Enterprise History of Fenxi Mining Group Company
1956

On June 65438+1 October1,Fenxi Mining Bureau was announced to be established, with 9 units including Fujiatan Coal Mine, Nanguan Coal Mine, zhang jia zhuang Coal Mine, Du Liang Coal Preparation Plant, Power Plant, Repair Shop, Jiexiu Coal Preparation Plant, Industrial Cadre School and Staff Hospital, with a total of 4,903 employees. The planned annual output of raw coal is/kloc-

From September 10 to 13, the first congress of Fenxi Mining Bureau was held.

On September 25th, Fenxi Mining Bureau Engineering Department and Du Liang Construction Engineering Co., Ltd. merged to form Fenxi Engineering Company, and at the same time, a Party Committee was established.

In 65438+February, the fuel geological team of Shaanxi Geological Bureau first explored small pulverized coal fields. After preliminary exploration, the coal reserves have reached 4.8 billion tons, with complete coal types and high quality, most of which are main coking coal.

1957

In June, the construction of Cuijiagou well in Du Liang Coal Mine started, with an annual design capacity of 450,000 tons. It was completed and put into operation at the end of 1958.

On September 23rd, Fenxi Mining Bureau officially opened in the new site of Xiguan, Jiexiu County.

1958

In April, Jiexiu Coal Preparation Plant started construction at a speed of 3 million tons/year. The first phase of 1970 was completed and put into operation, and the second phase of 1974 was completed and put into operation.

In September, Nanguan Power Plant was connected to the State Grid with a total capacity of 57200 KVA, 35 KVA transmission lines 167km and 7 substations.

On February 3, 65438, Liuwan Coal Mine broke ground. The designed well type is 300,000 tons/year, and it will be completed and put into production on June1962+February 3 1 day.

1959

65438+10.2, Fenxi Mining Newspaper was established, with Zhao Cunzhen, deputy secretary of the Party Committee of the bureau, as the president and Niu Chengde as the vice president. Fenxi Mining Newspaper is the organ newspaper of the Communist Party of China (CPC) Fenxi Mining Bureau. It is published twice a week in four editions.

On March 10, the mine construction of Shuiyu Coal Mine started. The mine1966 65438+/KLOC-0 was completed and put into operation on October 28th, with a designed annual output of 900,000 tons of raw coal.

On April 14, 20 female workers from Fujiatan Coal Mine formed the first female coal mining team in Fenxi Coalfield, with a daily output of 9.8 tons of raw coal.

In September, the Mine Rescue Team of Fenxi Mining Bureau was established.

1960

16 February, Liuwan Coal Mine Preparation Office was established.

In February 65438, the construction of Zijingou well in Nanguan Coal Mine started, with a designed well type of 450,000 tons/year./kloc-0 was completed and put into operation in February 1965.

196 1 year

12 In June, the chemical plant of Fenxi Mining Bureau was established, with 172 employees and an annual output of 1500 tons. In July, 1969, the bureau invested 265,438+10,000 yuan to build factories in three natural ditches in Xu Dong Township, Xiaoyi County. 1975 was completed in July and moved to a new address in August. 198465438+officially approved by the state in February, with an annual output of 5600 tons of gunpowder and 8 million detonators.

1962

65438+February 3 1, Liuwan Mine 1 Well was officially handed over and put into production, with an annual output of raw coal. 00,000 tons, at the same time, the Liuwan Coal Mine Preparation Office was abolished and Liuwan Coal Mine was established. Opened the first page of developing small pulverized coal fields and building small pulverized coal mining areas.

1963

On August 4th, Fujiatan Coal Mine successfully drilled the first empty well in hard rock stratum, ending the history of Fujiatan coal mine workers and local residents eating Fenhe water.

1965

In 65438+February, the second auxiliary shaft of Shuiyu Coal Mine in Xiaofeitian was put into production. At the same time, Shuiyu Coal Mine and Shuiyu Coal Mine Party Committee were established.

In February 65438, the third coal mine in the small coal field, Levin Coal Mine, started construction, with a design well type of 65438+200,000 tons/year. 1975 The well was completed and put into operation in February 2004.

The annual output exceeds 2 million tons.

1970

On February 15, the new site of Xiaoxi Chemical Plant of Fenxi Mining Bureau broke ground.

1 April, Fenxi Mining Bureau Technical School was established.

197 1 year

On June 30th, three tubular coal bunkers with a diameter of 15m and a height of 38.4m were built in Levin Coal Mine, with a capacity of11500t.

1973

On May 20th, Levin Coal Mine, a modern large-scale mine with an annual output of 6.5438+0.2 million tons, was completed and put into operation. On June 1 day, the front page of Shanxi Daily reported that Levin Coal Mine was successfully completed and put into operation, and distributed photos of the first coal train put into operation in Yang Yang Coal Mine taken by Xinhua News Agency.

1975

In July, the young coal mining team of Shuiyu Mine set a record of layered blasting mining in Fenxi Bureau; Created by the tunnel excavation team 4

The driving speed of semi-coal rock roadway has reached a new level and entered the ranks of the fourth national team.

In August, the raw coal output of No.4 Coal Mining Team in Shuiyu Mine was 3 1.076 tons, which doubled the level of the national first-class team.

For a while.

In September, No.1 Mining Team of Liuwan Coal Mine created a global record of 450m per month for a single hole in a semi-coal roadway.

The level of the home team has doubled. The zhang jia zhuang Mine Development Team's rock roadway is 302 meters per month, refreshing the overall situation.

At the level of the national team, the record of advancing has quadrupled.

65438+February 19, the construction of No.2 well in Liuwan Mine started, with an annual design capacity of10.2 million tons.

1979

65438+1 October1,with the approval of Shanxi Provincial Party Committee, the Revolutionary Committee of Fenxi Mining Bureau was abolished and Fenxi Mining Bureau was restored.

198 1 year

On February 27th, 65438, the expansion well (No.2 well) of Liuwan Mine was handed over and put into production, with an annual production capacity of 900,000 tons. The leaders of the Ministry of Coal, the provincial government and the Coal Department personally cut the ribbon.

1984

On June 4th, 65438 +65438 10, Shanxi Provincial Government issued the Notice on Delimitation of Coal Resources in Seven Mining Areas, including Datong. The actual reserves of Fenxi mining area are 346.27 square kilometers, accounting for 2.653 billion tons of coal reserves.

1986

On July 1 day, the technical renovation and expansion project of the power plant started. 1988 10, the first phase of the project was completed, and two newly installed 6000 kW generator sets were put into operation one after another. On April 25th, 1989, the second phase of the project started. Two 12000 kW generator sets were all put into operation at the end of 1990.

1988

111October, two 6000KW units in Nanguan power plant were put into operation. From June to February in 5438, the No.2 Mine Team of Levin produced 600,404 tons of raw coal annually, setting a new record for high-grade general mining in China. The third mining team in Shuiyu Coal Mine has an annual output of 356114,000 tons, ranking first in the national general mining team.

1998

In February, according to the notice of China Industrial Enterprise Information Publishing Center of the National Bureau of Statistics, Fenxi Mining Bureau

It is listed as one of the large and medium-sized industrial enterprises in China 1996- 1997.

In July, Fenxi Mining Bureau successfully purchased the mining right of Hexi Coal Mine in Liulin County, and Hexi Coal Mine announced its birthday.

Healthy.

On August 19, the first batch of clean coal was transported out of Shuiyu Mine, which indicated that Shuiyu Mine began to adjust its product structure.

An important step has been taken on the road.

10 10 18, Hexi Coal Mine was officially unveiled.

In June, 1 1, Fenxi Mining Bureau was rated as "AA-level" credit enterprise.

1998

In June 5438+10, Fenxi Mining Bureau was listed as a protected unit in Shanxi Province.

On July 29th, the coal preparation plant won the title of the first top ten coal preparation plants in China.

On September 18, the foundation stone laying ceremony was held for the technical transformation project in Shuang Liukuang, and the second westward campaign started.

65438+February, Fenxi Mining Bureau was reorganized into Shanxi Fenxi Mining Group Co., Ltd.

In 2000,

On February 23, 2000, the technical transformation project of power plant boilers started.

On August 30, 2000, Shanxi Fenxi Mining Group Co., Ltd. was formally established.

On September 18, 2000, the technical school was named as a provincial (ministerial) key technical school.

On September 30, 2000, the coking plant was officially put into operation.

On June 6, 2000, 65438+February 6, the group company signed an agreement with Shanxi Jinmei Industrial Development Company to merge Jiaocheng Juxin Coal Mine and renamed it Zhongxing Coal Mine.

200 1 year

On June 29th, the completion ceremony was held for the technical transformation project with an annual output of 6.5438+0.5 million tons in Shuangliu Coal Mine.

In June, the Group Company was awarded the honorary title of "Number of Quality Standardization Enterprises" in 2000 by China Coal Industry Association, and three units, Levin Mine, Liuwan Mine and Shuiyu Mine Company, were awarded the honorary title of "Industry-level Quality Standardization Mine".

In late July, Shuangliu Coal Preparation Plant with an annual washing capacity of 6.5438+0.5 million tons started construction.

65438+On February 28th, the 25th floor apartment building 1 of the group company was officially put into use.

In 2002

On April 2nd, the children's school of the engineering company was handed over to xiaoyi city for management and a signing ceremony was held.

On August 30th, the Coking Plant held a ribbon-cutting ceremony for the second baking oven.

On September 6th, the State Council approved the closure and bankruptcy of Du Liang Mining Company, Nanguan Company and zhang jia zhuang Company.

On September 16, the foundation stone was laid for the tar processing project of coking plant.

165438+ 10 18, Liu Xin liuwan mine chemical co., ltd was unveiled.

165438+1On October 20th, Wang Jiahui Coal Gathering Station and Wang Jiahui Station were completed and cut the ribbon.

In 2004

On March 12, Shanxi Fenxi Shuguang Coal Industry Co., Ltd., Shanxi Fenxi Zhongxing Coal Industry Co., Ltd. and Shanxi Fenxi Zijin Coal Industry Co., Ltd. were established with the approval of the joint meeting of the party and government of the group company.

On April 5th, Shuguang Coal Preparation Plant laid the foundation stone, with an annual washing capacity of 654.38+500,000 tons.

On April 8, the power supply company was formally established.

On April 18, Liuwan Coal Preparation Plant with an annual washing capacity of10.8 million tons was completed and put into operation.

In July, Shuang Liukuang 2 17 fully mechanized working face, the largest fully mechanized working face of the Group Company, was put into production.

On July 29th, Fujiatan Company Fu Wei Rubber Co., Ltd. was unveiled and put into production.

On September 17, Jingyu Coal Washing Heavy Media Company, an industry and trade company, was unveiled and put into production.

1June 818th, the foundation stone was laid for a 2×50MW comprehensive utilization power plant.

1October 165438+ 13, the group company's annual cumulative raw coal output reached 100 15888 tons, and the group company entered the ranks of super-large briquette enterprises.

165438+1On October 25th, China Industrial and Commercial Bank Shanxi Branch cooperated with our group company in an all-round way, and the signing ceremony of Xinyang Shuangliu 1 1 10,000-ton mine construction project financing agreement was held in Taiyuan, with the total financing amount of about1300 million yuan.

In 2005

/kloc-in February, 2008, Shanxi Fenxi Shuguang Coal Industry Co., Ltd. was established.

On February 26th, Shanxi Fenxi Zijin Coal Industry Co., Ltd. was unveiled.

On April 7th, the foundation stone was laid for the coal preparation plant of Shuiyu Mining Company. On April 1 1, the foundation stone was laid for the dense medium transformation project of the coal preparation plant.

On April 14, the foundation stone was laid for Hexi Coal Preparation Plant.

On September 26, the chemical company held a mobilization meeting for restructuring, and the main and auxiliary parts were separated, and the overall restructuring entered the substantive operation stage.

10 On June 5438+02, the technical transformation project of dense medium process in coal preparation plant was completed.

19 June 19, the foundation stone was laid for Xinyang 6 million tons coal preparation plant project.

10 year1October 26th, Hexi Coal Preparation Plant was completed.

On February 8, 65438, Shanxi Fenxi Coal Chemical Technician College was established.