Current location - Recipe Complete Network - Dinner recipes - Expansion Program Bigfoot
Expansion Program Bigfoot

Each of us has a pair of feet, in our daily life we can be very comfortable to manipulate them, because they are an important part of our body, completely at our disposal, have you ever thought, if you will be your feet and the second person, the third person, or even more people's feet are tied together when you can still control them freely? What would it take to do that?

Bigfoot expansion project basic information:

Project Name: Bigfoot (tram)

Time: 30 minutes

Suitable for the number of people: 12 -60 people

Category: site development projects, teamwork projects

Bigfoot expansion project Introduction:

The Bigfoot project requires all the participants in a large open field, with 8-12 people split into groups, each group of all the members of the two feet were stepped on two planks about 3.6 meters long and 0.15 meters wide, handheld two connected to the planks of the rope, in accordance with the coach's orders to move forward or backward (coaches can increase the difficulty of its, such as uphill, cornering, backward, etc.). The two planks are shoes, and team members stand on the plank shoes at the same time to walk until the destination.

Bigfoot expansion project rules:

1, the use of two sections of rope or drawing lines in the open field marking a good starting point and finish line;

2, marching on the way, any member of the team if the foot touches the ground that is regarded as a foul, must be re-boarded and then set off.

3, all the members of the left and right feet were standing on the left and right two boards, in any part of the body does not touch the ground, relying on the strength of the team, from the starting point to the end.

Bigfoot expansion project role:

1, cultivate team spirit, feel the relationship between the individual and the collective;

2, the team's progress is built on the basis of personal progress, only personal progress, in order to drive the whole team to move forward;

3, so that the players appreciate the team

4. To develop the leader's ability to quickly unify the team's will when the team encounters an emergency.

Bigfoot expansion project sharing points:

1, you think in this project reflects what problem?

2, one step at a time, down-to-earth people, doing things is more likely to succeed!

3, talk about team building in the team core is how to play a role?

4, working together is the foundation of a team's success.

5, everyone knows, but not necessarily everyone can do a good job, it is precisely the need for the team to learn and experience, which is ? Knowing is easy and practicing is difficult.

6, to improve the team organization, communication and collaboration capacity and skills, team leadership art and skills.

7, the rational allocation and use of human resources, before the action of the discussion and planning for the success or failure of things play an important role in training people to deal with things good planning and rationality, and cultivate the team's sense of collective honor, the team's dedication to the spirit.

8, the development of team coordination and cohesion to stimulate the team's willpower, the team in unison in order to win.

Operating Procedure:

1, so that we can focus on the layout of the project name, project objectives.

2, announced the rules of the project (first of all, in three rounds, first of all, the first round of rules).

3, speak project enough matters and project completion of the measurement standard (can be based on the starting point and the end of the end and the board of the first and last specific description).

4, start the first round, after the completion of the second round of rules began to be announced, and asked the representatives of the teams to consult and obtain a unified opinion, training in accordance with the rules chosen to implement the judging.

5. After the second round, start the third round of announced rules, pay attention to the teams may not discuss, the trainer to record the rules of each team separately, the implementation of the selected judgment.

Trainer monitoring points:

1, pay attention to the safety of the row head trainees to the end of the board tail through the finish line bit standard.

2. Trainees are not allowed to put their feet into the rope.

3, the principle of obeying the trainer's command.