The mineral resources are mainly coal, and the recoverable amount of coal is more than 300 million tons. The educational facilities are perfect. There are county-level middle schools, boarding junior middle schools, 1 nine-year compulsory education schools, 15 complete primary schools, 2 private schools and 3 private kindergartens in the town.
Yemachuan Town has increasingly improved urban functions, developed economy and culture, rich coal resources, United and coordinated town and village teams, and a sound organizational structure. Enthusiastic, honest and trustworthy Yemachuan people sincerely welcome people from all walks of life to invest and develop, seek common development and create brilliance together.
In recent years, Yemachuan Town in Hezhang County has given full play to its geographical advantages, and on the basis of scientific positioning, it has sought the "Pingchuan Rise" of economic construction, promoted the "three-in-one synchronization" and promoted the all-round economic and social development.
Taking project construction as the starting point, and constantly promoting economic development. Increase investment attraction, strengthen communication and docking with large enterprises inside and outside the province, and strive for more projects to land in the park; Guide private funds and social capital to participate in the construction of key projects by means of BT and BOT. Increase the intensity of land storage, revitalize the stock, make big increments, and give priority to ensuring the construction land for key projects. 20 14 6.5km cement road from farm dam to Jianshantong village was completed. The 8.7 km cement road from Qingshi to Qingshan Tongcun issued by the city has also been fully started, and 5 km will be completed by the end of the year. Chelang 1 10KV substation has started and is under construction. 48 sets of government public rental housing have been basically completed and will be put into use soon; Complete the land acquisition work of walnut oil plant and steel structure plant. At present, the steel structure factory has entered the site and started construction. Start the planning survey and preliminary related work of urban main roads from Hezhang to Yemachuan.
Promoting the construction of parks and cities around the integration of production and cities. According to the requirements of the integration of production and city, upgrade, adjust and improve the planning of Dongcheng District, adjust and optimize land use and infrastructure construction. Do a good job in water supply, rain and sewage drainage and other pipe network projects, and build gas stations, public parking lots and garbage transfer stations. On the basis of established primary and secondary schools and kindergartens, we will vigorously develop supporting facilities such as education, medical care, culture, entertainment, public transportation, etc. that are compatible with urban functions, so as to meet the needs of industrial growth, population growth and urban development. Build hotels, supermarkets, logistics, property management, etc. At present, the first phase development and construction of Longlin Company has basically taken shape, with a total investment of 60 million yuan, and a total of 50,000 square meters of commercial housing has been built, and buildings 1 7 have been delivered. Construction of the 654.38+09,000 square meter building of China Shipping International Exhibition has started, and the shops on the third floor have been completed. The meeting site of Yemachuan of the Second and Sixth Red Army Corps has been completed, and the ancillary facilities of the square are now being improved. Luojiaba No.3, No.4 and the original gas station plots were successfully auctioned, and entered the planning and design stage, and construction will be started gradually. The total investment of the shantytown comprehensive renovation project is 65.438+0.2 billion yuan, and 654.38+0.365 houses are renovated, covering an area of 205,000 square meters, and basic functions such as kitchen and toilet are improved. The transformation of towns and villages along the 326 National Highway is 2.7 kilometers, and the farmers' market has invested a total of100000 yuan to transform underground sewage, natural gas, electric power communication and other pipe networks, which has been completed at present. The sewage treatment plant was built and put into use. The reconstruction project of Xiaoshuidong river bank was started in an all-round way, and the earthwork project was basically completed.