foreign-Related Construction Review of the National Security Bureau; Monitoring Station of the Secrecy Bureau; Municipal Committee's Key Mechanisms Bureau (Office); Municipal Government's General Office

Citizen's Center Address: Citizen's Center, Fuzhong 3rd Road, Futian District, Shenzhen, 518034, China. Postal Code: 518034

8 routes to enter the square by car

Route 1: Take Shennan Boulevard, go west to Crystal Island, turn right into the parking lot of Civic Square;

Route 2: Go south on Caitian Road, turn right on Shennan Boulevard, turn right on Crystal Island and enter the parking lot of Civic Square;

Route 3: Go west along Binhe Road, turn right on Yitian Road, then right on Fuzhong Third Road, and then right on Fuzhong Third Road. Turn right onto Yitian Road, turn right onto Fuzhong Third Road, enter the Civic Square parking lot, and be careful not to take Jintian Road, as you can't turn left into the parking lot.

Route 4: Go north on Xinzhou Road, turn right on Fuzhong Road, turn right on Yitian Road, turn left on Fuzhong Third Road;

Route 5: Go on Yitian Road, turn right on Fuzhong Third Road, enter the parking lot of Civic Square.

Line 6 take Shennan Avenue, eastbound to Xinzhou Interchange and turn right, then northbound along Xinzhou Road and turn right on Fuchong Road, then take Yitian Road and Fuchong Third Road;

Line 7 Meilin Area southbound from Xinzhou Road, Jingtian Area eastbound from Hongli Road, then take Yitian Road and turn left on Fuchong Third Road;

Line 8 eastbound on Binhe Road, turn left on Yitian Road, then turn right on Fuchong Third Road into the parking lot of Civic Square. Square parking lot.

11 bus routes go straight to the Civic Center

Route 15 runs from Lower Meilin to Shixia Terminus, passing through Jingxin Garden, Jingtian Intersection, Children's Hospital, Gaojiahui Pavilion, and Futian New District Committee

Route 235 runs from Liuxianju to Huanggang Port, passing through Municipal Municipal Building, Lotus Hill, Gaojiahui Pavilion, Yitian Road, and Huanggang Hospital

Route 34 runs from Meilin JIU Station to Shisha, passing through Huanggang Hospital To Shimosa, via Huanggang Hospital, Fuhua Intersection, Civic Center, DMV

No. 35 Loop Terminus Lianhuashan, via Fuzhong Road, Yitian Road, Gaojiahui Pavilion, Lianhuashan, and the Central Hospital

No. 474 CMB runs from Futian Bus Terminal to Xinyi Holiday City in Buji, via Futian District Committee, Gaojiahui Pavilion, the Children's Hospital, and the Central Hospital

No. 105 runs from Sea World to Dexing Garden via Nanshan Hospital, SAR Newspaper, Civic Center and Jintian Intersection

Route 107 from Qiaocheng East to Dongchang via Municipal Services Building, Lotus Hill, Civic Center and Talent Building;

Route 232 from Civic Center East to Songhu via Civic Center, SAR Newspaper, Window of the World, Nanshan Cultural Center and Sea World

234 from Nantou Railway Station to Meilin Joint Inspection Station, via Nanshan District Government, Civic Center, Fuzhong Road Wanjia

236 from Huaxin Village to Songpingshan, via Jintian Road, Civic Center, Fuhua Intersection, Xinsha Middle School;

371 from Civic Center to Nanling Village, via Talent Market, Tianbei 4th Road, Buji Joint Inspection Station, Nanling Hospital

Attachments : According to the planning program of the Municipal Bureau of Transportation, by the 31st of this month, there will also be 10, 237 bus rerouting, as well as K12 adjusted to 38 buses after passing through the Civic Center.

Citizens will enjoy supporting services

Service name service project approval matters "one-stop" service

Citizen Center put into use, there will be more than 30 major government departments in the administrative services hall set up 145 service windows, accepting more than 390 examination and approval of the business covered by the certificate. The approval program of the main departments of the municipal government. Citizens in the administrative services hall can handle almost all the approval business, do not have to run several units for one thing.

"Information first delivery system" service

The opening of the administrative services hall will be the first time in Shenzhen to realize the "information first delivery system", the business license of enterprises, financial statements and other general information that needs to be provided, in the first government departments to submit

The staff of the Window Service Center has been working on a new project, which will be the first to realize the "first delivery system" for the first time in Shenzhen.

Courteous service of window staff

According to the requirements of the management body of the administrative service hall, the window staff in the hall need to be uniformly dressed during working hours, wearing a card, pay attention to the appearance of the instrument, enthusiasm and initiative, so that the clothes are neat, dignified, civilized and polite; need to properly keep documents, files, materials submitted by the public; prohibit smoking in the hall; not in the hall, such as meals. If a staff member violates the rules, the public can complain.

Equipped with a large screen, touch and other tips to the public

In the administrative services hall east and west of the two halls each have a touch screen 8, 2 large screens, plasma displays, 3, 4 queuing machines, consulting guide 1, fill in the form of 3 tables to facilitate prompting the public to handle the business and consulting. The hall is also equipped with hundreds of seats for the public to wait for the number of rest, computer guidance system, large plasma color TV and public phones and other convenient facilities.

East and west halls are equipped with drinking water

East and west halls are equipped with drinking water supply points, located at the entrance to the hall. The direct drinking water system drinking water terminals have a three-temperature type that provides boiling water, room temperature water and ice water, and a two-temperature type that provides boiling water and room temperature water. Drinking fountains are installed in each office, building and various exhibition halls, to the Civic Center to do business and visit the exhibition of the public can drink fresh, healthy, economical and convenient pipeline direct drinking water.

Eating and toileting are convenient

The institutional cafeteria on the negative floor of the Civic Center's central area is mainly used to meet the dining needs of 2,500 staff members. People who need to eat can go to the first floor of the fast-food restaurants, Western-style restaurants, where will be supplied from morning to night, such as in the event of an emergency, will also be open 24 hours. There is no toilet in the service hall, the public toilet to the service hall behind the corridor of the public toilet can be.

Business Center Services

There is a business center in the east hall of the administrative service hall, which can provide self-service Internet access, typing, photocopying and other services.