20 14 12 19 learned from Weinan municipal transportation bureau that on 12 16, the Weihe levee, Weihe bridge and lead works in Dongzha village, Beisheguan District, Yuemiao Sub-district Office of huayin city started to break ground, which marked 22/kloc-0.
It is understood that the project includes the construction of two bridges, Weihe Bridge and Luohe Bridge, and their two leads, with a budget investment of 330 million yuan. After 1 1 was approved by the Shaanxi Provincial Department of Transportation in mid-June, the bid of Luohe Bridge was opened yesterday and construction will start in the near future. The planned construction period is one year, and it is expected to open to traffic before the end of 20 15. The Weihe Bridge is planned to last for two years and has already started. It is estimated that the Luowei River Bridge and its lead works of 22 1 provincial highway will be completed and opened to traffic before the end of 20 16.
According to reports, the Luohe Bridge is 426 meters long and is located in Dali. Weihe Bridge is 47 10 meters long. The whole project runs through Dali and Huayin. The south bank levee is located in huayin city, and the north bank levee is located in Dali County. It is the longest trunk highway bridge project in Weinan City, with the most difficult construction and the highest time limit. It is also the fifth bridge of trunk highway crossing Weihe River in Weinan, and it is another milestone in the development history of trunk highway in Weinan.
As a control project along the Yellow River Highway, Luowei River Bridge and its pilot project, 22 1 provincial highway, will be fully completed and opened to traffic, connecting places of interest such as Xiyue Huashan, Fengtu Yicang, Qiachuan Wetland and Sima Qian Temple in series. It is understood that the total length of the highway along the Yellow River in this province is 9 10 km, involving Yulin, Yan 'an and Weinan 14 counties. Among them, in Weinan, it starts from Huashan in the south and reaches the junction of Han and Yi in the north, passing through 20 towns in Huayin, Dali, Heyang and Hancheng, with a planned total length of 172km and a construction mileage of 136km. At present, 85 kilometers have been built. After completion, it will not only improve the road network structure in Weinan and even the whole province, but also promote the economic development along the route and promote the development of tourism and tertiary industry in eastern Shaanxi.