Current location - Recipe Complete Network - Complete cookbook of home-style dishes - How much is it to pour a cubic meter of concrete for the formwork of the highway contractor to repair the ditch?
How much is it to pour a cubic meter of concrete for the formwork of the highway contractor to repair the ditch?
For ditches with less than one side per meter, the simple labor cost is generally 70 ~ 80 yuan/meter. The specific amount of money per side needs to be converted according to the wall thickness of the ditch in your construction drawing to see how many squares there are per meter, and then the amount of money per side is divided by the number of squares per meter. More than per meter 1 m3, generally one side is around 1 10.